|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: SI - 7/1/2025 Measured TD: 12231 ft. Vertical TD: 11827 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW SI - 7/1/2025 | | Wellbore Permit | DIRECTIONAL | | Permit #: | 20085908 | Expiration Date: | 9/9/2009 | | Proposed Top PZ Location: | Sec: Twp: | Footage: 1616 FSL 2049 FWL | | Bottom Hole Location: | Sec:9 Twp: 2S 97W | Footage: 1616 FSL 2049 FWL | | Proposed Depth/Form: | 14500 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | FREEDOM UNIT | Unit Number: | COC69547X | | Formation And Spacing: | Code: MVRD , Formation: MESAVERDE , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: OHCRK , Formation: OHIO CREEK , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: WSTC , Formation: WASATCH , Order: , Unit Acreage: , Drill Unit: |
| | |
| Wellbore Completed | | Completion Date: | 11/7/2009 | | Spud Date: | 10/14/2008 | Spud Date Is: | ACTUAL | | Measured TD: | 12231 ft. | Measured PB depth: | | | True Vertical TD: | 11827 ft. | True Vertical PB depth: | | | Top PZ Location: | Sec:9 Twp: 2S 97W | Footage: 1903 FSL 1802 FWL | | Bottom Hole Location: | Sec:9 Twp: 2S 97W | Footage: 1903 FSL 1802 FWL | | Log Types: | DIRECTIONAL SURVEY TO TD | | Log Types: | | | Log Types: | GASVIEW,MAIN BOND,RPM ,MUD(4), PERFOR-DRILLING MECH. | | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 64, Top: 0 ft., Bottom: 80 ft., Determination Method: CALC | | Casing: | String Type: SURF, Hole Size: 14.75 in., Size: 10.75 in., Top: 0 ft., Depth: 4811 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 1660, Top: 1096 ft., Bottom: 4811 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 6.125 in., Size: 4.5 in., Top: 0 ft., Depth: 12228 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 2070, Top: 6980 ft., Bottom: 12228 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 1096 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 670, Top: 0 ft., Bottom: 1096 ft., Determination Method: CALC | | Casing: | String Type: 2ND, Hole Size: , Size: 4.5 in., Top: , Depth: , Weight: , Citings Type: ACTUAL | | Cement: | Sacks: , Top: , Bottom: , Determination Method: CALC | | Formation | Interval Top | Log Bottom | Cored | DSTs | | WASATCH G | 5190 ft. | 10500 ft. | N | N | | OHIO CREEK | 10500 ft. | 10730 ft. | N | N | | WILLIAMS FORK - CAMEO | 10730 ft. | 11035 ft. | N | N | | ROLLINS | 11035 ft. | 11230 ft. | N | N | | COZZETTE | 11230 ft. | 12080 ft. | N | N | | CORCORAN | 12080 ft. | 12220 ft. | N | N |
Formation CRCRN Formation Classification: GW Status: SI - 7/1/2025 Interval Top: 11522 ft. Interval Bottom: 11951 ft.| Completed Information for Formation CORCORAN | | 1st Production Date: | 6/28/2009 | Choke Size: | 0.500 in. | | Formation Name: | CORCORAN | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 6/22/2009 | | Treatment Summary: | FRAC'D W/ 212,400# 40/70 API AND 36,900# 100 MESH PROPPANT |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 7/3/2009 | Test Method: | | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BTU_GAS | 1028 | | CALC_BBLS_H2O | 434 | | CALC_BBLS_OIL | 0 | | CALC_MCF_GAS | 360 | | CASING_PRESS | 1352 |
| | Perforation Data: | | Interval Top: | 11522 ft. | # Of Holes: | 60 | | Interval Bottom: | 11951 ft. | Hole Size: | 0.34 in. |
|
Formation COZZ Formation Classification: GW Status: SI - 7/1/2025 Interval Top: 11295 ft. Interval Bottom: 11478 ft.| Completed Information for Formation COZZETTE | | 1st Production Date: | 6/28/2009 | Choke Size: | 0.500 in. | | Formation Name: | COZZETTE | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 6/25/2009 | | Treatment Summary: | FRAC'D W/ 172,100# 40/70 API AND 29,300# 100 MESH PROPPANT. SET FRAC PLUGS @ 11,460'. ALL FRAC PLUGS DO |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 7/3/2009 | Test Method: | | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| CALC_BBLS_H2O | 159 | | CALC_BBLS_OIL | 0 | | CALC_MCF_GAS | 132 | | CASING_PRESS | 1352 |
| | Perforation Data: | | Interval Top: | 11295 ft. | # Of Holes: | 60 | | Interval Bottom: | 11478 ft. | Hole Size: | 0.34 in. |
|
Formation WFCM Formation Classification: GW Status: SI - 7/1/2025 Interval Top: 8710 ft. Interval Bottom: 10938 ft.| Completed Information for Formation WILLIAMS FORK - CAMEO | | 1st Production Date: | 6/28/2009 | Choke Size: | 0.500 in. | | Formation Name: | WILLIAMS FORK - CAMEO | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 7/14/2009 | | Treatment Summary: | FRAC'D W/ 1,056,000# 40/70 API & 119,900# 100 MESH PROPPANT. SET FRAC PLUGS@10,925; 10,380; 9,872; 9,450 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 7/3/2009 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| CALC_BBLS_H2O | 1977 | | CALC_BBLS_OIL | 0 | | CALC_MCF_GAS | 1638 | | CASING_PRESS | 1352 |
| | Perforation Data: | | Interval Top: | 8710 ft. | # Of Holes: | 348 | | Interval Bottom: | 10938 ft. | Hole Size: | 0.34 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | Y | Production Period 12/2024 - 11/2025 |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 12 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.006 |
| Average MCFE per Day | 0.033 |
| Federal Financial Assurance | i | Y |
|
|