Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-103-11265
Well Classification: GW Status: PR - 1/1/2026
Well Name/No:YELLOW CREEK #XOM 2-35-1
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date1/1/2026
FacilityID:295734LocationID:316678
County:RIO BLANCO #103Location:NWSE 2 1S98W 6
Field:YELLOW CREEK - #97955Elevation:6129 ft.
Basin:PICEANCE BASIN  
Planned Location:2003FSL  1829 FELLat/Long: 39.991310 / -108.355590Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.991300 / -108.355590Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 1/1/2026             Measured TD: 11800 ft.    Vertical TD: 11776 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 1/1/2026
Wellbore PermitDIRECTIONAL
Permit #:20081313 Expiration Date:4/23/2009
Proposed Top PZ Location:Sec:2 Twp: 1S 98W Footage: 2077 FSL  2029 FEL
Bottom Hole Location:Sec:2 Twp: 1S 98W Footage: 2077 FSL  2029 FEL
Proposed Depth/Form:12503 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:STATE
Unit: Unit Number: 
Formation And Spacing:Code: CSLGT , Formation: CASTLEGATE , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: MVRD , Formation: MESAVERDE , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: RLNS , Formation: ROLLINS , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: SEGO , Formation: SEGO , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:9/23/2008
Spud Date:7/10/2008Spud Date Is:ACTUAL
Measured TD:11800 ft.Measured PB depth:11740 ft.
True Vertical TD:11776 ft.True Vertical PB depth:11716 ft.
Top PZ Location:Sec:2 Twp: 1S 98WFootage: 2077 FSL  2029 FEL
Bottom Hole Location:Sec:2 Twp: 1S 98WFootage: 2077 FSL  2029 FEL
Log Types:GR/CBL/RCBL TRIPLE COMBO
Casing:String Type: CONDUCTOR, Hole Size: 28 in., Size: 20 in., Top: 0 ft., Depth: 90 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 105, Top: 0 ft., Bottom: 90 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 1228 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 1515, Top: 0 ft., Bottom: 1228 ft., Determination Method: CBL
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 7265 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 1078, Top: 2780 ft., Bottom: 11749 ft., Determination Method: CBL
Casing:String Type: 2ND, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 1228 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 880, Top: 1228 ft., Bottom: 3299 ft., Determination Method: CBL
Casing:String Type: S.C. 2.1, Hole Size: , Size: , Top: , Depth: , Weight: , Citings Type: ACTUAL
Cement:Sacks: 635, Top: , Bottom: , Determination Method:
Casing:String Type: 3RD, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 7265 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 589, Top: 8204 ft., Bottom: 11749 ft., Determination Method: CBL
Casing:String Type: S.C. 3.1, Hole Size: , Size: , Top: , Depth: , Weight: , Citings Type: ACTUAL
Cement:Sacks: 489, Top: 3150 ft., Bottom: 7588 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
MESAVERDE6485 ft.NN
ROLLINS10296 ft.NN
COZZETTE10427 ft.NN
CORCORAN10619 ft.NN
SEGO11182 ft.NN

Formation SEGO                     Formation Classification:  GW                     Status:  SI - 8/1/2021                  Interval Top: 11228 ft.    Interval Bottom: 11581 ft.

 Completed Information for Formation SEGO
1st Production Date:N/AChoke Size: 
Formation Name:SEGOCommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:11/18/2008
Treatment Summary:2116 GALS OF 7.5% HCL WITH 120230 LBS OF 40/80 INTERPROP AND 7311 BBLS OF SLICKWATER
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 672
BBLS_OIL 0
BTU_GAS 1103
CALC_GOR 0
CALC_MCF_GAS 2140
CASING_PRESS 2380
GRAVITY_OIL 60
MCF_GAS 2140
Perforation Data:
Interval Top:11228 ft.# Of Holes:50
Interval Bottom:11581 ft.Hole Size:0.34 in.

Formation CRCRN                   Formation Classification:  GW                   Status:  SI - 8/1/2021                  Interval Top: 10628 ft.    Interval Bottom: 11126 ft.

 Completed Information for Formation CORCORAN
1st Production Date:N/AChoke Size: 
Formation Name:CORCORANCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:11/18/2008
Treatment Summary:2116 GALS OF 7.5% HCL WITH 187019 LBS OF 40/80 INTERPROP AND 9632 BBLS OF SLICKWATER
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 672
BBLS_OIL 0
BTU_GAS 1103
CALC_GOR 0
CALC_MCF_GAS 2140
CASING_PRESS 2380
GRAVITY_OIL 60
MCF_GAS 2140
Perforation Data:
Interval Top:10628 ft.# Of Holes:69
Interval Bottom:11126 ft.Hole Size:0.34 in.

Formation RLNS                     Formation Classification:  GW                     Status:  PR - 1/1/2026                  Interval Top: 10302 ft.    Interval Bottom: 10443 ft.

 Completed Information for Formation ROLLINS
1st Production Date:9/12/2010Choke Size: 
Formation Name:ROLLINSCommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:9/7/2010
Treatment Summary:4,977 bbls. slickwater; 74,200 lbs. 40/70 Prime Plus RCS
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/14/2010Test Method:Flowing
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 152
BTU_GAS 1070
CALC_BBLS_H2O 152
CALC_MCF_GAS 138
CASING_PRESS 1440
MCF_GAS 138
Perforation Data:
Interval Top:10302 ft.# Of Holes:36
Interval Bottom:10443 ft.Hole Size:0.36 in.

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 1/1/2026                  Interval Top: 8598 ft.    Interval Bottom: 10270 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:9/12/2010Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:9/7/2010
Treatment Summary:27,677 bbls. slickwater; 167 bbls. 7.5% HCL; 452,415 lbs. Prime Plus RCS
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/14/2010Test Method:Flowing
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 1374
BTU_GAS 1070
CALC_BBLS_H2O 1374
CALC_MCF_GAS 1248
CASING_PRESS 1440
MCF_GAS 1248
Perforation Data:
Interval Top:8598 ft.# Of Holes:189
Interval Bottom:10270 ft.Hole Size:0.36 in.

Formation WMRCM                   Formation Classification:  GW                   Status:  CM - 9/14/2010                 Interval Top: 8598 ft.    Interval Bottom: 10443 ft.

 Completed Information for Formation WILLIAMS FK-ROLLINS-CAMEO
1st Production Date:9/12/2010Choke Size: 
Formation Name:WILLIAMS FK-ROLLINS-CAMEOCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:9/7/2010
Treatment Summary:32,654 bbls slickwater; 167 bbls. 7.5% HCL; 526,615 lbs. 40/70 Prime Plus RCS
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/14/2010Test Method:Flowing
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 1526
BTU_GAS 1070
CALC_BBLS_H2O 1526
CALC_MCF_GAS 1386
CASING_PRESS 1440
MCF_GAS 1386
Perforation Data:
Interval Top:8598 ft.# Of Holes:225
Interval Bottom:10443 ft.Hole Size:0.36 in.
Primary Well Designation:
Low Producing      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingYProduction Period
12/2024 - 11/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR DeterminationMCFE
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i Y

 Tribal Well  i No