Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-103-11963
Well Classification: GW Status: PR - 1/1/2024
Well Name/No:Federal #RGU 433-26-198
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC60732
Facility Status:PRStatus Date1/1/2024
FacilityID:433264LocationID:433271
County:RIO BLANCO #103Location:LOT 8 26 1S98W 6
Field:SULPHUR CREEK - #80090Elevation:6623 ft.
Basin:PICEANCE BASIN  
Planned Location:2473FNL  914 FELLat/Long: 39.935066 / -108.354607Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.935066 / -108.354607Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 9/12/2015
End Date: 9/18/2015
Reported: 11/16/2015
Days to report: 59
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 1/1/2024             Measured TD: 12748 ft.    Vertical TD: 12463 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 1/1/2024
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:6/12/2015
Proposed Top PZ Location:Sec:26 Twp: 1S 98W Footage: 885 FSL  948 FEL
Bottom Hole Location:Sec:26 Twp: 1S 98W Footage: 885 FSL  948 FEL
Proposed Depth/Form:12659 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit:Ryan Gulch Unit Unit Number:COC068269
Formation And Spacing:Code: ILES , Formation: ILES , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: SEGO , Formation: SEGO , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: , Unit Acreage: , Drill Unit:
Casing:String Type: CONDUCTOR, Hole Size: 30 in., Size: 18 in., Top: 0 ft., Depth: 80 ft., Weight: 48 , Citings Type: PLANNED
Cement:Sacks: 50, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 4041 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 1348, Top: 0 ft., Bottom: 4041 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 12971 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 1366, Top: 7680 ft., Bottom: 12971 ft.

Wellbore Completed
Completion Date:1/24/2015
Spud Date:11/30/2014Spud Date Is:ACTUAL
Measured TD:12748 ft.Measured PB depth:12709 ft.
True Vertical TD:12463 ft.True Vertical PB depth:12424 ft.
Top PZ Location:Sec:26 Twp: 1S 98WFootage: 906 FSL  927 FEL
Bottom Hole Location:Sec:26 Twp: 1S 98WFootage: 885 FSL  948 FEL
Log Types:CBL/MUD/RPM/Triple Combo in API 103-11988
Casing:String Type: CONDUCTOR, Hole Size: 30 in., Size: 18 in., Top: 0 ft., Depth: 63 ft., Weight: 47.4 , Citings Type: ACTUAL
Cement:Sacks: 24, Top: 0 ft., Bottom: 63 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 4117 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 830, Top: 1848 ft., Bottom: 4117 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 12738 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 1970, Top: 5581 ft., Bottom: 12738 ft., Determination Method: CBL
Additional Cement:String Type: SURF , Top: 0 ft., Depth: 1848 ft., Bottom: 1848 ft., Sacks: 1095, Method: DV TOOL
FormationInterval TopLog BottomCoredDSTs
WASATCH G5924 ft.
WILLIAMS FORK7880 ft.
MESAVERDE7880 ft.
CAMEO10976 ft.
ROLLINS11512 ft.
COZZETTE11640 ft.
CORCORAN11850 ft.
SEGO12268 ft.

Formation SEGO                     Formation Classification:  OW                     Status:  PR - 1/1/2024                  Interval Top: 12271 ft.    Interval Bottom: 12566 ft.

 Completed Information for Formation SEGO
1st Production Date:9/21/2015Choke Size: 
Formation Name:SEGOCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:9/12/2015Treatment End Date:9/12/2015
Treatment Summary:2000 Gals 10% HCL; 23975 BBLs Slickwater; 286249 #40/70 Sand; 16763 #20/40 Sand; (summary)
Total fluid used in treatment (bbls):24023Max pressure during treatment (psi):7080
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:2
Total acid used in treatment (bbls):48Min frac gradient (psi/ft):0.64
Recycled water used in treatment (bbls):23975Total flowback volume recovered (bbls):8431
Fresh water used in treatment (bbls):Disposition method For flowback:RECYCLE
Total proppant used (lbs):303012Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation SEGO.
Perforation Data:
Interval Top:12271 ft.# Of Holes:48
Interval Bottom:12566 ft.Hole Size:0.35 in.

Formation CRCRN                   Formation Classification:  OW                   Status:  PR - 1/1/2024                  Interval Top: 11853 ft.    Interval Bottom: 12221 ft.

 Completed Information for Formation CORCORAN
1st Production Date:9/21/2015Choke Size: 
Formation Name:CORCORANCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:9/12/2015Treatment End Date:9/12/2015
Treatment Summary:2000 Gals 10% HCL; 24315 BBLs Slickwater; 294814 #40/70 Sand; 17992 #20/40 Sand; (summary)
Total fluid used in treatment (bbls):24362Max pressure during treatment (psi):7080
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:2
Total acid used in treatment (bbls):48Min frac gradient (psi/ft):0.64
Recycled water used in treatment (bbls):24315Total flowback volume recovered (bbls):8550
Fresh water used in treatment (bbls):Disposition method For flowback:RECYCLE
Total proppant used (lbs):312806Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CRCRN.
Perforation Data:
Interval Top:11853 ft.# Of Holes:48
Interval Bottom:12221 ft.Hole Size:0.35 in.

Formation COZZ                     Formation Classification:  OW                     Status:  PR - 1/1/2024                  Interval Top: 11733 ft.    Interval Bottom: 11841 ft.

 Completed Information for Formation COZZETTE
1st Production Date:9/21/2015Choke Size: 
Formation Name:COZZETTECommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:9/13/2015Treatment End Date:9/13/2015
Treatment Summary:1000 Gals 10% HCL; 12624 BBLs Slickwater; 154519 #40/70 Sand; 9425 #20/40 Sand; (summary)
Total fluid used in treatment (bbls):12648Max pressure during treatment (psi):7080
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):24Min frac gradient (psi/ft):0.64
Recycled water used in treatment (bbls):12624Total flowback volume recovered (bbls):4439
Fresh water used in treatment (bbls):Disposition method For flowback:RECYCLE
Total proppant used (lbs):163944Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation COZZ.
Perforation Data:
Interval Top:11733 ft.# Of Holes:24
Interval Bottom:11841 ft.Hole Size:0.35 in.

Formation WFCCCS                 Formation Classification:  GW                 Status:  CM - 11/30/2015                Interval Top: 9140 ft.    Interval Bottom: 12566 ft.

 Completed Information for Formation WILLIAMS FORK-CAMEO-COZZETTE-CORCORAN-SEGO
1st Production Date:9/20/2015Choke Size: 
Formation Name:WILLIAMS FORK-CAMEO-COZZETTE-CORCORAN-SEGOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:9/2/2015Treatment End Date:9/18/2015
Treatment Summary:8000 Gals 10% HCL; 215064 BBLs Slickwater; 2017931 #40/70 Sand; 122548 #20/40 Sand: (summary)
Total fluid used in treatment (bbls):215255Max pressure during treatment (psi):7080
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:18
Total acid used in treatment (bbls):191Min frac gradient (psi/ft):0.64
Recycled water used in treatment (bbls):215064Total flowback volume recovered (bbls):75543
Fresh water used in treatment (bbls):Disposition method For flowback:RECYCLE
Total proppant used (lbs):2140479Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:12037 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:11/30/2015Test Method:Flowing
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1071
CALC_MCF_GAS 1798
CASING_PRESS 3281
MCF_GAS 1798
TUBING_PRESS 2432
Perforation Data:
Interval Top:9140 ft.# Of Holes:432
Interval Bottom:12566 ft.Hole Size:0.35 in.

Formation WFCM                     Formation Classification:  OW                     Status:  PR - 1/1/2024                  Interval Top: 9140 ft.    Interval Bottom: 11457 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:9/17/2015Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:9/14/2015Treatment End Date:9/18/2015
Treatment Summary:3000 Gals 10% HCL; 154150 BBLs Slickwater; 1282349 #40/70 Sand; 78368 #20/40 Sand; (summary)
Total fluid used in treatment (bbls):154221Max pressure during treatment (psi):7080
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:13
Total acid used in treatment (bbls):71Min frac gradient (psi/ft):0.64
Recycled water used in treatment (bbls):154150Total flowback volume recovered (bbls):54123
Fresh water used in treatment (bbls):Disposition method For flowback:RECYCLE
Total proppant used (lbs):1360717Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation WFCM.
Perforation Data:
Interval Top:9140 ft.# Of Holes:312
Interval Bottom:11457 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)371
Total Gas Produced (MCF)53852
GOR145153
GOR DeterminationMCFE
Average BOE per Day26.476
Average MCFE per Day153.539

 Federal Financial Assurance  i Y

 Tribal Well  i No