Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-103-11956
Well Classification: GW Status: PR - 7/24/2014
Well Name/No:Federal #RGU 422-27-198
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC50731
Facility Status:PRStatus Date7/24/2014
FacilityID:432147LocationID:335926
County:RIO BLANCO #103Location:LOT 6 27 1S98W 6
Field:SULPHUR CREEK - #80090Elevation:6560 ft.
Basin:PICEANCE BASIN  
Planned Location:2107FNL  2139 FWLLat/Long: 39.936128 / -108.379952Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.936128 / -108.379952Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 10/9/2013
End Date: 10/11/2013
Reported: 12/4/2013
Days to report: 54
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 7/24/2014             Measured TD: 11907 ft.    Vertical TD: 11897 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 7/24/2014
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:3/13/2015
Proposed Top PZ Location:Sec:27 Twp: 1S 98W Footage: 2171 FNL  1936 FWL
Bottom Hole Location:Sec:27 Twp: 1S 98W Footage: 2171 FNL  1936 FWL
Proposed Depth/Form:11929 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit:Ryan Gulch Unit Unit Number:COC068269
Formation And Spacing:Code: ILES , Formation: ILES , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: SEGO , Formation: SEGO , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: , Unit Acreage: , Drill Unit:
Casing:String Type: CONDUCTOR, Hole Size: 30 in., Size: 18 in., Top: 0 ft., Depth: 80 ft., Weight: 48 , Citings Type: PLANNED
Cement:Sacks: 50, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 3698 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 1341, Top: 0 ft., Bottom: 3698 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 11929 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 838, Top: 7049 ft., Bottom: 11929 ft.

Wellbore Completed
Completion Date:8/24/2013
Spud Date:8/6/2013Spud Date Is:ACTUAL
Measured TD:11907 ft.Measured PB depth:11863 ft.
True Vertical TD:11897 ft.True Vertical PB depth:11853 ft.
Top PZ Location:Sec:27 Twp: 1S 98WFootage: 2155 FNL  1961 FWL
Bottom Hole Location:Sec:27 Twp: 1S 98WFootage: 2164 FNL  1919 FWL
Log Types:SP/GR/HDIL/ZDL/CN/CBL/MUDLOGS **NOTE: LAS_SENT_TO_COGCC_BY TECH_10/16/2013 PDF FORMAT.
Casing:String Type: CONDUCTOR, Hole Size: 30 in., Size: 18 in., Top: 0 ft., Depth: 84 ft., Weight: 48 , Citings Type: ACTUAL
Cement:Sacks: 31, Top: 0 ft., Bottom: 84 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 3721 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 830, Top: 0 ft., Bottom: 3721 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 11897 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 1675, Top: 4271 ft., Bottom: 11897 ft., Determination Method: CBL
Additional Cement:String Type: SURF , Top: , Depth: 1679 ft., Bottom: , Sacks: 760, Method: DV TOOL
FormationInterval TopLog BottomCoredDSTs
WASATCH G5291 ft.
MESAVERDE7246 ft.
CAMEO10130 ft.
COZZETTE10875 ft.
CORCORAN11081 ft.
SEGO11700 ft.

Formation SEGO                     Formation Classification:  OW                     Status:  PR - 7/24/2014                 Interval Top: 11468 ft.    Interval Bottom: 11787 ft.

 Completed Information for Formation SEGO
1st Production Date:10/13/2013Choke Size: 
Formation Name:SEGOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:10/9/2013Treatment End Date:10/9/2013
Treatment Summary:835 Gals 10% HCL; 208126# 40/70 Sand: 14188# 20/40 Sand; 7668 Bbls Slickwater (Summary)
Total fluid used in treatment (bbls):7688Max pressure during treatment (psi):4359
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:2
Total acid used in treatment (bbls):19Min frac gradient (psi/ft):0.66
Recycled water used in treatment (bbls):7668Total flowback volume recovered (bbls):17631
Fresh water used in treatment (bbls):Disposition method For flowback:RECYCLE
Total proppant used (lbs):222314Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation SEGO.
Perforation Data:
Interval Top:11468 ft.# Of Holes:42
Interval Bottom:11787 ft.Hole Size:0.35 in.

Formation CRCRN                   Formation Classification:  OW                   Status:  PR - 7/24/2014                 Interval Top: 11095 ft.    Interval Bottom: 11445 ft.

 Completed Information for Formation CORCORAN
1st Production Date:10/13/2013Choke Size: 
Formation Name:CORCORANCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:10/9/2013Treatment End Date:10/9/2013
Treatment Summary:605 Gals 10% HCL; 168836# 40/70 Sand: 11962# 20/40 Sand; 6274 Bbls Slickwater (Summary)
Total fluid used in treatment (bbls):6288Max pressure during treatment (psi):4359
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:2
Total acid used in treatment (bbls):14Min frac gradient (psi/ft):0.66
Recycled water used in treatment (bbls):6274Total flowback volume recovered (bbls):17631
Fresh water used in treatment (bbls):Disposition method For flowback:RECYCLE
Total proppant used (lbs):180798Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CRCRN.
Perforation Data:
Interval Top:11095 ft.# Of Holes:30
Interval Bottom:11445 ft.Hole Size:0.35 in.

Formation COZZ                     Formation Classification:  OW                     Status:  PR - 7/24/2014                 Interval Top: 11069 ft.    Interval Bottom: 11070 ft.

 Completed Information for Formation COZZETTE
1st Production Date:10/12/2013Choke Size: 
Formation Name:COZZETTECommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:10/9/2013Treatment End Date:10/9/2013
Treatment Summary:60 Gals 10% HCL; 18661# 40/70 Sand: 1350# 20/40 Sand; 28541 Bbls Slickwater (Summary)
Total fluid used in treatment (bbls):681Max pressure during treatment (psi):4359
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):1Min frac gradient (psi/ft):0.66
Recycled water used in treatment (bbls):679Total flowback volume recovered (bbls):17631
Fresh water used in treatment (bbls):Disposition method For flowback:RECYCLE
Total proppant used (lbs):20011Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation COZZ.
Perforation Data:
Interval Top:11069 ft.# Of Holes:3
Interval Bottom:11070 ft.Hole Size:0.35 in.

Formation WFCM                     Formation Classification:  OW                     Status:  PR - 7/24/2014                 Interval Top: 9288 ft.    Interval Bottom: 10616 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:10/12/2013Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:10/10/2013Treatment End Date:10/11/2013
Treatment Summary:3000 Gals 10% HCL; 574508# 40/70 Sand: 39250# 20/40 Sand; 20836 Bbls Slickwater (Summary)
Total fluid used in treatment (bbls):20908Max pressure during treatment (psi):4359
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:6
Total acid used in treatment (bbls):71Min frac gradient (psi/ft):0.66
Recycled water used in treatment (bbls):20836Total flowback volume recovered (bbls):17631
Fresh water used in treatment (bbls):Disposition method For flowback:RECYCLE
Total proppant used (lbs):613758Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation WFCM.
Perforation Data:
Interval Top:9288 ft.# Of Holes:141
Interval Bottom:10616 ft.Hole Size:0.35 in.

Formation WFILS                   Formation Classification:  OW                   Status:  CM - 2/25/2014                 Interval Top: 9288 ft.    Interval Bottom: 11787 ft.

 Completed Information for Formation WILLIAMS FORK-ILES
1st Production Date:10/12/2013Choke Size: 
Formation Name:WILLIAMS FORK-ILESCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:10/9/2013Treatment End Date:10/11/2013
Treatment Summary:4500 Gals 10% HCL; 970131# 40/70 Sand: 66750# 20/40 Sand; 35458 Bbls Slickwater (Summary)
Total fluid used in treatment (bbls):35565Max pressure during treatment (psi):4359
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:10
Total acid used in treatment (bbls):107Min frac gradient (psi/ft):0.66
Recycled water used in treatment (bbls):35458Total flowback volume recovered (bbls):17631
Fresh water used in treatment (bbls):Disposition method For flowback:RECYCLE
Total proppant used (lbs):1036881Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:11176 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:2/25/2014Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1080
CALC_MCF_GAS 1113
CASING_PRESS 1159
MCF_GAS 1113
TUBING_PRESS 821
Perforation Data:
Interval Top:9288 ft.# Of Holes:216
Interval Bottom:11787 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)155
Total Gas Produced (MCF)22617
GOR145916
GOR DeterminationMCFE
Average BOE per Day11.116
Average MCFE per Day64.464

 Federal Financial Assurance  i Y

 Tribal Well  i No