|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 11/28/2011 Measured TD: 12147 ft. Vertical TD: 12070 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 11/28/2011 | | Wellbore Permit | DIRECTIONAL | | Permit #: | 20084539 | Expiration Date: | 9/10/2009 | | Proposed Top PZ Location: | Sec: Twp: | Footage: 1630 FNL 2009 FEL | | Bottom Hole Location: | Sec:27 Twp: 1S 98W | Footage: 1630 FNL 2009 FEL | | Proposed Depth/Form: | 12065 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEDERAL | Surface Owner: | FEDERAL | | Unit: | RYAN GULCH UNIT | Unit Number: | COC68239 | | Formation And Spacing: | Code: ILES , Formation: ILES , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: SEGO , Formation: SEGO , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: WMFK , Formation: WILLIAMS FORK , Order: , Unit Acreage: , Drill Unit: | | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: , Depth: 80 ft., Weight: 48 , Citings Type: PLANNED | | Cement: | Sacks: , Top: 0 ft., Bottom: 80 ft. | | Casing: | String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: , Depth: 3800 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: , Top: 0 ft., Bottom: 3800 ft. | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: , Depth: 12065 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 874, Top: 200 ft., Bottom: 12065 ft. |
| | |
| Wellbore Completed | | Completion Date: | 3/23/2009 | | Spud Date: | 2/6/2009 | Spud Date Is: | ACTUAL | | Measured TD: | 12147 ft. | Measured PB depth: | 12098 ft. | | True Vertical TD: | 12070 ft. | True Vertical PB depth: | 12021 ft. | | Top PZ Location: | Sec:27 Twp: 1S 98W | Footage: 1630 FNL 2021 FEL | | Bottom Hole Location: | Sec:27 Twp: 1S 98W | Footage: 1612 FNL 2021 FEL | | Log Types: | CBL, HRI, SPECTRAL DENISTY, DUAL SPACED NEUTRON | | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 48 ft., Depth: 80 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 135, Top: 0 ft., Bottom: 80 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 3838 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 880, Top: 0 ft., Bottom: 3838 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 12130 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 1387, Top: 4190 ft., Bottom: 12130 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | MESAVERDE | 7412 ft. | | | | | CAMEO | 10534 ft. | | | | | ROLLINS | 10918 ft. | | | | | COZZETTE | 11049 ft. | | | | | CORCORAN | 11269 ft. | | | | | SEGO | 11657 ft. | | | |
Formation SEGO Formation Classification: GW Status: PR - 11/28/2011 Interval Top: 11626 ft. Interval Bottom: 12025 ft.| Completed Information for Formation SEGO | | 1st Production Date: | 6/29/2009 | Choke Size: | | | Formation Name: | SEGO | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 6/29/2009 | | Treatment Summary: | 2250 GAL 10% HCL ACID, 245200# 100 MESH AND 30/50 SAND, 10188 BBLS SLICKWATER |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation SEGO. |
| | Perforation Data: | | Interval Top: | 11626 ft. | # Of Holes: | 57 | | Interval Bottom: | 12025 ft. | Hole Size: | 0.36 in. |
|
Formation CRCRN Formation Classification: GW Status: PR - 11/28/2011 Interval Top: 11258 ft. Interval Bottom: 11573 ft.| Completed Information for Formation CORCORAN | | 1st Production Date: | 7/7/2009 | Choke Size: | | | Formation Name: | CORCORAN | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 7/7/2009 | | Treatment Summary: | 1750 GAL 10% HCL ACID, 252500# 100 MESH AND 30/50 SAND, 8670 BBLS SLICKWATER |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CRCRN. |
| | Perforation Data: | | Interval Top: | 11258 ft. | # Of Holes: | 38 | | Interval Bottom: | 11573 ft. | Hole Size: | 0.36 in. |
|
Formation COZZ Formation Classification: GW Status: PR - 11/28/2011 Interval Top: 11126 ft. Interval Bottom: 11220 ft.| Completed Information for Formation COZZETTE | | 1st Production Date: | 7/13/2009 | Choke Size: | | | Formation Name: | COZZETTE | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 7/13/2009 | | Treatment Summary: | 59700 GAL 10% HCL ACID, 94390# 100 MESH AND 30/50 SAND, 2247 BBLS SLICKWATER |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation COZZ. |
| | Perforation Data: | | Interval Top: | 11126 ft. | # Of Holes: | 16 | | Interval Bottom: | 11220 ft. | Hole Size: | |
|
Formation WFCM Formation Classification: GW Status: PR - 11/28/2011 Interval Top: 8729 ft. Interval Bottom: 10867 ft.| Completed Information for Formation WILLIAMS FORK - CAMEO | | 1st Production Date: | 7/15/2009 | Choke Size: | | | Formation Name: | WILLIAMS FORK - CAMEO | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 7/15/2009 | | Treatment Summary: | 8250 GAL 10% HCL ACID, 932630# 100 MESH AND 30/50 SAND, 32785 BBLS SLICKWATER |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation WFCM. |
| | Perforation Data: | | Interval Top: | 8729 ft. | # Of Holes: | 198 | | Interval Bottom: | 10867 ft. | Hole Size: | 0.36 in. |
|
Formation WFILS Formation Classification: GW Status: CM - 8/17/2009 Interval Top: 8279 ft. Interval Bottom: 12025 ft.| Completed Information for Formation WILLIAMS FORK-ILES | | 1st Production Date: | 6/29/2009 | Choke Size: | | | Formation Name: | WILLIAMS FORK-ILES | Commingled: | No | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 6/29/2009 | | Treatment Summary: | 13000 GLA 10% HCL ACID, 1490030# 100 MESH AND 30/50 SAND, 53891 BBLS SLICKWATER |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 11895 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 8/17/2009 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 2 | | BTU_GAS | 1080 | | CASING_PRESS | 3250 | | MCF_GAS | 2900 | | TUBING_PRESS | 2375 |
| | Perforation Data: | | Interval Top: | 8279 ft. | # Of Holes: | 309 | | Interval Bottom: | 12025 ft. | Hole Size: | 0.36 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 152 |
| Total Gas Produced (MCF) | 22005 |
| GOR | 144769 |
| GOR Determination | MCFE |
| Average BOE per Day | 10.822 |
| Average MCFE per Day | 62.768 |
| Federal Financial Assurance | i | Y |
|
|