Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-103-11949
Well Classification: GW Status: PR - 10/1/2025
Well Name/No:Federal #BCU 33-36-199
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC62586
Facility Status:PRStatus Date10/1/2025
FacilityID:430487LocationID:430488
County:RIO BLANCO #103Location:LOT 12 36 1N99W 6
Field:SULPHUR CREEK - #80090Elevation:6869 ft.
Basin:PICEANCE BASIN  
Planned Location:1462FNL  1112 FELLat/Long: 40.015223 / -108.447429Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.015223 / -108.447428Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 8/14/2013
End Date: 8/16/2013
Reported: 9/26/2013
Days to report: 41
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 10/1/2025             Measured TD: 10278 ft.    Vertical TD: 10026 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 10/1/2025
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:10/16/2014
Proposed Top PZ Location:Sec:36 Twp: 1N 99W Footage: 2111 FSL  1956 FEL
Bottom Hole Location:Sec:36 Twp: 1N 99W Footage: 2106 FSL  2006 FEL
Proposed Depth/Form:10301 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit:Barcus Creek Un Unit Number:COC070700X
Formation And Spacing:Code: ILES , Formation: ILES , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: SEGO , Formation: SEGO , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: , Unit Acreage: , Drill Unit:
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 80 ft., Weight: 48 , Citings Type: PLANNED
Cement:Sacks: 50, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 3235 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 1297, Top: 0 ft., Bottom: 3235 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 10301 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 976, Top: , Bottom: 10301 ft.

Wellbore Completed
Completion Date:7/17/2013
Spud Date:7/7/2013Spud Date Is:ACTUAL
Measured TD:10278 ft.Measured PB depth:10228 ft.
True Vertical TD:10026 ft.True Vertical PB depth:9976 ft.
Top PZ Location:Sec:36 Twp: 1N 99WFootage: 2111 FSL  1956 FEL
Bottom Hole Location:Sec:36 Twp: 1N 99WFootage: 2106 FSL  2006 FEL
Log Types:TCL/GR/CCL/CBL/MUD
Casing:String Type: CONDUCTOR, Hole Size: 30 in., Size: 18 in., Top: 0 ft., Depth: 80 ft., Weight: 48 , Citings Type: ACTUAL
Cement:Sacks: 30, Top: 0 ft., Bottom: 80 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 3228 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 1605, Top: 0 ft., Bottom: 3228 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 10268 ft., Weight: 11.3 , Citings Type: ACTUAL
Cement:Sacks: 1571, Top: 5994 ft., Bottom: 10268 ft., Determination Method: CBL
Additional Cement:String Type: SURF , Top: , Depth: 1380 ft., Bottom: , Sacks: , Method: DV TOOL
FormationInterval TopLog BottomCoredDSTs
WASATCH G4596 ft.
MESAVERDE6344 ft.
CAMEO8631 ft.
ROLLINS9230 ft.
COZZETTE9305 ft.
CORCORAN9474 ft.
SEGO9881 ft.

Formation SEGO                     Formation Classification:  OG                     Status:  PR - 10/1/2025                 Interval Top: 9946 ft.    Interval Bottom: 10176 ft.

 Completed Information for Formation SEGO
1st Production Date:8/23/2013Choke Size: 
Formation Name:SEGOCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:8/14/2013Treatment End Date:8/16/2013
Treatment Summary:6036 bbls of slickwater; 177083 40/70 sand; 12500 20/40 sand; 500 gals of acid
Total fluid used in treatment (bbls):6048Max pressure during treatment (psi):5528
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):12Min frac gradient (psi/ft):0.57
Recycled water used in treatment (bbls):6036Total flowback volume recovered (bbls):2052
Fresh water used in treatment (bbls):Disposition method For flowback:RECYCLE
Total proppant used (lbs):189583Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation SEGO.
Perforation Data:
Interval Top:9946 ft.# Of Holes:27
Interval Bottom:10176 ft.Hole Size:0.35 in.

Formation CRCRN                   Formation Classification:  OG                   Status:  PR - 10/1/2025                 Interval Top: 9482 ft.    Interval Bottom: 9842 ft.

 Completed Information for Formation CORCORAN
1st Production Date:8/23/2013Choke Size: 
Formation Name:CORCORANCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:8/15/2013Treatment End Date:8/15/2013
Treatment Summary:1000 Gals 10% HCL; 12500 # 20/40 Sand; 181534 40/70 Sand; 6935 Bbls Slickwater (Summary)
Total fluid used in treatment (bbls):6958Max pressure during treatment (psi):5528
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:2
Total acid used in treatment (bbls):23Min frac gradient (psi/ft):0.57
Recycled water used in treatment (bbls):6935Total flowback volume recovered (bbls):21061
Fresh water used in treatment (bbls):Disposition method For flowback:RECYCLE
Total proppant used (lbs):194034Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:8/14/2013Treatment End Date:8/16/2013
Treatment Summary:4894 bbls of slickwater; 127361 40/70 sand; 8929 20/40 sand; 714 gals of acid
Total fluid used in treatment (bbls):4911Max pressure during treatment (psi):5528
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:2
Total acid used in treatment (bbls):17Min frac gradient (psi/ft):0.57
Recycled water used in treatment (bbls):4894Total flowback volume recovered (bbls):2812
Fresh water used in treatment (bbls):Disposition method For flowback:RECYCLE
Total proppant used (lbs):136290Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CRCRN.
Perforation Data:
Interval Top:9482 ft.# Of Holes:37
Interval Bottom:9842 ft.Hole Size:0.35 in.

Formation COZZ                     Formation Classification:  GW                     Status:  PR - 10/1/2025                 Interval Top: 9350 ft.    Interval Bottom: 9464 ft.

 Completed Information for Formation COZZETTE
1st Production Date:8/23/2013Choke Size: 
Formation Name:COZZETTECommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:8/14/2013Treatment End Date:8/16/2013
Treatment Summary:2044 bbls of slickwater; 54172 40/70 sand; 3572 20/40 sand; 284 gals of acid
Total fluid used in treatment (bbls):2051Max pressure during treatment (psi):5528
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):7Min frac gradient (psi/ft):0.57
Recycled water used in treatment (bbls):2044Total flowback volume recovered (bbls):988
Fresh water used in treatment (bbls):Disposition method For flowback:RECYCLE
Total proppant used (lbs):57744Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation COZZ.
Perforation Data:
Interval Top:9350 ft.# Of Holes:13
Interval Bottom:9464 ft.Hole Size:0.35 in.

Formation RLNS                     Formation Classification:  OG                     Status:  PR - 10/1/2025                 Interval Top: 9236 ft.    Interval Bottom: 9287 ft.

 Completed Information for Formation ROLLINS
1st Production Date:8/23/2013Choke Size: 
Formation Name:ROLLINSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:8/15/2013Treatment End Date:8/15/2013
Treatment Summary:500 Gals 10% HCL; 12373 # 20/40 Sand; 116294 40/70 Sand; 4435 Bbls Slickwater (Summary)
Total fluid used in treatment (bbls):4446Max pressure during treatment (psi):5528
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):11Min frac gradient (psi/ft):0.57
Recycled water used in treatment (bbls):4435Total flowback volume recovered (bbls):21061
Fresh water used in treatment (bbls):Disposition method For flowback:RECYCLE
Total proppant used (lbs):128667Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:8/14/2013Treatment End Date:8/16/2013
Treatment Summary:2534 bbls of slickwater; 69953 40/70 sand; 3572 20/40 sand; 284 gals of acid
Total fluid used in treatment (bbls):2541Max pressure during treatment (psi):5528
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):7Min frac gradient (psi/ft):0.57
Recycled water used in treatment (bbls):2534Total flowback volume recovered (bbls):1140
Fresh water used in treatment (bbls):Disposition method For flowback:RECYCLE
Total proppant used (lbs):73525Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation RLNS.
Perforation Data:
Interval Top:9236 ft.# Of Holes:15
Interval Bottom:9287 ft.Hole Size:0.35 in.

Formation WFCM                     Formation Classification:  OG                     Status:  PR - 10/1/2025                 Interval Top: 7274 ft.    Interval Bottom: 9175 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:8/23/2013Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:8/16/2013Treatment End Date:8/16/2013
Treatment Summary:3500 Gals 10% HCL; 51128 # 20/40 Sand; 703006 40/70 Sand; 26191 Bbls Slickwater (Summary)
Total fluid used in treatment (bbls):26274Max pressure during treatment (psi):5528
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:7
Total acid used in treatment (bbls):83Min frac gradient (psi/ft):0.57
Recycled water used in treatment (bbls):26191Total flowback volume recovered (bbls):21061
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):754134Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:8/14/2013Treatment End Date:8/16/2013
Treatment Summary:28094 bbls of slickwater; 755790 40/70 sand; 53087 20/40 sand; 3713 gals of acid
Total fluid used in treatment (bbls):28182Max pressure during treatment (psi):5528
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:8
Total acid used in treatment (bbls):88Min frac gradient (psi/ft):0.57
Recycled water used in treatment (bbls):28094Total flowback volume recovered (bbls):14060
Fresh water used in treatment (bbls):Disposition method For flowback:RECYCLE
Total proppant used (lbs):808877Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation WFCM.
Perforation Data:
Interval Top:7274 ft.# Of Holes:185
Interval Bottom:9175 ft.Hole Size:0.35 in.

Formation WFILS                   Formation Classification:  OG                   Status:  CM - 5/3/2018                  Interval Top: 7274 ft.    Interval Bottom: 10176 ft.

 Completed Information for Formation WILLIAMS FORK-ILES
1st Production Date:8/23/2013Choke Size: 
Formation Name:WILLIAMS FORK-ILESCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:8/14/2013Treatment End Date:8/16/2013
Treatment Summary:43868 bbls of slickwater; 1184360 40/70 sand; 82378 20/40 sand; 5500 gals of acid
Total fluid used in treatment (bbls):43999Max pressure during treatment (psi):5528
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:11
Total acid used in treatment (bbls):131Min frac gradient (psi/ft):0.57
Recycled water used in treatment (bbls):43868Total flowback volume recovered (bbls):21061
Fresh water used in treatment (bbls):Disposition method For flowback:RECYCLE
Total proppant used (lbs):1266738Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:9607 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/15/2013Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1073
CALC_MCF_GAS 1687
CASING_PRESS 2168
MCF_GAS 1687
TUBING_PRESS 1615
Perforation Data:
Interval Top:7274 ft.# Of Holes:277
Interval Bottom:10176 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)251
Total Gas Produced (MCF)59679
GOR237764
GOR DeterminationMCFE
Average BOE per Day29.365
Average MCFE per Day170.323

 Federal Financial Assurance  i Y

 Tribal Well  i No