|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 2/1/2022 Measured TD: 12885 ft. Vertical TD: 12469 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 2/1/2022 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 7/12/2015 | | Proposed Top PZ Location: | Sec:26 Twp: 1S 98W | Footage: 494 FSL 971 FEL | | Bottom Hole Location: | Sec:26 Twp: 1S 98W | Footage: 490 FSL 988 FEL | | Proposed Depth/Form: | 12727 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEDERAL | Surface Owner: | FEDERAL | | Unit: | RYAN GULCH UNIT | Unit Number: | 068239X | | Formation And Spacing: | Code: ILES , Formation: ILES , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: SEGO , Formation: SEGO , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: WFCM , Formation: WILLIAMS FORK - CAMEO , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: WMFK , Formation: WILLIAMS FORK , Order: , Unit Acreage: , Drill Unit: | | Casing: | String Type: CONDUCTOR, Hole Size: 30 in., Size: 18 in., Top: 0 ft., Depth: 80 ft., Weight: 48 , Citings Type: PLANNED | | Cement: | Sacks: 50, Top: 0 ft., Bottom: 80 ft. | | Casing: | String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 4119 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 1374, Top: 0 ft., Bottom: 4119 ft. | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 13170 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 1386, Top: 7791 ft., Bottom: 13170 ft. |
| | |
| Wellbore Completed | | Completion Date: | 12/25/2014 | | Spud Date: | 12/11/2014 | Spud Date Is: | ACTUAL | | Measured TD: | 12885 ft. | Measured PB depth: | 12842 ft. | | True Vertical TD: | 12469 ft. | True Vertical PB depth: | 12426 ft. | | Top PZ Location: | Sec:26 Twp: 1S 98W | Footage: 494 FSL 971 FEL | | Bottom Hole Location: | Sec:26 Twp: 1S 98W | Footage: 490 FSL 988 FEL | | Log Types: | CBL/MUD/RPM/Triple Combo in API 103-11988 | | Casing: | String Type: CONDUCTOR, Hole Size: 30 in., Size: 18 in., Top: 0 ft., Depth: 84 ft., Weight: 48 , Citings Type: ACTUAL | | Cement: | Sacks: 31, Top: 0 ft., Bottom: 84 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 4178 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 840, Top: 1889 ft., Bottom: 4178 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 12879 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 2000, Top: 5031 ft., Bottom: 12879 ft., Determination Method: CBL | | Additional Cement: | String Type: SURF , Top: 0 ft., Depth: 1889 ft., Bottom: 1889 ft., Sacks: 1065, Method: DV TOOL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | WASATCH G | 6013 ft. | | | | | WILLIAMS FORK | 7992 ft. | | | | | MESAVERDE | 7992 ft. | | | | | CAMEO | 11029 ft. | | | | | ROLLINS | 11621 ft. | | | | | COZZETTE | 11750 ft. | | | | | CORCORAN | 11955 ft. | | | | | SEGO | 12341 ft. | | | |
Formation SEGO Formation Classification: OW Status: PR - 2/1/2022 Interval Top: 12389 ft. Interval Bottom: 12686 ft.| Completed Information for Formation SEGO | | 1st Production Date: | 8/19/2015 | Choke Size: | | | Formation Name: | SEGO | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 8/13/2015 | Treatment End Date: | 8/13/2015 | | Treatment Summary: | 1000 Gals 10% HCL; 11379 Bbls Slickwater; 273471 #40/70 Sand; 16096 #20/40 Sand: (Summary)
| | Total fluid used in treatment (bbls): | 11403 | Max pressure during treatment (psi): | 8349 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.43 | | Type Of gas: | | Number Of staged intervals: | 2 | | Total acid used in treatment (bbls): | 24 | Min frac gradient (psi/ft): | 0.66 | | Recycled water used in treatment (bbls): | 11379 | Total flowback volume recovered (bbls): | 5875 | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | RECYCLE | | Total proppant used (lbs): | 289567 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation SEGO. |
| | Perforation Data: | | Interval Top: | 12389 ft. | # Of Holes: | 48 | | Interval Bottom: | 12686 ft. | Hole Size: | 0.35 in. |
|
Formation CRCRN Formation Classification: OW Status: PR - 2/1/2022 Interval Top: 12015 ft. Interval Bottom: 12504 ft.| Completed Information for Formation CORCORAN | | 1st Production Date: | 8/19/2015 | Choke Size: | | | Formation Name: | CORCORAN | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 8/14/2015 | Treatment End Date: | 8/12/2015 | | Treatment Summary: | 1000 Gals 10% HCL; 13688 Bbls Slickwater; 341739 #40/70 Sand; 20012 #20/40 Sand: (Summary)
| | Total fluid used in treatment (bbls): | 13712 | Max pressure during treatment (psi): | 8349 | | Total gas used in treatment (mcf): | 13712 | Fluid density (lbs/gal): | 8.43 | | Type Of gas: | | Number Of staged intervals: | 2 | | Total acid used in treatment (bbls): | 24 | Min frac gradient (psi/ft): | 0.66 | | Recycled water used in treatment (bbls): | 13688 | Total flowback volume recovered (bbls): | 5875 | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | RECYCLE | | Total proppant used (lbs): | 361751 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CRCRN. |
| | Perforation Data: | | Interval Top: | 12015 ft. | # Of Holes: | 48 | | Interval Bottom: | 12504 ft. | Hole Size: | 0.35 in. |
|
Formation COZZ Formation Classification: OW Status: PR - 2/1/2022 Interval Top: 11827 ft. Interval Bottom: 11970 ft.| Completed Information for Formation COZZETTE | | 1st Production Date: | 8/19/2015 | Choke Size: | | | Formation Name: | COZZETTE | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 8/14/2015 | Treatment End Date: | 8/14/2015 | | Treatment Summary: | 500 Gals 10% HCL; 6385 Bbls Slickwater; 157905 # 40/70 sand; 9302 # 20/40 Sand (Summary)
| | Total fluid used in treatment (bbls): | 6397 | Max pressure during treatment (psi): | 8349 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.43 | | Type Of gas: | | Number Of staged intervals: | 1 | | Total acid used in treatment (bbls): | 12 | Min frac gradient (psi/ft): | 0.66 | | Recycled water used in treatment (bbls): | 6385 | Total flowback volume recovered (bbls): | 5875 | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | RECYCLE | | Total proppant used (lbs): | 167207 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation COZZ. |
| | Perforation Data: | | Interval Top: | 11827 ft. | # Of Holes: | 24 | | Interval Bottom: | 11970 ft. | Hole Size: | 0.35 in. |
|
Formation WFCCCS Formation Classification: GW Status: CM - 9/10/2015 Interval Top: 10084 ft. Interval Bottom: 12686 ft.| Completed Information for Formation WILLIAMS FORK-CAMEO-COZZETTE-CORCORAN-SEGO | | 1st Production Date: | 8/19/2015 | Choke Size: | | | Formation Name: | WILLIAMS FORK-CAMEO-COZZETTE-CORCORAN-SEGO | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 8/13/2015 | Treatment End Date: | 8/18/2015 | | Treatment Summary: | 4000 Gals 7 1/2% HCL; 81281 Bbls Slickwater; 1971355 #40/70 Sand; 126580 #20/40 Sand: (Summary)
| | Total fluid used in treatment (bbls): | 81376 | Max pressure during treatment (psi): | 8349 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.43 | | Type Of gas: | | Number Of staged intervals: | 13 | | Total acid used in treatment (bbls): | 95 | Min frac gradient (psi/ft): | 0.66 | | Recycled water used in treatment (bbls): | 81281 | Total flowback volume recovered (bbls): | 23500 | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | RECYCLE | | Total proppant used (lbs): | 2097935 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 12270 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 9/10/2015 | Test Method: | flowing | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BTU_GAS | 1070 | | CALC_MCF_GAS | 1676 | | CASING_PRESS | 1964 | | MCF_GAS | 1676 | | TUBING_PRESS | 2588 |
| | Perforation Data: | | Interval Top: | 10084 ft. | # Of Holes: | 312 | | Interval Bottom: | 12686 ft. | Hole Size: | 0.35 in. |
|
Formation WFCM Formation Classification: OW Status: PR - 2/1/2022 Interval Top: 10084 ft. Interval Bottom: 11573 ft.| Completed Information for Formation WILLIAMS FORK - CAMEO | | 1st Production Date: | 8/19/2015 | Choke Size: | | | Formation Name: | WILLIAMS FORK - CAMEO | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 8/15/2015 | Treatment End Date: | 8/18/2015 | | Treatment Summary: | 1500 Gals 10% HCL; 49828 Bbls Slickwater; 1198240 #40/70 Sand; 81170 #20/40 Sand: (Summary)
| | Total fluid used in treatment (bbls): | 49864 | Max pressure during treatment (psi): | 8349 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.43 | | Type Of gas: | | Number Of staged intervals: | 8 | | Total acid used in treatment (bbls): | 36 | Min frac gradient (psi/ft): | 0.66 | | Recycled water used in treatment (bbls): | 49828 | Total flowback volume recovered (bbls): | 5875 | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | RECYCLE | | Total proppant used (lbs): | 1279410 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation WFCM. |
| | Perforation Data: | | Interval Top: | 10084 ft. | # Of Holes: | 192 | | Interval Bottom: | 11573 ft. | Hole Size: | 0.35 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 258 |
| Total Gas Produced (MCF) | 38282 |
| GOR | 148379 |
| GOR Determination | MCFE |
| Average BOE per Day | 18.807 |
| Average MCFE per Day | 109.104 |
| Federal Financial Assurance | i | Y |
|
|