|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 7/24/2014 Measured TD: 11907 ft. Vertical TD: 11897 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 7/24/2014 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 3/13/2015 | | Proposed Top PZ Location: | Sec:27 Twp: 1S 98W | Footage: 2171 FNL 1936 FWL | | Bottom Hole Location: | Sec:27 Twp: 1S 98W | Footage: 2171 FNL 1936 FWL | | Proposed Depth/Form: | 11929 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEDERAL | Surface Owner: | FEDERAL | | Unit: | Ryan Gulch Unit | Unit Number: | COC068269 | | Formation And Spacing: | Code: ILES , Formation: ILES , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: SEGO , Formation: SEGO , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: WMFK , Formation: WILLIAMS FORK , Order: , Unit Acreage: , Drill Unit: | | Casing: | String Type: CONDUCTOR, Hole Size: 30 in., Size: 18 in., Top: 0 ft., Depth: 80 ft., Weight: 48 , Citings Type: PLANNED | | Cement: | Sacks: 50, Top: 0 ft., Bottom: 80 ft. | | Casing: | String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 3698 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 1341, Top: 0 ft., Bottom: 3698 ft. | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 11929 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 838, Top: 7049 ft., Bottom: 11929 ft. |
| | |
| Wellbore Completed | | Completion Date: | 8/24/2013 | | Spud Date: | 8/6/2013 | Spud Date Is: | ACTUAL | | Measured TD: | 11907 ft. | Measured PB depth: | 11863 ft. | | True Vertical TD: | 11897 ft. | True Vertical PB depth: | 11853 ft. | | Top PZ Location: | Sec:27 Twp: 1S 98W | Footage: 2155 FNL 1961 FWL | | Bottom Hole Location: | Sec:27 Twp: 1S 98W | Footage: 2164 FNL 1919 FWL | | Log Types: | SP/GR/HDIL/ZDL/CN/CBL/MUDLOGS
**NOTE: LAS_SENT_TO_COGCC_BY TECH_10/16/2013 PDF FORMAT. | | Casing: | String Type: CONDUCTOR, Hole Size: 30 in., Size: 18 in., Top: 0 ft., Depth: 84 ft., Weight: 48 , Citings Type: ACTUAL | | Cement: | Sacks: 31, Top: 0 ft., Bottom: 84 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 3721 ft., Weight: 32.3 , Citings Type: ACTUAL | | Cement: | Sacks: 830, Top: 0 ft., Bottom: 3721 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 11897 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 1675, Top: 4271 ft., Bottom: 11897 ft., Determination Method: CBL | | Additional Cement: | String Type: SURF , Top: , Depth: 1679 ft., Bottom: , Sacks: 760, Method: DV TOOL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | WASATCH G | 5291 ft. | | | | | MESAVERDE | 7246 ft. | | | | | CAMEO | 10130 ft. | | | | | COZZETTE | 10875 ft. | | | | | CORCORAN | 11081 ft. | | | | | SEGO | 11700 ft. | | | |
Formation SEGO Formation Classification: OW Status: PR - 7/24/2014 Interval Top: 11468 ft. Interval Bottom: 11787 ft.| Completed Information for Formation SEGO | | 1st Production Date: | 10/13/2013 | Choke Size: | | | Formation Name: | SEGO | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 10/9/2013 | Treatment End Date: | 10/9/2013 | | Treatment Summary: | 835 Gals 10% HCL; 208126# 40/70 Sand: 14188# 20/40 Sand; 7668 Bbls Slickwater (Summary) | | Total fluid used in treatment (bbls): | 7688 | Max pressure during treatment (psi): | 4359 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.43 | | Type Of gas: | | Number Of staged intervals: | 2 | | Total acid used in treatment (bbls): | 19 | Min frac gradient (psi/ft): | 0.66 | | Recycled water used in treatment (bbls): | 7668 | Total flowback volume recovered (bbls): | 17631 | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | RECYCLE | | Total proppant used (lbs): | 222314 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation SEGO. |
| | Perforation Data: | | Interval Top: | 11468 ft. | # Of Holes: | 42 | | Interval Bottom: | 11787 ft. | Hole Size: | 0.35 in. |
|
Formation CRCRN Formation Classification: OW Status: PR - 7/24/2014 Interval Top: 11095 ft. Interval Bottom: 11445 ft.| Completed Information for Formation CORCORAN | | 1st Production Date: | 10/13/2013 | Choke Size: | | | Formation Name: | CORCORAN | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 10/9/2013 | Treatment End Date: | 10/9/2013 | | Treatment Summary: | 605 Gals 10% HCL; 168836# 40/70 Sand: 11962# 20/40 Sand; 6274 Bbls Slickwater (Summary) | | Total fluid used in treatment (bbls): | 6288 | Max pressure during treatment (psi): | 4359 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.43 | | Type Of gas: | | Number Of staged intervals: | 2 | | Total acid used in treatment (bbls): | 14 | Min frac gradient (psi/ft): | 0.66 | | Recycled water used in treatment (bbls): | 6274 | Total flowback volume recovered (bbls): | 17631 | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | RECYCLE | | Total proppant used (lbs): | 180798 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CRCRN. |
| | Perforation Data: | | Interval Top: | 11095 ft. | # Of Holes: | 30 | | Interval Bottom: | 11445 ft. | Hole Size: | 0.35 in. |
|
Formation COZZ Formation Classification: OW Status: PR - 7/24/2014 Interval Top: 11069 ft. Interval Bottom: 11070 ft.| Completed Information for Formation COZZETTE | | 1st Production Date: | 10/12/2013 | Choke Size: | | | Formation Name: | COZZETTE | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 10/9/2013 | Treatment End Date: | 10/9/2013 | | Treatment Summary: | 60 Gals 10% HCL; 18661# 40/70 Sand: 1350# 20/40 Sand; 28541 Bbls Slickwater (Summary) | | Total fluid used in treatment (bbls): | 681 | Max pressure during treatment (psi): | 4359 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.43 | | Type Of gas: | | Number Of staged intervals: | 1 | | Total acid used in treatment (bbls): | 1 | Min frac gradient (psi/ft): | 0.66 | | Recycled water used in treatment (bbls): | 679 | Total flowback volume recovered (bbls): | 17631 | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | RECYCLE | | Total proppant used (lbs): | 20011 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation COZZ. |
| | Perforation Data: | | Interval Top: | 11069 ft. | # Of Holes: | 3 | | Interval Bottom: | 11070 ft. | Hole Size: | 0.35 in. |
|
Formation WFCM Formation Classification: OW Status: PR - 7/24/2014 Interval Top: 9288 ft. Interval Bottom: 10616 ft.| Completed Information for Formation WILLIAMS FORK - CAMEO | | 1st Production Date: | 10/12/2013 | Choke Size: | | | Formation Name: | WILLIAMS FORK - CAMEO | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 10/10/2013 | Treatment End Date: | 10/11/2013 | | Treatment Summary: | 3000 Gals 10% HCL; 574508# 40/70 Sand: 39250# 20/40 Sand; 20836 Bbls Slickwater (Summary) | | Total fluid used in treatment (bbls): | 20908 | Max pressure during treatment (psi): | 4359 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.43 | | Type Of gas: | | Number Of staged intervals: | 6 | | Total acid used in treatment (bbls): | 71 | Min frac gradient (psi/ft): | 0.66 | | Recycled water used in treatment (bbls): | 20836 | Total flowback volume recovered (bbls): | 17631 | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | RECYCLE | | Total proppant used (lbs): | 613758 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation WFCM. |
| | Perforation Data: | | Interval Top: | 9288 ft. | # Of Holes: | 141 | | Interval Bottom: | 10616 ft. | Hole Size: | 0.35 in. |
|
Formation WFILS Formation Classification: OW Status: CM - 2/25/2014 Interval Top: 9288 ft. Interval Bottom: 11787 ft.| Completed Information for Formation WILLIAMS FORK-ILES | | 1st Production Date: | 10/12/2013 | Choke Size: | | | Formation Name: | WILLIAMS FORK-ILES | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 10/9/2013 | Treatment End Date: | 10/11/2013 | | Treatment Summary: | 4500 Gals 10% HCL; 970131# 40/70 Sand: 66750# 20/40 Sand; 35458 Bbls Slickwater (Summary) | | Total fluid used in treatment (bbls): | 35565 | Max pressure during treatment (psi): | 4359 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.43 | | Type Of gas: | | Number Of staged intervals: | 10 | | Total acid used in treatment (bbls): | 107 | Min frac gradient (psi/ft): | 0.66 | | Recycled water used in treatment (bbls): | 35458 | Total flowback volume recovered (bbls): | 17631 | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | RECYCLE | | Total proppant used (lbs): | 1036881 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 11176 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 2/25/2014 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BTU_GAS | 1080 | | CALC_MCF_GAS | 1113 | | CASING_PRESS | 1159 | | MCF_GAS | 1113 | | TUBING_PRESS | 821 |
| | Perforation Data: | | Interval Top: | 9288 ft. | # Of Holes: | 216 | | Interval Bottom: | 11787 ft. | Hole Size: | 0.35 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 155 |
| Total Gas Produced (MCF) | 22617 |
| GOR | 145916 |
| GOR Determination | MCFE |
| Average BOE per Day | 11.116 |
| Average MCFE per Day | 64.464 |
| Federal Financial Assurance | i | Y |
|
|