|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 10/1/2022 Measured TD: 11835 ft. Vertical TD: 11644 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 10/1/2022 | | Wellbore Permit | DIRECTIONAL | | Permit #: | 20084461 | Expiration Date: | 9/3/2009 | | Proposed Top PZ Location: | Sec:3 Twp: 2S 98W | Footage: 631 FNL 1979 FEL | | Bottom Hole Location: | Sec:3 Twp: 2S 98W | Footage: 631 FNL 1979 FEL | | Proposed Depth/Form: | 11798 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEDERAL | Surface Owner: | FEDERAL | | Unit: | RYAN GULCH UINI | Unit Number: | COC68239 | | Formation And Spacing: | Code: ILES , Formation: ILES , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: SEGO , Formation: SEGO , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: WMFK , Formation: WILLIAMS FORK , Order: , Unit Acreage: , Drill Unit: |
| | |
| Wellbore Completed | | Completion Date: | 6/30/2009 | | Spud Date: | 5/19/2009 | Spud Date Is: | ACTUAL | | Measured TD: | 11835 ft. | Measured PB depth: | 11730 ft. | | True Vertical TD: | 11644 ft. | True Vertical PB depth: | 11539 ft. | | Top PZ Location: | Sec:3 Twp: 2S 98W | Footage: 631 FNL 1979 FEL | | Bottom Hole Location: | Sec:3 Twp: 2S 98W | Footage: 631 FNL 1979 FEL | | Log Types: | CBL, MUD | | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 48 ft., Depth: 80 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 135, Top: 0 ft., Bottom: 80 ft., Determination Method: | | Casing: | String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 3788 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 2101, Top: 0 ft., Bottom: 3788 ft., Determination Method: | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 11821 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 1881, Top: 4750 ft., Bottom: 11821 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | MESAVERDE | 7119 ft. | | N | N | | CAMEO | 10174 ft. | | N | N | | ROLLINS | 10608 ft. | | N | N | | COZZETTE | 10732 ft. | | N | N | | CORCORAN | 10970 ft. | | N | N | | SEGO | 11326 ft. | | N | N |
Formation SEGO Formation Classification: GW Status: PR - 10/1/2022 Interval Top: 11242 ft. Interval Bottom: 11610 ft.| Completed Information for Formation SEGO | | 1st Production Date: | 10/5/2009 | Choke Size: | | | Formation Name: | SEGO | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 10/5/2009 | | Treatment Summary: | 84000 GAL 10% HCL ACID, 385800 # 100 MESH AND 30/550 SAND, 12524 BBLS SLICKWATER |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation SEGO. |
| | Perforation Data: | | Interval Top: | 11242 ft. | # Of Holes: | 44 | | Interval Bottom: | 11610 ft. | Hole Size: | 0.36 in. |
|
Formation CRCRN Formation Classification: GW Status: PR - 10/1/2022 Interval Top: 11039 ft. Interval Bottom: 11188 ft.| Completed Information for Formation CORCORAN | | 1st Production Date: | 10/8/2009 | Choke Size: | | | Formation Name: | CORCORAN | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 10/8/2009 | | Treatment Summary: | 42000 GAL 10% HCL ACID, 163300 # 100 MESH AND 30/550 SAND, 5471 BBLS SLICKWATER |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CRCRN. |
| | Perforation Data: | | Interval Top: | 11039 ft. | # Of Holes: | 22 | | Interval Bottom: | 11188 ft. | Hole Size: | 0.36 in. |
|
Formation COZZ Formation Classification: GW Status: PR - 10/1/2022 Interval Top: 10814 ft. Interval Bottom: 11006 ft.| Completed Information for Formation COZZETTE | | 1st Production Date: | 10/9/2009 | Choke Size: | | | Formation Name: | COZZETTE | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 10/9/2009 | | Treatment Summary: | 42000 GAL 10% HCI ACID, 135600 # 100 MESH AND 30/50 SAND, 4340 BBLS SLICKWATER |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation COZZ. |
| | Perforation Data: | | Interval Top: | 10814 ft. | # Of Holes: | 22 | | Interval Bottom: | 11006 ft. | Hole Size: | 0.36 in. |
|
Formation WFCM Formation Classification: GW Status: PR - 10/1/2022 Interval Top: 8370 ft. Interval Bottom: 10550 ft.| Completed Information for Formation WILLIAMS FORK - CAMEO | | 1st Production Date: | 12/12/2009 | Choke Size: | 0.281 in. | | Formation Name: | WILLIAMS FORK - CAMEO | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 10/12/2009 | | Treatment Summary: | 378000 GAL 10% HCI ACID, 974471 # 100 MESH AND 30/50 SAND, 34494 BBLS SLICKWATER |
| | Tubing Size: | 3.375 in. | Tubing Setting Depth: | 11487 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 10/17/2009 | Test Method: | FLOWING | | Hours Tested: | | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BTU_GAS | 1100 | | CASING_PRESS | 3200 | | MCF_GAS | 1400 | | TUBING_PRESS | 1950 |
| | Perforation Data: | | Interval Top: | 8370 ft. | # Of Holes: | 186 | | Interval Bottom: | 10550 ft. | Hole Size: | 0.36 in. |
|
Formation WFILS Formation Classification: GW Status: CM - 11/17/2009 Interval Top: 8370 ft. Interval Bottom: 11610 ft.| Completed Information for Formation WILLIAMS FORK-ILES | | 1st Production Date: | 10/5/2009 | Choke Size: | 0.281 in. | | Formation Name: | WILLIAMS FORK-ILES | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 10/5/2009 | | Treatment Summary: | 546000 GAL 10% HCI ACID, 1659171 # 30/50 AND 100 MESH SAND, 56829 BBLS SLICKWATER |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 11487 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 11/17/2009 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BTU_GAS | 1090 | | CASING_PRESS | 3200 | | MCF_GAS | 1400 | | TUBING_PRESS | 1950 |
| | Perforation Data: | | Interval Top: | 8370 ft. | # Of Holes: | 274 | | Interval Bottom: | 11610 ft. | Hole Size: | 0.36 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 188 |
| Total Gas Produced (MCF) | 26664 |
| GOR | 141829 |
| GOR Determination | MCFE |
| Average BOE per Day | 13.117 |
| Average MCFE per Day | 76.062 |
| Federal Financial Assurance | i | Y |
|
|