|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 3/1/2022 Measured TD: 12561 ft. Vertical TD: 12224 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 3/1/2022 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 7/12/2015 | | Proposed Top PZ Location: | Sec:26 Twp: 1S 98W | Footage: 2479 FSL 2072 FWL | | Bottom Hole Location: | Sec:26 Twp: 1S 98W | Footage: 2468 FSL 2007 FWL | | Proposed Depth/Form: | 12547 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEDERAL | Surface Owner: | FEDERAL | | Unit: | RYAN GULCH UNIT | Unit Number: | 068239X | | Formation And Spacing: | Code: ILES , Formation: ILES , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: SEGO , Formation: SEGO , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: WFCM , Formation: WILLIAMS FORK - CAMEO , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: WMFK , Formation: WILLIAMS FORK , Order: , Unit Acreage: , Drill Unit: | | Casing: | String Type: CONDUCTOR, Hole Size: 30 in., Size: 18 in., Top: 0 ft., Depth: 80 ft., Weight: 48 , Citings Type: PLANNED | | Cement: | Sacks: 50, Top: 0 ft., Bottom: 80 ft. | | Casing: | String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 4025 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 1330, Top: 0 ft., Bottom: 4025 ft. | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 12625 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 1310, Top: , Bottom: 12625 ft. |
| | |
| Wellbore Completed | | Completion Date: | 5/20/2015 | | Spud Date: | 3/3/2015 | Spud Date Is: | ACTUAL | | Measured TD: | 12561 ft. | Measured PB depth: | 12530 ft. | | True Vertical TD: | 12224 ft. | True Vertical PB depth: | 12193 ft. | | Top PZ Location: | Sec:26 Twp: 1S 98W | Footage: 2479 FSL 2072 FWL | | Bottom Hole Location: | Sec:26 Twp: 1S 98W | Footage: 2468 FSL 2007 FWL | | Log Types: | CBL/MUD/RPM/Triple Combo in API 103-11988 | | Casing: | String Type: CONDUCTOR, Hole Size: 30 in., Size: 18 in., Top: 0 ft., Depth: 66 ft., Weight: 47.4 , Citings Type: ACTUAL | | Cement: | Sacks: 25, Top: 0 ft., Bottom: 66 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 4025 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 815, Top: 1846 ft., Bottom: 4025 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 12560 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 1895, Top: 5708 ft., Bottom: 12560 ft., Determination Method: CBL | | Additional Cement: | String Type: SURF , Top: 25 ft., Depth: 1846 ft., Bottom: 1846 ft., Sacks: 925, Method: DV TOOL | | Additional Cement: | String Type: SURF , Top: 0 ft., Depth: 25 ft., Bottom: 25 ft., Sacks: 24, Method: 1 INCH | | Formation | Interval Top | Log Bottom | Cored | DSTs | | WASATCH G | 5733 ft. | | | | | WILLIAMS FORK | 7909 ft. | | | | | MESAVERDE | 7909 ft. | | | | | CAMEO | 10921 ft. | | | | | ROLLINS | 11506 ft. | | | | | COZZETTE | 11635 ft. | | | | | CORCORAN | 11858 ft. | | | | | SEGO | 12236 ft. | | | |
Formation SEGO Formation Classification: OW Status: PR - 11/18/2016 Interval Top: 12237 ft. Interval Bottom: 12491 ft.| Completed Information for Formation SEGO | | 1st Production Date: | 11/21/2015 | Choke Size: | | | Formation Name: | SEGO | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 11/9/2015 | Treatment End Date: | 11/10/2015 | | Treatment Summary: | 2000 Gals 10% HCL; 43428 BBLS Slickwater; 211042 40/70 Sand; (summary)
| | Total fluid used in treatment (bbls): | 43476 | Max pressure during treatment (psi): | 7441 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.43 | | Type Of gas: | | Number Of staged intervals: | 2 | | Total acid used in treatment (bbls): | 48 | Min frac gradient (psi/ft): | 0.58 | | Recycled water used in treatment (bbls): | 43428 | Total flowback volume recovered (bbls): | 4928 | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | RECYCLE | | Total proppant used (lbs): | 211042 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation SEGO. |
| | Perforation Data: | | Interval Top: | 12237 ft. | # Of Holes: | 48 | | Interval Bottom: | 12491 ft. | Hole Size: | 0.35 in. |
|
Formation CRCRN Formation Classification: OW Status: PR - 11/18/2016 Interval Top: 11858 ft. Interval Bottom: 12230 ft.| Completed Information for Formation CORCORAN | | 1st Production Date: | 11/21/2015 | Choke Size: | | | Formation Name: | CORCORAN | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 11/10/2015 | Treatment End Date: | 11/11/2015 | | Treatment Summary: | 2000 Gals 10% HCL; 46124 BBLS Slickwater; 226999 40/70 Sand; (Summary)
| | Total fluid used in treatment (bbls): | 46171 | Max pressure during treatment (psi): | 7441 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.43 | | Type Of gas: | | Number Of staged intervals: | 2 | | Total acid used in treatment (bbls): | 48 | Min frac gradient (psi/ft): | 0.58 | | Recycled water used in treatment (bbls): | 46124 | Total flowback volume recovered (bbls): | 5233 | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | RECYCLE | | Total proppant used (lbs): | 226999 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CRCRN. |
| | Perforation Data: | | Interval Top: | 11858 ft. | # Of Holes: | 48 | | Interval Bottom: | 12230 ft. | Hole Size: | 0.35 in. |
|
Formation COZZ Formation Classification: OW Status: PR - 3/1/2022 Interval Top: 11713 ft. Interval Bottom: 11851 ft.| Completed Information for Formation COZZETTE | | 1st Production Date: | 11/21/2015 | Choke Size: | | | Formation Name: | COZZETTE | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 11/11/2015 | Treatment End Date: | 11/11/2015 | | Treatment Summary: | 1000 Gals 10% HCL; 27641 BBLs Slickwater; 137833 40/70 Sand; (summary)
| | Total fluid used in treatment (bbls): | 27665 | Max pressure during treatment (psi): | 7441 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.43 | | Type Of gas: | | Number Of staged intervals: | 1 | | Total acid used in treatment (bbls): | 24 | Min frac gradient (psi/ft): | 0.58 | | Recycled water used in treatment (bbls): | 27641 | Total flowback volume recovered (bbls): | 3136 | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | RECYCLE | | Total proppant used (lbs): | 137833 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation COZZ. |
| | Perforation Data: | | Interval Top: | 11713 ft. | # Of Holes: | 24 | | Interval Bottom: | 11851 ft. | Hole Size: | 0.35 in. |
|
Formation WFCCCS Formation Classification: GW Status: CM - 12/3/2015 Interval Top: 9187 ft. Interval Bottom: 12491 ft.| Completed Information for Formation WILLIAMS FORK-CAMEO-COZZETTE-CORCORAN-SEGO | | 1st Production Date: | 11/21/2015 | Choke Size: | | | Formation Name: | WILLIAMS FORK-CAMEO-COZZETTE-CORCORAN-SEGO | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 11/9/2015 | Treatment End Date: | 11/16/2015 | | Treatment Summary: | 9000 Gals 10% HCL; 420254 BBLS Slickwater; 1651835 40/70 Sand; (summary)
| | Total fluid used in treatment (bbls): | 420469 | Max pressure during treatment (psi): | 7441 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.43 | | Type Of gas: | | Number Of staged intervals: | 18 | | Total acid used in treatment (bbls): | 215 | Min frac gradient (psi/ft): | 0.58 | | Recycled water used in treatment (bbls): | 420254 | Total flowback volume recovered (bbls): | 47656 | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | RECYCLE | | Total proppant used (lbs): | 1651835 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 11982 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 12/3/2015 | Test Method: | Flowing | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BTU_GAS | 1085 | | CALC_MCF_GAS | 447 | | CASING_PRESS | 3761 | | MCF_GAS | 447 | | TUBING_PRESS | 2014 |
| | Perforation Data: | | Interval Top: | 9187 ft. | # Of Holes: | 432 | | Interval Bottom: | 12491 ft. | Hole Size: | 0.35 in. |
|
Formation WFCM Formation Classification: OW Status: PR - 11/18/2016 Interval Top: 9187 ft. Interval Bottom: 11451 ft.| Completed Information for Formation WILLIAMS FORK - CAMEO | | 1st Production Date: | 11/21/2015 | Choke Size: | | | Formation Name: | WILLIAMS FORK - CAMEO | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 11/12/2015 | Treatment End Date: | 11/18/2015 | | Treatment Summary: | 4000 Gals 10% HCL; 303061 BBLs Slickwater; 1075961 40/70 Sand; (Summary)
| | Total fluid used in treatment (bbls): | 303156 | Max pressure during treatment (psi): | 7441 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.43 | | Type Of gas: | | Number Of staged intervals: | 13 | | Total acid used in treatment (bbls): | 95 | Min frac gradient (psi/ft): | 0.58 | | Recycled water used in treatment (bbls): | 303061 | Total flowback volume recovered (bbls): | 34360 | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | RECYCLE | | Total proppant used (lbs): | 1075961 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation WFCM. |
| | Perforation Data: | | Interval Top: | 9187 ft. | # Of Holes: | 312 | | Interval Bottom: | 11451 ft. | Hole Size: | 0.35 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 417 |
| Total Gas Produced (MCF) | 60851 |
| GOR | 145925 |
| GOR Determination | MCFE |
| Average BOE per Day | 29.923 |
| Average MCFE per Day | 173.542 |
| Federal Financial Assurance | i | Y |
|
|