|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 8/1/2022 Measured TD: 12799 ft. Vertical TD: 12565 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 8/1/2022 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 7/12/2015 | | Proposed Top PZ Location: | Sec:25 Twp: 1S 98W | Footage: 1636 FSL 298 FWL | | Bottom Hole Location: | Sec:25 Twp: 1S 98W | Footage: 1604 FSL 226 FWL | | Proposed Depth/Form: | 12731 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEDERAL | Surface Owner: | FEDERAL | | Unit: | RYAN GULCH UNIT | Unit Number: | 068239X | | Formation And Spacing: | Code: ILES , Formation: ILES , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: SEGO , Formation: SEGO , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: WFCM , Formation: WILLIAMS FORK - CAMEO , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: WMFK , Formation: WILLIAMS FORK , Order: , Unit Acreage: , Drill Unit: | | Casing: | String Type: CONDUCTOR, Hole Size: 30 in., Size: 18 in., Top: 0 ft., Depth: 80 ft., Weight: 48 , Citings Type: PLANNED | | Cement: | Sacks: 50, Top: 0 ft., Bottom: 80 ft. | | Casing: | String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 4007 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 1333, Top: 0 ft., Bottom: 4007 ft. | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 12919 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 1360, Top: 7696 ft., Bottom: 12919 ft. |
| | |
| Wellbore Completed | | Completion Date: | 4/29/2015 | | Spud Date: | 3/9/2015 | Spud Date Is: | ACTUAL | | Measured TD: | 12799 ft. | Measured PB depth: | 12768 ft. | | True Vertical TD: | 12565 ft. | True Vertical PB depth: | 12534 ft. | | Top PZ Location: | Sec:25 Twp: 1S 98W | Footage: 1636 FSL 298 FWL | | Bottom Hole Location: | Sec:25 Twp: 1S 98W | Footage: 1604 FSL 226 FWL | | Log Types: | CBL/MUD/RPM/Triple Combo in API 103-11988 | | Casing: | String Type: CONDUCTOR, Hole Size: 30 in., Size: 18 in., Top: 0 ft., Depth: 87 ft., Weight: 47.4 , Citings Type: ACTUAL | | Cement: | Sacks: 33, Top: 0 ft., Bottom: 87 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 4038 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 815, Top: 1839 ft., Bottom: 4038 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 12797 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 1915, Top: 7096 ft., Bottom: 12797 ft., Determination Method: CBL | | Additional Cement: | String Type: SURF , Top: 25 ft., Depth: 1839 ft., Bottom: 1839 ft., Sacks: 835, Method: DV TOOL | | Additional Cement: | String Type: SURF , Top: 0 ft., Depth: 25 ft., Bottom: 25 ft., Sacks: 5, Method: 1 INCH | | Formation | Interval Top | Log Bottom | Cored | DSTs | | WASATCH G | 5966 ft. | | | | | WILLIAMS FORK | 7938 ft. | | | | | MESAVERDE | 7938 ft. | | | | | CAMEO | 10991 ft. | | | | | ROLLINS | 11588 ft. | | | | | COZZETTE | 11717 ft. | | | | | CORCORAN | 11919 ft. | | | | | SEGO | 12276 ft. | | | |
Formation SEGO Formation Classification: OW Status: PR - 8/1/2022 Interval Top: 12289 ft. Interval Bottom: 12595 ft.| Completed Information for Formation SEGO | | 1st Production Date: | 5/20/2016 | Choke Size: | | | Formation Name: | SEGO | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 5/16/2016 | Treatment End Date: | 5/16/2016 | | Treatment Summary: | 2926 Gals 7.5% HCL; 4927 BBLS Slickwater; 41991 40/80 Sand; 112719 40/70 Sand; (summary)
| | Total fluid used in treatment (bbls): | 4996 | Max pressure during treatment (psi): | 6474 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.43 | | Type Of gas: | | Number Of staged intervals: | 2 | | Total acid used in treatment (bbls): | 70 | Min frac gradient (psi/ft): | 0.65 | | Recycled water used in treatment (bbls): | 4926 | Total flowback volume recovered (bbls): | 2192 | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | RECYCLE | | Total proppant used (lbs): | 154710 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation SEGO. |
| | Perforation Data: | | Interval Top: | 12289 ft. | # Of Holes: | 42 | | Interval Bottom: | 12595 ft. | Hole Size: | 0.35 in. |
|
Formation CRCRN Formation Classification: OW Status: PR - 8/1/2022 Interval Top: 11926 ft. Interval Bottom: 12257 ft.| Completed Information for Formation CORCORAN | | 1st Production Date: | 5/20/2016 | Choke Size: | | | Formation Name: | CORCORAN | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 5/16/2016 | Treatment End Date: | 5/16/2016 | | Treatment Summary: | 1000 Gals 7.5% HCL; 2723 BBLS Slickwater; 23828 40/80 Sand; 63198 40/70 Sand; (summary)
| | Total fluid used in treatment (bbls): | 2747 | Max pressure during treatment (psi): | 6474 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.43 | | Type Of gas: | | Number Of staged intervals: | 1 | | Total acid used in treatment (bbls): | 24 | Min frac gradient (psi/ft): | 0.65 | | Recycled water used in treatment (bbls): | 2723 | Total flowback volume recovered (bbls): | 958 | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | RECYCLE | | Total proppant used (lbs): | 87026 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CRCRN. |
| | Perforation Data: | | Interval Top: | 11926 ft. | # Of Holes: | 27 | | Interval Bottom: | 12257 ft. | Hole Size: | 0.35 in. |
|
Formation COZZ Formation Classification: OW Status: PR - 8/1/2022 Interval Top: 11893 ft. Interval Bottom: 11894 ft.| Completed Information for Formation COZZETTE | | 1st Production Date: | 5/20/2016 | Choke Size: | | | Formation Name: | COZZETTE | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 5/16/2016 | Treatment End Date: | 5/16/2016 | | Treatment Summary: | 389 BBLS Slickwater; 3404 40/80 Sand; 9028 40/70 Sand; (summary)
| | Total fluid used in treatment (bbls): | 389 | Max pressure during treatment (psi): | 6474 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.43 | | Type Of gas: | | Number Of staged intervals: | 1 | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | 0.65 | | Recycled water used in treatment (bbls): | 389 | Total flowback volume recovered (bbls): | 168 | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | RECYCLE | | Total proppant used (lbs): | 12432 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation COZZ. |
| | Perforation Data: | | Interval Top: | 11893 ft. | # Of Holes: | 3 | | Interval Bottom: | 11894 ft. | Hole Size: | 0.35 in. |
|
Formation WFCCCS Formation Classification: GW Status: CM - 6/1/2016 Interval Top: 9952 ft. Interval Bottom: 12595 ft.| Completed Information for Formation WILLIAMS FORK-CAMEO-COZZETTE-CORCORAN-SEGO | | 1st Production Date: | 5/20/2016 | Choke Size: | | | Formation Name: | WILLIAMS FORK-CAMEO-COZZETTE-CORCORAN-SEGO | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 5/16/2016 | Treatment End Date: | 5/19/2016 | | Treatment Summary: | 12620 Gals 7.5% HCL; 37859 BBLS Slickwater; 336648 40/80 Sand; 896671 40/70 Sand; (summary)
| | Total fluid used in treatment (bbls): | 38159 | Max pressure during treatment (psi): | 6474 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.43 | | Type Of gas: | | Number Of staged intervals: | 12 | | Total acid used in treatment (bbls): | 300 | Min frac gradient (psi/ft): | 0.65 | | Recycled water used in treatment (bbls): | 37859 | Total flowback volume recovered (bbls): | 12437 | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | RECYCLE | | Total proppant used (lbs): | 1233319 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 12322 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 6/1/2016 | Test Method: | Flowing | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BTU_GAS | 1117 | | CALC_MCF_GAS | 2919 | | CASING_PRESS | 3315 | | MCF_GAS | 2919 | | TUBING_PRESS | 2240 |
| | Perforation Data: | | Interval Top: | 9952 ft. | # Of Holes: | 264 | | Interval Bottom: | 12595 ft. | Hole Size: | 0.35 in. |
|
Formation WFCCRS Formation Classification: OW Status: CM - 3/16/2017 Interval Top: 9952 ft. Interval Bottom: 12595 ft.| Completed Information for Formation WILLIAMS FORK-CAMEO-CORCORAN-SEGO | | 1st Production Date: | 5/20/2016 | Choke Size: | | | Formation Name: | WILLIAMS FORK-CAMEO-CORCORAN-SEGO | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | | | Treatment Date: | 3/16/2017 | Treatment End Date: | N/A | | Treatment Summary: | 12620 Gals 7.5% HCL; 39848 BBLs Slickwater; 321400 40/80 Sand; 917028 40/70 Sand; (summary)
| | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation WFCCRS. |
| | Perforation Data: | | Interval Top: | 9952 ft. | # Of Holes: | 264 | | Interval Bottom: | 12595 ft. | Hole Size: | 0.35 in. |
|
Formation WFCM Formation Classification: OW Status: PR - 8/1/2022 Interval Top: 9952 ft. Interval Bottom: 11506 ft.| Completed Information for Formation WILLIAMS FORK - CAMEO | | 1st Production Date: | 5/20/2016 | Choke Size: | | | Formation Name: | WILLIAMS FORK - CAMEO | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 5/17/2016 | Treatment End Date: | 5/19/2016 | | Treatment Summary: | 8694 Gals 7.5% HCL; 29820 BBLS Slickwater; 267425 40/80 Sand; 711725 40/70 Sand; (summary)
| | Total fluid used in treatment (bbls): | 30027 | Max pressure during treatment (psi): | 6474 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.43 | | Type Of gas: | | Number Of staged intervals: | 8 | | Total acid used in treatment (bbls): | 207 | Min frac gradient (psi/ft): | 0.65 | | Recycled water used in treatment (bbls): | 29820 | Total flowback volume recovered (bbls): | 9119 | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | RECYCLE | | Total proppant used (lbs): | 979150 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation WFCM. |
| | Perforation Data: | | Interval Top: | 9952 ft. | # Of Holes: | 192 | | Interval Bottom: | 11506 ft. | Hole Size: | 0.35 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 107 |
| Total Gas Produced (MCF) | 15706 |
| GOR | 146785 |
| GOR Determination | MCFE |
| Average BOE per Day | 7.710 |
| Average MCFE per Day | 44.715 |
| Federal Financial Assurance | i | Y |
|
|