|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 9/1/2015 Measured TD: 12629 ft. Vertical TD: 12500 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 9/1/2015 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 6/12/2015 | | Proposed Top PZ Location: | Sec:26 Twp: 1S 98W | Footage: 1654 FSL 1329 FEL | | Bottom Hole Location: | Sec:26 Twp: 1S 98W | Footage: 1654 FSL 1329 FEL | | Proposed Depth/Form: | 12553 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEDERAL | Surface Owner: | FEDERAL | | Unit: | Ryan Gulch Unit | Unit Number: | COC068269 | | Formation And Spacing: | Code: ILES , Formation: ILES , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: SEGO , Formation: SEGO , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: WMFK , Formation: WILLIAMS FORK , Order: , Unit Acreage: , Drill Unit: | | Casing: | String Type: CONDUCTOR, Hole Size: 30 in., Size: 18 in., Top: 0 ft., Depth: 80 ft., Weight: 48 , Citings Type: PLANNED | | Cement: | Sacks: 50, Top: 0 ft., Bottom: 80 ft. | | Casing: | String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 3949 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 1314, Top: 0 ft., Bottom: 3949 ft. | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 12680 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 1335, Top: 7535 ft., Bottom: 12680 ft. |
| | |
| Wellbore Completed | | Completion Date: | 12/4/2014 | | Spud Date: | 12/4/2014 | Spud Date Is: | ACTUAL | | Measured TD: | 12629 ft. | Measured PB depth: | 12589 ft. | | True Vertical TD: | 12500 ft. | True Vertical PB depth: | 12460 ft. | | Bottom Hole Location: | Sec:26 Twp: 1S 98W | Footage: 1654 FSL 1329 FEL | | Log Types: | No logs ran on wellbore. | | Casing: | String Type: CONDUCTOR, Hole Size: 30 in., Size: 18 in., Top: 0 ft., Depth: 84 ft., Weight: 47.4 , Citings Type: ACTUAL | | Cement: | Sacks: 31, Top: 0 ft., Bottom: 84 ft., Determination Method: VISU | | Casing: | String Type: OPEN HOLE, Hole Size: 13.5 in., Size: , Top: 84 ft., Depth: 237 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: , Top: , Bottom: , Determination Method: | | Additional Cement: | String Type: OPEN HOLE , Top: , Depth: 220 ft., Bottom: , Sacks: 168, Method: | | No formation data to display. |
Sidetrack #01 Wellbore Classification: GW Status: PR - 8/1/2022 Measured TD: 12629 ft. Vertical TD: 12500 ft.| Wellbore Data for Sidetrack #01 | Wellbore Classification: GW PR - 8/1/2022 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 1/11/2017 | | Proposed Top PZ Location: | Sec:26 Twp: 1S 98W | Footage: 1681 FSL 1310 FEL | | Bottom Hole Location: | Sec:26 Twp: 1S 98W | Footage: 1682 FSL 1332 FEL | | Proposed Depth/Form: | 12680 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEDERAL | Surface Owner: | FEDERAL | | Unit: | RYAN GULCH UNIT | Unit Number: | 068239X | | Formation And Spacing: | Code: ILES , Formation: ILES , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: SEGO , Formation: SEGO , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: WMFK , Formation: WILLIAMS FORK , Order: , Unit Acreage: , Drill Unit: | | Casing: | String Type: CONDUCTOR, Hole Size: 30 in., Size: 18 in., Top: 0 ft., Depth: 84 ft., Weight: 48 , Citings Type: PLANNED | | Cement: | Sacks: 32, Top: 0 ft., Bottom: 84 ft. | | Casing: | String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 4023 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 1466, Top: 0 ft., Bottom: 4023 ft. | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 12680 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 1309, Top: 7794 ft., Bottom: 12680 ft. |
| | |
| Wellbore Completed | | Completion Date: | 1/14/2015 | | Spud Date: | 12/4/2014 | Spud Date Is: | ACTUAL | | Measured TD: | 12629 ft. | Measured PB depth: | 12589 ft. | | True Vertical TD: | 12500 ft. | True Vertical PB depth: | 12460 ft. | | Top PZ Location: | Sec:26 Twp: 1S 98W | Footage: 1681 FSL 1310 FEL | | Bottom Hole Location: | Sec:26 Twp: 1S 98W | Footage: 1682 FSL 1332 FEL | | Log Types: | CBL/MUD/RPM/Triple Combo in API 103-11988 | | Casing: | String Type: CONDUCTOR, Hole Size: 30 in., Size: 18 in., Top: 0 ft., Depth: 84 ft., Weight: 47.4 , Citings Type: ACTUAL | | Cement: | Sacks: 31, Top: 0 ft., Bottom: 84 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 4010 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 795, Top: 1847 ft., Bottom: 4010 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 12619 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 1925, Top: 6617 ft., Bottom: 12619 ft., Determination Method: CBL | | Additional Cement: | String Type: SURF , Top: 0 ft., Depth: 1847 ft., Bottom: 1847 ft., Sacks: 980, Method: DV TOOL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | WASATCH G | 5699 ft. | | | | | WILLIAMS FORK | 7759 ft. | | | | | MESAVERDE | 7759 ft. | | | | | CAMEO | 10714 ft. | | | | | ROLLINS | 11370 ft. | | | | | COZZETTE | 11491 ft. | | | | | CORCORAN | 11709 ft. | | | | | SEGO | 12085 ft. | | | |
Formation SEGO Formation Classification: OW Status: PR - 8/1/2022 Interval Top: 12099 ft. Interval Bottom: 12503 ft.| Completed Information for Formation SEGO | | 1st Production Date: | 9/21/2015 | Choke Size: | | | Formation Name: | SEGO | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 9/12/2015 | Treatment End Date: | 9/12/2015 | | Treatment Summary: | 1000 Gals 10% HCL; 13275 BBLs Slickwater; 330421 #40/70 Sand; 20074 #20/40 Sand; (summary)
| | Total fluid used in treatment (bbls): | 13299 | Max pressure during treatment (psi): | 6799 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.43 | | Type Of gas: | | Number Of staged intervals: | 2 | | Total acid used in treatment (bbls): | 24 | Min frac gradient (psi/ft): | 0.63 | | Recycled water used in treatment (bbls): | 13275 | Total flowback volume recovered (bbls): | 11621 | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | RECYCLE | | Total proppant used (lbs): | 350495 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation SEGO. |
| | Perforation Data: | | Interval Top: | 12099 ft. | # Of Holes: | 48 | | Interval Bottom: | 12503 ft. | Hole Size: | 0.35 in. |
|
Formation CRCRN Formation Classification: OW Status: PR - 8/1/2022 Interval Top: 11729 ft. Interval Bottom: 12076 ft.| Completed Information for Formation CORCORAN | | 1st Production Date: | 9/21/2015 | Choke Size: | | | Formation Name: | CORCORAN | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 9/13/2015 | Treatment End Date: | 9/13/2015 | | Treatment Summary: | 1000 Gals 10% HCL; 12593 BBLs Slickwater; 308332 #40/70 Sand; 18727 #20/40 Sand; (summary)
| | Total fluid used in treatment (bbls): | 12617 | Max pressure during treatment (psi): | 6799 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.43 | | Type Of gas: | | Number Of staged intervals: | 2 | | Total acid used in treatment (bbls): | 24 | Min frac gradient (psi/ft): | 0.63 | | Recycled water used in treatment (bbls): | 12593 | Total flowback volume recovered (bbls): | 10427 | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | RECYCLE | | Total proppant used (lbs): | 327059 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CRCRN. |
| | Perforation Data: | | Interval Top: | 11729 ft. | # Of Holes: | 48 | | Interval Bottom: | 12076 ft. | Hole Size: | 0.35 in. |
|
Formation COZZ Formation Classification: OW Status: PR - 8/1/2022 Interval Top: 11589 ft. Interval Bottom: 11703 ft.| Completed Information for Formation COZZETTE | | 1st Production Date: | 9/21/2015 | Choke Size: | | | Formation Name: | COZZETTE | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 9/13/2015 | Treatment End Date: | 9/13/2015 | | Treatment Summary: | 500 Gals 10% HCL; 6552 BBLs Slickwater; 161181 #40/70 Sand; 9792 #20/40 Sand; (Summary)
| | Total fluid used in treatment (bbls): | 6564 | Max pressure during treatment (psi): | 6799 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.43 | | Type Of gas: | | Number Of staged intervals: | 1 | | Total acid used in treatment (bbls): | 12 | Min frac gradient (psi/ft): | 0.63 | | Recycled water used in treatment (bbls): | 6552 | Total flowback volume recovered (bbls): | 3487 | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | RECYCLE | | Total proppant used (lbs): | 170973 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation COZZ. |
| | Perforation Data: | | Interval Top: | 11589 ft. | # Of Holes: | 24 | | Interval Bottom: | 11703 ft. | Hole Size: | 0.35 in. |
|
Formation WFCCCS Formation Classification: GW Status: CM - 10/29/2015 Interval Top: 9083 ft. Interval Bottom: 12503 ft.| Completed Information for Formation WILLIAMS FORK-CAMEO-COZZETTE-CORCORAN-SEGO | | 1st Production Date: | 9/21/2015 | Choke Size: | | | Formation Name: | WILLIAMS FORK-CAMEO-COZZETTE-CORCORAN-SEGO | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 9/12/2015 | Treatment End Date: | 9/18/2015 | | Treatment Summary: | 4000 Gals 10% HCL; 105962 BBLs Slickwater; 1998854 #40/70 Sand; 122154 #20/40 Sand: (summary)
| | Total fluid used in treatment (bbls): | 106057 | Max pressure during treatment (psi): | 6799 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.43 | | Type Of gas: | | Number Of staged intervals: | 15 | | Total acid used in treatment (bbls): | 95 | Min frac gradient (psi/ft): | 0.63 | | Recycled water used in treatment (bbls): | 105962 | Total flowback volume recovered (bbls): | 67761 | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | RECYCLE | | Total proppant used (lbs): | 2121008 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 11973 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 10/29/2015 | Test Method: | Flowing | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BTU_GAS | 1063 | | CALC_MCF_GAS | 1738 | | CASING_PRESS | 3547 | | MCF_GAS | 1738 | | TUBING_PRESS | 2986 |
| | Perforation Data: | | Interval Top: | 9083 ft. | # Of Holes: | 408 | | Interval Bottom: | 12503 ft. | Hole Size: | 0.35 in. |
|
Formation WFCM Formation Classification: OW Status: PR - 8/1/2022 Interval Top: 9083 ft. Interval Bottom: 11312 ft.| Completed Information for Formation WILLIAMS FORK - CAMEO | | 1st Production Date: | 9/21/2015 | Choke Size: | | | Formation Name: | WILLIAMS FORK - CAMEO | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 9/14/2015 | Treatment End Date: | 9/18/2015 | | Treatment Summary: | 1500 Gals 10% HCL; 73542 BBLs Slickwater; 1198920 #40/70 Sand; 73561 #20/40 Sand; (summary)
| | Total fluid used in treatment (bbls): | 73578 | Max pressure during treatment (psi): | 6799 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.43 | | Type Of gas: | | Number Of staged intervals: | 10 | | Total acid used in treatment (bbls): | 36 | Min frac gradient (psi/ft): | 0.63 | | Recycled water used in treatment (bbls): | 73542 | Total flowback volume recovered (bbls): | 42226 | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | RECYCLE | | Total proppant used (lbs): | 1272481 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation WFCM. |
| | Perforation Data: | | Interval Top: | 9083 ft. | # Of Holes: | 288 | | Interval Bottom: | 11312 ft. | Hole Size: | 0.35 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 222 |
| Total Gas Produced (MCF) | 32777 |
| GOR | 147644 |
| GOR Determination | MCFE |
| Average BOE per Day | 16.088 |
| Average MCFE per Day | 93.329 |
| Federal Financial Assurance | i | Y |
|
|