|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 2/22/2014 Measured TD: 11928 ft. Vertical TD: 11883 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 2/22/2014 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 3/13/2015 | | Proposed Top PZ Location: | Sec:27 Twp: 1S 98W | Footage: 2523 FSL 1931 FWL | | Bottom Hole Location: | Sec:27 Twp: 1S 98W | Footage: 2523 FSL 1931 FWL | | Proposed Depth/Form: | 11928 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEDERAL | Surface Owner: | FEDERAL | | Unit: | Ryan Gulch Unit | Unit Number: | COC068269 | | Formation And Spacing: | Code: ILES , Formation: ILES , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: SEGO , Formation: SEGO , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: WMFK , Formation: WILLIAMS FORK , Order: , Unit Acreage: , Drill Unit: | | Casing: | String Type: CONDUCTOR, Hole Size: 30 in., Size: 18 in., Top: 0 ft., Depth: 80 ft., Weight: 48 , Citings Type: PLANNED | | Cement: | Sacks: 50, Top: 0 ft., Bottom: 80 ft. | | Casing: | String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 3715 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 1348, Top: 0 ft., Bottom: 3715 ft. | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 11928 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 836, Top: 7058 ft., Bottom: 11928 ft. |
| | |
| Wellbore Completed | | Completion Date: | 8/23/2013 | | Spud Date: | 8/9/2013 | Spud Date Is: | ACTUAL | | Measured TD: | 11928 ft. | Measured PB depth: | 11820 ft. | | True Vertical TD: | 11883 ft. | True Vertical PB depth: | 11775 ft. | | Top PZ Location: | Sec:27 Twp: 1S 98W | Footage: 2540 FSL 1956 FWL | | Bottom Hole Location: | Sec:27 Twp: 1S 98W | Footage: 2519 FSL 1902 FWL | | Log Types: | RPM/CBL/MUDLOGS
**NOTE: WELL LOGS ARE ATTACHED. | | Casing: | String Type: CONDUCTOR, Hole Size: 30 in., Size: 18 in., Top: 0 ft., Depth: 84 ft., Weight: 48 , Citings Type: ACTUAL | | Cement: | Sacks: 31, Top: 0 ft., Bottom: 84 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 3734 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 1835, Top: 0 ft., Bottom: 3734 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 11918 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 1465, Top: 5250 ft., Bottom: 11918 ft., Determination Method: CBL | | Additional Cement: | String Type: SURF , Top: , Depth: 1656 ft., Bottom: , Sacks: 970, Method: DV TOOL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | WASATCH G | 5281 ft. | | | | | MESAVERDE | 7256 ft. | | | | | CAMEO | 10089 ft. | | | | | CORCORAN | 11066 ft. | | | | | SEGO | 11688 ft. | | | |
Formation SEGO Formation Classification: OW Status: PR - 10/6/2014 Interval Top: 11460 ft. Interval Bottom: 11773 ft.| Completed Information for Formation SEGO | | 1st Production Date: | 10/14/2013 | Choke Size: | | | Formation Name: | SEGO | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 10/9/2013 | Treatment End Date: | 10/9/2013 | | Treatment Summary: | 785 Gals 10% HCL; 185137# 40/70 Sand: 13737# 20/40 Sand; 6872 Bbls Slickwater (Summary) | | Total fluid used in treatment (bbls): | 6891 | Max pressure during treatment (psi): | 5265 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.43 | | Type Of gas: | | Number Of staged intervals: | 2 | | Total acid used in treatment (bbls): | 18 | Min frac gradient (psi/ft): | 0.64 | | Recycled water used in treatment (bbls): | 6872 | Total flowback volume recovered (bbls): | 17624 | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | RECYCLE | | Total proppant used (lbs): | 198874 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation SEGO. |
| | Perforation Data: | | Interval Top: | 11460 ft. | # Of Holes: | 40 | | Interval Bottom: | 11773 ft. | Hole Size: | 0.35 in. |
|
Formation CRCRN Formation Classification: OW Status: PR - 10/6/2014 Interval Top: 11142 ft. Interval Bottom: 11428 ft.| Completed Information for Formation CORCORAN | | 1st Production Date: | 10/14/2013 | Choke Size: | | | Formation Name: | CORCORAN | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 10/9/2013 | Treatment End Date: | 10/9/2013 | | Treatment Summary: | 715 Gals 10% HCL; 208844# 40/70 Sand: 15013# 20/40 Sand; 7882 Bbls Slickwater (Summary) | | Total fluid used in treatment (bbls): | 7899 | Max pressure during treatment (psi): | 5265 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.43 | | Type Of gas: | | Number Of staged intervals: | 2 | | Total acid used in treatment (bbls): | 17 | Min frac gradient (psi/ft): | 0.64 | | Recycled water used in treatment (bbls): | 7882 | Total flowback volume recovered (bbls): | 17624 | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | RECYCLE | | Total proppant used (lbs): | 223857 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CRCRN. |
| | Perforation Data: | | Interval Top: | 11142 ft. | # Of Holes: | 35 | | Interval Bottom: | 11428 ft. | Hole Size: | 0.35 in. |
|
Formation WFCM Formation Classification: OW Status: PR - 10/6/2014 Interval Top: 9265 ft. Interval Bottom: 10581 ft.| Completed Information for Formation WILLIAMS FORK - CAMEO | | 1st Production Date: | 10/14/2013 | Choke Size: | | | Formation Name: | WILLIAMS FORK - CAMEO | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 10/10/2013 | Treatment End Date: | 10/11/2013 | | Treatment Summary: | 3000 Gals 10% HCL; 560516# 40/70 Sand: 38750# 20/40 Sand; 20368 Bbls Slickwater (Summary) | | Total fluid used in treatment (bbls): | 20439 | Max pressure during treatment (psi): | 5265 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.43 | | Type Of gas: | | Number Of staged intervals: | 6 | | Total acid used in treatment (bbls): | 71 | Min frac gradient (psi/ft): | 0.64 | | Recycled water used in treatment (bbls): | 20368 | Total flowback volume recovered (bbls): | 17624 | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | RECYCLE | | Total proppant used (lbs): | 599266 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation WFCM. |
| | Perforation Data: | | Interval Top: | 9265 ft. | # Of Holes: | 140 | | Interval Bottom: | 10581 ft. | Hole Size: | 0.35 in. |
|
Formation WFILS Formation Classification: OW Status: CM - 2/22/2014 Interval Top: 9265 ft. Interval Bottom: 11773 ft.| Completed Information for Formation WILLIAMS FORK-ILES | | 1st Production Date: | 10/14/2013 | Choke Size: | | | Formation Name: | WILLIAMS FORK-ILES | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 10/9/2013 | Treatment End Date: | 10/11/2013 | | Treatment Summary: | 4500 Gals 10% HCL; 954497# 40/70 Sand: 67500# 20/40 Sand; 35123 Bbls Slickwater (Summary) | | Total fluid used in treatment (bbls): | 35230 | Max pressure during treatment (psi): | 5265 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.43 | | Type Of gas: | | Number Of staged intervals: | 9 | | Total acid used in treatment (bbls): | 107 | Min frac gradient (psi/ft): | 0.64 | | Recycled water used in treatment (bbls): | 35123 | Total flowback volume recovered (bbls): | 17624 | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | RECYCLE | | Total proppant used (lbs): | 1021997 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 11154 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 2/22/2014 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BTU_GAS | 1077 | | CALC_MCF_GAS | 988 | | CASING_PRESS | 1321 | | MCF_GAS | 988 | | TUBING_PRESS | 1000 |
| | Perforation Data: | | Interval Top: | 9265 ft. | # Of Holes: | 215 | | Interval Bottom: | 11773 ft. | Hole Size: | 0.35 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 162 |
| Total Gas Produced (MCF) | 23060 |
| GOR | 142345 |
| GOR Determination | MCFE |
| Average BOE per Day | 11.345 |
| Average MCFE per Day | 65.766 |
| Federal Financial Assurance | i | Y |
|
|