|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 12/7/2007 Measured TD: 12140 ft. Vertical TD: 12041 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 12/7/2007 | | Wellbore Permit | DIRECTIONAL | | Permit #: | 20076931 | Expiration Date: | 2/3/2009 | | Proposed Top PZ Location: | Sec: Twp: | Footage: 1386 FNL 1044 FEL | | Bottom Hole Location: | Sec:2 Twp: 2S 98W | Footage: 1386 FNL 1044 FEL | | Proposed Depth/Form: | 12154 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEDERAL | Surface Owner: | FEDERAL | | Unit: | RYAN GULCH UNIT | Unit Number: | COC068239X | | Formation And Spacing: | Code: ILES , Formation: ILES , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: SEGO , Formation: SEGO , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: WMFK , Formation: WILLIAMS FORK , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: WSTC , Formation: WASATCH , Order: UNSPACED , Unit Acreage: , Drill Unit: |
| | |
| Wellbore Completed | | Completion Date: | 9/27/2008 | | Spud Date: | 8/24/2008 | Spud Date Is: | ACTUAL | | Measured TD: | 12140 ft. | Measured PB depth: | 12210 ft. | | True Vertical TD: | 12041 ft. | True Vertical PB depth: | 12111 ft. | | Top PZ Location: | Sec:2 Twp: 2S 98W | Footage: 1388 FNL 974 FEL | | Bottom Hole Location: | Sec:2 Twp: 2S 98W | Footage: 1388 FNL 974 FEL | | Log Types: | CBL; HIGH RESOLUTION INDUCTION, SPECTRAL DENSITY, DUAL SPACED NEUTRON, MUD | | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 48 ft., Depth: 80 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 135, Top: 0 ft., Bottom: 80 ft., Determination Method: CALC | | Casing: | String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 3902 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 1508, Top: 0 ft., Bottom: 3902 ft., Determination Method: | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 10922 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 1620, Top: 6550 ft., Bottom: 10922 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | MESAVERDE | 7331 ft. | | N | N | | CAMEO | 10494 ft. | | N | N | | ROLLINS | 10947 ft. | | N | N | | COZZETTE | 11084 ft. | | N | N | | CORCORAN | 11312 ft. | | N | N | | SEGO | 11672 ft. | | N | N |
Formation SEGO Formation Classification: GW Status: PR - 12/7/2007 Interval Top: 11672 ft. Interval Bottom: 11943 ft.| Completed Information for Formation SEGO | | 1st Production Date: | 11/23/2008 | Choke Size: | | | Formation Name: | SEGO | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 11/23/2008 | | Treatment Summary: | 1,400 GALS 10% HCL ACID; 148,980# 30/50 SAND; 6684 BBLS SLICKWATER |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation SEGO. |
| | Perforation Data: | | Interval Top: | 11672 ft. | # Of Holes: | 30 | | Interval Bottom: | 11943 ft. | Hole Size: | 0.36 in. |
|
Formation CRCRN Formation Classification: GW Status: PR - 12/7/2007 Interval Top: 11312 ft. Interval Bottom: 11671 ft.| Completed Information for Formation CORCORAN | | 1st Production Date: | 11/25/2008 | Choke Size: | | | Formation Name: | CORCORAN | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 11/25/2008 | | Treatment Summary: | 1,752 GALS 10% HCL ACID; 653,998# 30/50 SAND; 6255 BBLS SLICKWATER |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CRCRN. |
| | Perforation Data: | | Interval Top: | 11312 ft. | # Of Holes: | 45 | | Interval Bottom: | 11671 ft. | Hole Size: | 0.36 in. |
|
Formation COZZ Formation Classification: GW Status: PR - 12/7/2007 Interval Top: 11224 ft. Interval Bottom: 11311 ft.| Completed Information for Formation COZZETTE | | 1st Production Date: | 11/25/2008 | Choke Size: | | | Formation Name: | COZZETTE | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 11/25/2008 | | Treatment Summary: | 392 GALS 10% HCL ACID; 42,393# 30/50 SAND; 1,437 BBLS SLICKWATER |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation COZZ. |
| | Perforation Data: | | Interval Top: | 11224 ft. | # Of Holes: | 12 | | Interval Bottom: | 11311 ft. | Hole Size: | 0.36 in. |
|
Formation WFCM Formation Classification: GW Status: PR - 12/7/2007 Interval Top: 8647 ft. Interval Bottom: 10854 ft.| Completed Information for Formation WILLIAMS FORK - CAMEO | | 1st Production Date: | 11/26/2008 | Choke Size: | | | Formation Name: | WILLIAMS FORK - CAMEO | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 11/26/2008 | | Treatment Summary: | 6790 GALS 10% HCL ACID; 861,629# 30/50 SAND; 23,764 BBLS SLICKWATER |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation WFCM. |
| | Perforation Data: | | Interval Top: | 8647 ft. | # Of Holes: | 158 | | Interval Bottom: | 10854 ft. | Hole Size: | 0.36 in. |
|
Formation WFILS Formation Classification: GW Status: CM - 12/30/2008 Interval Top: 8647 ft. Interval Bottom: 11493 ft.| Completed Information for Formation WILLIAMS FORK-ILES | | 1st Production Date: | 11/23/2008 | Choke Size: | 0.281 in. | | Formation Name: | WILLIAMS FORK-ILES | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 11/23/2008 | | Treatment Summary: | 10,234 GAL 10% HCI ACID; 1,707,000# 30/50 SAND; 38,140 BBLS SLICKWATER |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 11833 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 12/30/2008 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BTU_GAS | 1086 | | CALC_GOR | 0 | | CALC_MCF_GAS | 1900 | | CASING_PRESS | 2775 | | MCF_GAS | 1900 | | TUBING_PRESS | 2175 |
| | Perforation Data: | | Interval Top: | 8647 ft. | # Of Holes: | 245 | | Interval Bottom: | 11493 ft. | Hole Size: | 0.36 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 173 |
| Total Gas Produced (MCF) | 20789 |
| GOR | 120167 |
| GOR Determination | MCFE |
| Average BOE per Day | 10.305 |
| Average MCFE per Day | 59.752 |
| Federal Financial Assurance | i | Y |
|
|