Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-103-11484
Well Classification: CBM Status: PR - 1/1/2025
Well Name/No:FEDERAL RGU #33-6-297R
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC062046
Facility Status:PRStatus Date1/1/2025
FacilityID:301864LocationID:335602
County:RIO BLANCO #103Location:NESW 6 2s97w 6
Field:SULPHUR CREEK - #80090Elevation:6220 ft.
Basin:PICEANCE BASIN  
Planned Location:2408FSL  2195 FWLLat/Long: 39.904720 / -108.325474Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.904720 / -108.325479Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 5/16/2011
End Date: 5/16/2011
Reported: 4/18/2012
Prior to rule 205A.b.(2)(A)
Days to report: 338
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 1/1/2025             Measured TD: 12153 ft.    Vertical TD: 12053 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 1/1/2025
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:4/28/2012
Proposed Top PZ Location:Sec:6 Twp: 2s 97w Footage: 2436 FSL  1899 FEL
Bottom Hole Location:Sec:6 Twp: 2s 97w Footage: 2436 FSL  1899 FEL
Proposed Depth/Form:12167 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit:Ryan Gulch Unit Unit Number:COC068239X
Formation And Spacing:Code: ILES , Formation: ILES , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: SEGO , Formation: SEGO , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: , Unit Acreage: , Drill Unit:
Casing:String Type: CONDUCTOR, Hole Size: 30 in., Size: 18 in., Top: , Depth: 80 ft., Weight: 48# , Citings Type: PLANNED
Cement:Sacks: 220, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: , Depth: 3352 ft., Weight: 36# , Citings Type: PLANNED
Cement:Sacks: , Top: 0 ft., Bottom: 3352 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: , Depth: 12167 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom: 12167 ft.
Casing:String Type: 3RD, Hole Size: 8.75 in., Size: 4.5 in., Top: , Depth: 12167 ft., Weight: 11.6# , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom: 12167 ft.

Wellbore Completed
Completion Date:12/15/2010
Spud Date:11/3/2010Spud Date Is:ACTUAL
Measured TD:12153 ft.Measured PB depth:12099 ft.
True Vertical TD:12053 ft.True Vertical PB depth:11999 ft.
Top PZ Location:Sec:6 Twp: 2S 97WFootage: 2583 FSL  1880 FEL
Bottom Hole Location:Sec:6 Twp: 2S 97WFootage: 2560 FSL  1884 FEL
Log Types:CBL AND RPM
Log Types:CBL, MUD, and RPM
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 80 ft., Weight: 48 , Citings Type: ACTUAL
Cement:Sacks: 135, Top: 0 ft., Bottom: 80 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 3110 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 2292, Top: 0 ft., Bottom: 3110 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 12143 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 1441, Top: 1750 ft., Bottom: 12143 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
MESAVERDE7197 ft.
CAMEO10343 ft.
ROLLINS10919 ft.
COZZETTE11075 ft.
CORCORAN11295 ft.
SEGO11660 ft.

Formation SEGO                     Formation Classification:  GW                     Status:  PR - 2/1/2025                  Interval Top: 11722 ft.    Interval Bottom: 11793 ft.

 Completed Information for Formation SEGO
1st Production Date:5/22/2011Choke Size: 
Formation Name:SEGOCommingled:Yes
Production Method:
Open Hole Completion:No
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation SEGO.
Perforation Data:
Interval Top:11722 ft.# Of Holes:36
Interval Bottom:11793 ft.Hole Size:0.35 in.

Formation CRCRN                   Formation Classification:  GW                   Status:  PR - 2/1/2025                  Interval Top: 11334 ft.    Interval Bottom: 11623 ft.

 Completed Information for Formation CORCORAN
1st Production Date:5/22/2011Choke Size: 
Formation Name:CORCORANCommingled:Yes
Production Method:
Open Hole Completion:No
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CRCRN.
Perforation Data:
Interval Top:11334 ft.# Of Holes:24
Interval Bottom:11623 ft.Hole Size:0.35 in.

Formation COZZ                     Formation Classification:  GW                     Status:  PR - 2/1/2025                  Interval Top: 11168 ft.    Interval Bottom: 11271 ft.

 Completed Information for Formation COZZETTE
1st Production Date:5/22/2011Choke Size: 
Formation Name:COZZETTECommingled:Yes
Production Method:
Open Hole Completion:No
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation COZZ.
Perforation Data:
Interval Top:11168 ft.# Of Holes:11
Interval Bottom:11271 ft.Hole Size:0.35 in.

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 1/1/2025                  Interval Top: 7840 ft.    Interval Bottom: 10835 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:5/22/2011Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:Yes
Production Method:
Open Hole Completion:No
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation WFCM.
Perforation Data:
Interval Top:7840 ft.# Of Holes:196
Interval Bottom:10835 ft.Hole Size:0.35 in.

Formation WFILS                   Formation Classification:  GW                   Status:  CM - 7/13/2011                 Interval Top: 7840 ft.    Interval Bottom: 11793 ft.

 Completed Information for Formation WILLIAMS FORK-ILES
1st Production Date:5/22/2011Choke Size: 
Formation Name:WILLIAMS FORK-ILESCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:5/14/2011
Treatment Summary:15,001 gals HCL; 2,177,377# 30/50 Sand; 80,051 Bbls. Slickwater (summary)
Tubing Size:2.375 in.Tubing Setting Depth:11736 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/13/2011Test Method:Flowing
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1070
CALC_MCF_GAS 1401
CASING_PRESS 2865
MCF_GAS 1401
TUBING_PRESS 2284
Perforation Data:
Interval Top:7840 ft.# Of Holes:267
Interval Bottom:11793 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
November 2024 - October 2025i
Total Oil Produced (Barrels)118
Total Gas Produced (MCF)13843
GOR117313
GOR DeterminationMCFE
Average BOE per Day6.990
Average MCFE per Day40.524

 Federal Financial Assurance  i Y

 Tribal Well  i No