Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-103-12081
Well Classification: GW Status: SI - 9/1/2024
Well Name/No:FEDERAL #RGU 533-24-198
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC60733
Facility Status:SIStatus Date9/1/2024
FacilityID:435609LocationID:335724
County:RIO BLANCO #103Location:LOT 10 24 1S98W 6
Field:SULPHUR CREEK - #80090Elevation:6595 ft.
Planned Location:2173FSL  1715 FELLat/Long: 39.947560 / -108.339402Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.947559 / -108.339404Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 7/30/2014
End Date: 9/3/2014
Reported: 10/2/2014
Days to report: 29
Disclosure: Sidetrack #00
Start Date: 6/3/2018
End Date: 6/6/2018
Reported: 6/18/2018
Days to report: 12
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: SI - 9/1/2024             Measured TD: 12783 ft.    Vertical TD: 12769 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        SI - 9/1/2024
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:12/26/2015
Prop Depth/Form:12786 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit:RYAN GULCH UNIT Unit Number:068239X
Formation And Spacing:Code: ILES , Formation: ILES , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: SEGO , Formation: SEGO , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: , Unit Acreage: , Drill Unit:
Casing:String Type: CONDUCTOR, Hole Size: 30 in., Size: 18 in., Top: 0 ft., Depth: 80 ft., Weight: 48 , Citings Type: PLANNED
Cement:Sacks: 60, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 3901 ft., Weight: 32.3 , Citings Type: PLANNED
Cement:Sacks: 1415, Top: 0 ft., Bottom: 3901 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 12786 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 1317, Top: 7716 ft., Bottom: 12786 ft.

Wellbore Completed
Completion Date:5/8/2014
Spud Date:4/11/2014Spud Date Is:ACTUAL
Measured TD:12783 ft.Measured PB depth:12717 ft.
True Vertical TD:12769 ft.True Vertical PB depth:12703 ft.
Top PZ Location:Sec:24 Twp: 1S 98WFootage: 2539 FSL  1775 FELDepth
Bottom Hole Location:Sec:24 Twp: 1S 98WFootage: 2523 FSL  1766 FELDepth
Log Types:CBL, Mud, and Reservoir Performance Monitor (RPM)
Casing:String Type: CONDUCTOR, Hole Size: , Size: , Top: 0 ft., Depth: 63 ft., Weight: 48 , Citings Type: ACTUAL
Cement:Sacks: 25, Top: 0 ft., Bottom: 63 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 3924 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 795, Top: 0 ft., Bottom: 3924 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 12773 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 1815, Top: 6444 ft., Bottom: 12773 ft., Determination Method: CBL
Additional Cement:String Type: SURF , Top: 0 ft., Depth: 1804 ft., Bottom: 1804 ft., Sacks: 1100, Method: DV TOOL
FormationInterval TopLog BottomCoredDSTs
WASATCH G5832 ft.
MESAVERDE7898 ft.
CAMEO11022 ft.
ROLLINS11562 ft.
COZZETTE11693 ft.
CORCORAN11912 ft.
SEGO12302 ft.

Formation SEGO                     Formation Classification:  OW                     Status:  SI - 9/1/2024                  Interval Top: 12320 ft.    Interval Bottom: 12485 ft.

 Completed Information for Formation SEGO
1st Production Date:7/13/2014Choke Size: 
Formation Name:SEGOCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:7/30/2014Treatment End Date:7/30/2014
Treatment Summary:500 Gals 7 1/2% HCL; 79419#40/70, 6250 20/40 Sand; 2985 Bbls Slickwater; (Summary) *All flowback water entries are total estimates based on comingled volumes.
Total fluid used in treatment (bbls):2996Max pressure during treatment (psi):6926
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):11Min frac gradient (psi/ft):0.57
Recycled water used in treatment (bbls):2985Total flowback volume recovered (bbls):21105
Fresh water used in treatment (bbls):Disposition method For flowback:RECYCLE
Total proppant used (lbs):85669Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation SEGO.
Perforation Data:
Interval Top:12320 ft.# Of Holes:27
Interval Bottom:12485 ft.Hole Size:0.35 in.

Formation CRCRN                   Formation Classification:  OW                   Status:  SI - 9/1/2024                  Interval Top: 11952 ft.    Interval Bottom: 12249 ft.

 Completed Information for Formation CORCORAN
1st Production Date:7/13/2014Choke Size: 
Formation Name:CORCORANCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:7/30/2014Treatment End Date:7/30/2014
Treatment Summary:500 Gals 7 1/2% HCL; 129135#40/70, 8750 20/40 Sand; 5045 Bbls Slickwater; (Summary) *All flowback water entries are total estimates based on comingled volumes.
Total fluid used in treatment (bbls):5056Max pressure during treatment (psi):7300
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):11Min frac gradient (psi/ft):0.61
Recycled water used in treatment (bbls):5045Total flowback volume recovered (bbls):21105
Fresh water used in treatment (bbls):Disposition method For flowback:RECYCLE
Total proppant used (lbs):137885Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CRCRN.
Perforation Data:
Interval Top:11952 ft.# Of Holes:35
Interval Bottom:12249 ft.Hole Size:0.35 in.

Formation WFILS                   Formation Classification:  OG                   Status:  TA - 8/1/2023                  Interval Top: 9907 ft.    Interval Bottom: 12485 ft.

 Completed Information for Formation WILLIAMS FORK-ILES
1st Production Date:9/3/2014Choke Size: 
Formation Name:WILLIAMS FORK-ILESCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:7/30/2014Treatment End Date:9/3/2014
Treatment Summary:4000 Gals 7 1/2% HCL; 1081319#40/70, 55000# 20/40 Sand; 31142.85 Bbls Slickwater; (Summary) *All flowback water entries are total estimates based on comingled volumes.
Total fluid used in treatment (bbls):31237Max pressure during treatment (psi):7712
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:6
Total acid used in treatment (bbls):95Min frac gradient (psi/ft):0.50
Recycled water used in treatment (bbls):31142Total flowback volume recovered (bbls):21105
Fresh water used in treatment (bbls):Disposition method For flowback:RECYCLE
Total proppant used (lbs):1136319Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BTU_GAS 1148
CALC_MCF_GAS 624
CASING_PRESS 1323
MCF_GAS 624
TUBING_PRESS 807
Perforation Data:
Interval Top:9907 ft.# Of Holes:195
Interval Bottom:12485 ft.Hole Size:0.35 in.

Formation WMFK                     Formation Classification:  OG                     Status:  TA - 8/1/2023                  Interval Top: 9553 ft.    Interval Bottom: 9856 ft.

 Completed Information for Formation WILLIAMS FORK
1st Production Date:N/AChoke Size: 
Formation Name:WILLIAMS FORKCommingled:
Production Method:
Open Hole Completion:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation WMFK.
Perforation Data:
Interval Top:9553 ft.# Of Holes:24
Interval Bottom:9856 ft.Hole Size:0.35 in.

Formation WFCM                     Formation Classification:  GW                     Status:  TA - 10/17/2024                Interval Top: 8974 ft.    Interval Bottom: 9529 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:N/AChoke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:5/21/2018Treatment End Date:6/18/2018
Treatment Summary:14209 bbls of slickwater; No Proppant; 642 gals of biocide
Total fluid used in treatment (bbls):14224Max pressure during treatment (psi):7712
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:4
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.50
Recycled water used in treatment (bbls):14209Total flowback volume recovered (bbls):21105
Fresh water used in treatment (bbls):15Disposition method For flowback:RECYCLE
Total proppant used (lbs):Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:7/30/2014Treatment End Date:9/3/2014
Treatment Summary:3000 Gals 7 1/2% HCL; 572765#40/70, 40000 20/40 Sand; 23112 Bbls Slickwater; (Summary) *All flowback water entries are total estimates based on comingled volumes.
Total fluid used in treatment (bbls):23184Max pressure during treatment (psi):7712
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:6
Total acid used in treatment (bbls):71Min frac gradient (psi/ft):0.50
Recycled water used in treatment (bbls):23113Total flowback volume recovered (bbls):21105
Fresh water used in treatment (bbls):Disposition method For flowback:RECYCLE
Total proppant used (lbs):612765Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation WFCM.
Perforation Data:
Interval Top:8974 ft.# Of Holes:72
Interval Bottom:9529 ft.Hole Size:0.35 in.
Primary Well Designation:
Low Producing      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingYProduction Period
10/2023 - 09/2024

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2023 - September 2024i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)149
GOR
GOR DeterminationMCFE
Average BOE per Day0.071
Average MCFE per Day0.407

 Federal Financial Assurance  i Y

 Tribal Well  i No