|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 10/1/2022 Measured TD: 10183 ft. Vertical TD: 10110 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 10/1/2022 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 10/16/2014 | | Proposed Top PZ Location: | Sec:36 Twp: 1N 99W | Footage: 1451 FNL 1950 FEL | | Bottom Hole Location: | Sec:36 Twp: 1N 99W | Footage: 1477 FNL 2009 FEL | | Proposed Depth/Form: | 10173 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEDERAL | Surface Owner: | FEDERAL | | Unit: | Barcus Creek Un | Unit Number: | COC070700X | | Formation And Spacing: | Code: ILES , Formation: ILES , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: SEGO , Formation: SEGO , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: WMFK , Formation: WILLIAMS FORK , Order: , Unit Acreage: , Drill Unit: | | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 80 ft., Weight: 48 , Citings Type: PLANNED | | Cement: | Sacks: 50, Top: 0 ft., Bottom: 80 ft. | | Casing: | String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 3143 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 1260, Top: 0 ft., Bottom: 3143 ft. | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 10173 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 976, Top: , Bottom: 10173 ft. |
| | |
| Wellbore Completed | | Completion Date: | 7/24/2013 | | Spud Date: | 7/3/2013 | Spud Date Is: | ACTUAL | | Measured TD: | 10183 ft. | Measured PB depth: | 10106 ft. | | True Vertical TD: | 10110 ft. | True Vertical PB depth: | 10033 ft. | | Top PZ Location: | Sec:36 Twp: 1N 99W | Footage: 1451 FNL 1950 FEL | | Bottom Hole Location: | Sec:36 Twp: 1N 99W | Footage: 1477 FNL 2009 FEL | | Log Types: | SP/GR/HDIL/ZDL/RPM/CN/CBL/MUDLOGS
**LAS_SENT_TO_COGCC BY GTECH 8/20/2013 | | Casing: | String Type: CONDUCTOR, Hole Size: 30 in., Size: 18 in., Top: 0 ft., Depth: 60 ft., Weight: 48 , Citings Type: ACTUAL | | Cement: | Sacks: 22, Top: 0 ft., Bottom: 60 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 14 in., Size: 9.625 in., Top: 0 ft., Depth: 3165 ft., Weight: 32.3 , Citings Type: ACTUAL | | Cement: | Sacks: 1565, Top: 0 ft., Bottom: 3165 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 10173 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 1550, Top: 5584 ft., Bottom: 10173 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | WASATCH G | 4452 ft. | | | | | MESAVERDE | 6187 ft. | | | | | CAMEO | 8509 ft. | | | | | ROLLINS | 9096 ft. | | | | | COZZETTE | 9173 ft. | | | | | CORCORAN | 9358 ft. | | | | | SEGO | 9928 ft. | | | |
Formation SEGO Formation Classification: OW Status: PR - 10/1/2022 Interval Top: 9765 ft. Interval Bottom: 10059 ft.| Completed Information for Formation SEGO | | 1st Production Date: | 8/19/2013 | Choke Size: | | | Formation Name: | SEGO | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 8/14/2013 | Treatment End Date: | 8/15/2013 | | Treatment Summary: | 750 Gals 10% HCL; 171730# 40/70 Sand: 11250# 20/40 Sand; 6461 Bbls Slickwater (Summary) | | Total fluid used in treatment (bbls): | 6478 | Max pressure during treatment (psi): | 5931 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.43 | | Type Of gas: | | Number Of staged intervals: | 2 | | Total acid used in treatment (bbls): | 17 | Min frac gradient (psi/ft): | 0.56 | | Recycled water used in treatment (bbls): | 6461 | Total flowback volume recovered (bbls): | 24061 | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | RECYCLE | | Total proppant used (lbs): | 182980 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation SEGO. |
| | Perforation Data: | | Interval Top: | 9765 ft. | # Of Holes: | 43 | | Interval Bottom: | 10059 ft. | Hole Size: | 0.35 in. |
|
Formation CRCRN Formation Classification: OW Status: PR - 10/1/2022 Interval Top: 9365 ft. Interval Bottom: 9738 ft.| Completed Information for Formation CORCORAN | | 1st Production Date: | 8/19/2013 | Choke Size: | | | Formation Name: | CORCORAN | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 9/13/2013 | Treatment End Date: | 9/13/2013 | | Treatment Summary: | 750 Gals 10% HCL; 152800# 40/70 Sand: 11250# 20/40 Sand; 5770 Bbls Slickwater (Summary) | | Total fluid used in treatment (bbls): | 5787 | Max pressure during treatment (psi): | 5931 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.43 | | Type Of gas: | | Number Of staged intervals: | 2 | | Total acid used in treatment (bbls): | 17 | Min frac gradient (psi/ft): | 0.56 | | Recycled water used in treatment (bbls): | 5770 | Total flowback volume recovered (bbls): | 24061 | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | RECYCLE | | Total proppant used (lbs): | 164050 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CRCRN. |
| | Perforation Data: | | Interval Top: | 9365 ft. | # Of Holes: | 37 | | Interval Bottom: | 9738 ft. | Hole Size: | 0.35 in. |
|
Formation RLNS Formation Classification: OW Status: PR - 10/1/2022 Interval Top: 9104 ft. Interval Bottom: 9157 ft.| Completed Information for Formation ROLLINS | | 1st Production Date: | 8/19/2013 | Choke Size: | | | Formation Name: | ROLLINS | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 9/13/2013 | Treatment End Date: | 9/13/2013 | | Treatment Summary: | 250 Gals 10% HCL; 55854# 40/70 Sand: 2750# 20/40 Sand; 1962 Bbls Slickwater (Summary) | | Total fluid used in treatment (bbls): | 1968 | Max pressure during treatment (psi): | 5931 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.43 | | Type Of gas: | | Number Of staged intervals: | 1 | | Total acid used in treatment (bbls): | 6 | Min frac gradient (psi/ft): | 0.56 | | Recycled water used in treatment (bbls): | 1962 | Total flowback volume recovered (bbls): | 24061 | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | RECYCLE | | Total proppant used (lbs): | 58604 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation RLNS. |
| | Perforation Data: | | Interval Top: | 9104 ft. | # Of Holes: | 15 | | Interval Bottom: | 9157 ft. | Hole Size: | 0.35 in. |
|
Formation WFCM Formation Classification: OW Status: PR - 10/1/2022 Interval Top: 7249 ft. Interval Bottom: 9088 ft.| Completed Information for Formation WILLIAMS FORK - CAMEO | | 1st Production Date: | 8/19/2013 | Choke Size: | | | Formation Name: | WILLIAMS FORK - CAMEO | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 9/13/2013 | Treatment End Date: | 9/14/2013 | | Treatment Summary: | 3250 Gals 10% HCL; 605163# 40/70 Sand: 46402# 20/40 Sand; 22683 Bbls Slickwater (Summary) | | Total fluid used in treatment (bbls): | 22760 | Max pressure during treatment (psi): | 5931 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.43 | | Type Of gas: | | Number Of staged intervals: | 7 | | Total acid used in treatment (bbls): | 77 | Min frac gradient (psi/ft): | 0.56 | | Recycled water used in treatment (bbls): | 22683 | Total flowback volume recovered (bbls): | 24061 | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | RECYCLE | | Total proppant used (lbs): | 651565 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation WFCM. |
| | Perforation Data: | | Interval Top: | 7249 ft. | # Of Holes: | 151 | | Interval Bottom: | 9088 ft. | Hole Size: | 0.35 in. |
|
Formation WFILS Formation Classification: OW Status: CM - 2/22/2014 Interval Top: 7249 ft. Interval Bottom: 10059 ft.| Completed Information for Formation WILLIAMS FORK-ILES | | 1st Production Date: | 8/19/2013 | Choke Size: | | | Formation Name: | WILLIAMS FORK-ILES | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 8/14/2013 | Treatment End Date: | 9/14/2013 | | Treatment Summary: | 5000 Gals 10% HCL; 985547# 40/70 Sand: 73652# 20/40 Sand; 36877 Bbls Slickwater (Summary) | | Total fluid used in treatment (bbls): | 36996 | Max pressure during treatment (psi): | 5931 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.43 | | Type Of gas: | | Number Of staged intervals: | 12 | | Total acid used in treatment (bbls): | 119 | Min frac gradient (psi/ft): | 0.56 | | Recycled water used in treatment (bbls): | 36877 | Total flowback volume recovered (bbls): | 24061 | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | RECYCLE | | Total proppant used (lbs): | 1057199 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 9540 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 2/22/2014 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BTU_GAS | 1069 | | CALC_MCF_GAS | 996 | | CASING_PRESS | 1105 | | MCF_GAS | 996 | | TUBING_PRESS | 833 |
| | Perforation Data: | | Interval Top: | 7249 ft. | # Of Holes: | 246 | | Interval Bottom: | 10059 ft. | Hole Size: | 0.35 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 148 |
| Total Gas Produced (MCF) | 41132 |
| GOR | 277918 |
| GOR Determination | MCFE |
| Average BOE per Day | 19.864 |
| Average MCFE per Day | 115.212 |
| Federal Financial Assurance | i | Y |
|
|