Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-103-11780
Well Classification: GW Status: PR - 8/30/2012
Well Name/No:Federal RG #622-14-298
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date8/30/2012
FacilityID:418766LocationID:335969
County:RIO BLANCO #103Location:NESW 14 2S98W 6
Field:SULPHUR CREEK - #80090Elevation:6604 ft.
Planned Location:1477FSL  1757 FWLLat/Long: 39.873678 / -108.363449Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.873678 / -108.363449Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 8/9/2011
End Date: 8/9/2011
Reported: 4/18/2012
Prior to rule 205A.b.(2)(A)
Days to report: 253
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 8/30/2012             Measured TD: 11145 ft.    Vertical TD: 10969 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 8/30/2012
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:8/12/2012
Prop Depth/Form:11193 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number:
Formation And Spacing:Code: ILES , Formation: ILES , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: SEGO , Formation: SEGO , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: , Unit Acreage: , Drill Unit:
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: , Depth: 80 ft., Weight: 48 , Citings Type: PLANNED
Cement:Sacks: 135, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: , Depth: 3067 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: , Top: 0 ft., Bottom: 3067 ft.
Casing:String Type: 3RD, Hole Size: 8.75 in., Size: 4.5 in., Top: , Depth: 11193 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom: 11193 ft.

Wellbore Completed
Completion Date:5/31/2011
Spud Date:3/23/2011Spud Date Is:ACTUAL
Measured TD:11145 ft.Measured PB depth:11106 ft.
True Vertical TD:10969 ft.True Vertical PB depth:10930 ft.
Top PZ Location:Sec:14 Twp: 2S 98WFootage: 2893 FNL  2098 FWLDepth
Bottom Hole Location:Sec:14 Twp: 2S 98WFootage: 2881 FNL  2083 FWLDepth
Log Types:SP/GR/HDIL/SDL/CN/AND CBL, MUD
Log Types:CBL/RPM/MUD
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 80 ft., Weight: 48 , Citings Type: ACTUAL
Cement:Sacks: 135, Top: 0 ft., Bottom: 80 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 3043 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 1440, Top: 0 ft., Bottom: 3043 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 11138 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 1339, Top: 2900 ft., Bottom: 11138 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G4558 ft.
MESAVERDE6485 ft.
CAMEO9401 ft.
ROLLINS9980 ft.
COZZETTE10118 ft.
CORCORAN10332 ft.
SEGO10685 ft.

Formation SEGO                     Formation Classification:  GW                     Status:  PR - 8/30/2012                 Interval Top: 10710 ft.    Interval Bottom: 10984 ft.

 Completed Information for Formation SEGO
1st Production Date:8/10/2011Choke Size: 
Formation Name:SEGOCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:8/8/2011
Treatment Summary:1857.4 GAL 10% HCL; 264684# 40/70 SAND; 24157.4# 100-MESH SAND; 10731.5 BBLS SLICKWATER
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation SEGO.
Perforation Data:
Interval Top:10710 ft.# Of Holes:41
Interval Bottom:10984 ft.Hole Size:0.35 in.

Formation CRCRN                   Formation Classification:  GW                   Status:  PR - 8/30/2012                 Interval Top: 10346 ft.    Interval Bottom: 10656 ft.

 Completed Information for Formation CORCORAN
1st Production Date:8/10/2011Choke Size: 
Formation Name:CORCORANCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:8/9/2011
Treatment Summary:1428.7 GAL 10% HCL; 204170.3# 40/70 SAND; 19857.1# 100-MESH SAND 8059.8 BBLS SLICKWATER
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CRCRN.
Perforation Data:
Interval Top:10346 ft.# Of Holes:32
Interval Bottom:10656 ft.Hole Size:0.35 in.

Formation COZZ                     Formation Classification:  GW                     Status:  PR - 8/30/2012                 Interval Top: 10212 ft.    Interval Bottom: 10327 ft.

 Completed Information for Formation COZZETTE
1st Production Date:8/10/2011Choke Size: 
Formation Name:COZZETTECommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:8/11/2011
Treatment Summary:714.5 GAL 10% HCL; 94643# 40/70 SAND; 9285.5# 100-MESH SAND; 3889 BBLS SLICKWATER
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation COZZ.
Perforation Data:
Interval Top:10212 ft.# Of Holes:13
Interval Bottom:10327 ft.Hole Size:0.35 in.

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 9/1/2012                  Interval Top: 7076 ft.    Interval Bottom: 9909 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:8/10/2011Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:8/11/2011
Treatment Summary:10000 GAL 10% HCL; 1424946# 40/70 SAND; 165800# 100-MESH SAND; 57084.4 BBLS SLICKWATER
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation WFCM.
Perforation Data:
Interval Top:7076 ft.# Of Holes:206
Interval Bottom:9909 ft.Hole Size:0.35 in.

Formation WFILS                   Formation Classification:  GW                   Status:  CM - 12/12/2011                Interval Top: 7076 ft.    Interval Bottom: 10984 ft.

 Completed Information for Formation WILLIAMS FORK-ILES
1st Production Date:8/10/2011Choke Size: 
Formation Name:WILLIAMS FORK-ILESCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:8/8/2011
Treatment Summary:14000.6 GAL 10% HCL; 1988443.3# 40/70 SAND; 219100# 100-MESH SAND; 79764.7 BBLS SLICKWATER
Tubing Size:2.375 in.Tubing Setting Depth:10713 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:12/12/2011Test Method:FLowing
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1096
CALC_MCF_GAS 1529
CASING_PRESS 2279
MCF_GAS 1529
TUBING_PRESS 1695
Perforation Data:
Interval Top:7076 ft.# Of Holes:292
Interval Bottom:10984 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2023 - September 2024i
Total Oil Produced (Barrels)295
Total Gas Produced (MCF)43379
GOR147047
GOR DeterminationMCFE
Average BOE per Day21.239
Average MCFE per Day123.188

 Federal Financial Assurance  i Y

 Tribal Well  i No