|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: SI - 8/1/2025 Measured TD: 12000 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW SI - 8/1/2025 | | Wellbore Permit | | | Permit #: | 20073380 | Expiration Date: | 10/29/2008 | | Proposed Depth/Form: | 12633 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEDERAL | Surface Owner: | FEDERAL | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: MVRD , Formation: MESAVERDE , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: RLNS , Formation: ROLLINS , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: SEGO , Formation: SEGO , Order: , Unit Acreage: , Drill Unit: | | Casing: | String Type: 2ND, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 12633 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 703, Top: 3533 ft., Bottom: 12633 ft. |
| | |
| Wellbore Completed | | Completion Date: | 5/9/2008 | | Spud Date: | 1/7/2008 | Spud Date Is: | ACTUAL | | Measured TD: | 12000 ft. | Measured PB depth: | 11934 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | CBL/GR/CCL, CHI TRIP COMBO, MUD | | Casing: | String Type: CONDUCTOR, Hole Size: 28 in., Size: 20 in., Top: 0 ft., Depth: 60 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 131, Top: 0 ft., Bottom: 60 ft., Determination Method: | | Casing: | String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 3660 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 1510, Top: 0 ft., Bottom: 3660 ft., Determination Method: | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 11985 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 1193, Top: 8570 ft., Bottom: 11938 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 7324 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 635, Top: 3864 ft., Bottom: 7820 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | WILLIAMS FORK | 6710 ft. | | N | N | | ROLLINS | 10578 ft. | | N | N | | COZZETTE | 10695 ft. | | N | N | | CORCORAN | 10910 ft. | | N | N | | SEGO | 11315 ft. | | N | N |
Formation SEGO Formation Classification: GW Status: SI - 8/1/2025 Interval Top: 11325 ft. Interval Bottom: 11870 ft.| Completed Information for Formation SEGO | | 1st Production Date: | 11/26/2008 | Choke Size: | | | Formation Name: | SEGO | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 11/15/2008 | | Treatment Summary: | 2016 GALLONS OF 7.5% HCL WITH 177,831# OF 40/70 ECONOPROP AND 9742 BBLS OF SLICKWATER |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation SEGO. |
| | Perforation Data: | | Interval Top: | 11325 ft. | # Of Holes: | 60 | | Interval Bottom: | 11870 ft. | Hole Size: | 0.34 in. |
|
Formation CRCRN Formation Classification: GW Status: SI - 8/1/2025 Interval Top: 10914 ft. Interval Bottom: 11154 ft.| Completed Information for Formation CORCORAN | | 1st Production Date: | 11/26/2008 | Choke Size: | | | Formation Name: | CORCORAN | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 11/14/2008 | | Treatment Summary: | 2016 GALLONS OF 7.5% HCL WITH 104,950# OF 40/80 INTERPROP AND 114,873 # OF 40/70 ECONOPROP AND 11,487 BBLS OF SLICK WATER |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CRCRN. |
| | Perforation Data: | | Interval Top: | 10914 ft. | # Of Holes: | 35 | | Interval Bottom: | 11154 ft. | Hole Size: | 0.34 in. |
|
Formation RLNS Formation Classification: GW Status: SI - 8/1/2025 Interval Top: 10596 ft. Interval Bottom: 10700 ft.| Completed Information for Formation ROLLINS | | 1st Production Date: | 11/26/2008 | Choke Size: | | | Formation Name: | ROLLINS | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 11/14/2008 | | Treatment Summary: | 1008 GALLONS OF 7.5% HCL WITH 76,390 # OF 40/80 INTERPROP AND 3221 BBLS OF SLICKWATER |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation RLNS. |
| | Perforation Data: | | Interval Top: | 10596 ft. | # Of Holes: | 34 | | Interval Bottom: | 10700 ft. | Hole Size: | 0.34 in. |
|
Formation WFILS Formation Classification: GW Status: CM - 11/24/2008 Interval Top: 9106 ft. Interval Bottom: 11870 ft.| Completed Information for Formation WILLIAMS FORK-ILES | | 1st Production Date: | 11/26/2008 | Choke Size: | 0.281 in. | | Formation Name: | WILLIAMS FORK-ILES | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 11/24/2008 | | Treatment Summary: | |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8906 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 11/24/2008 | Test Method: | FLARED | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 816 | | BBLS_OIL | 0 | | BTU_GAS | 1059 | | CALC_BBLS_H2O | 816 | | CALC_BBLS_OIL | 0 | | CALC_GOR | 0 | | CALC_MCF_GAS | 1370 | | CASING_PRESS | 2050 | | MCF_GAS | 1370 | | TUBING_PRESS | 1567 |
| | Perforation Data: | | Interval Top: | 9106 ft. | # Of Holes: | 244 | | Interval Bottom: | 11870 ft. | Hole Size: | 0.34 in. |
|
Formation WMFK Formation Classification: GW Status: SI - 8/1/2025 Interval Top: 9106 ft. Interval Bottom: 10293 ft.| Completed Information for Formation WILLIAMS FORK | | 1st Production Date: | 11/26/2008 | Choke Size: | | | Formation Name: | WILLIAMS FORK | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 11/15/2008 | | Treatment Summary: | 4032 GALS OF 7/5% HCL W/ 398,125# 40/80 INTERPROP & 16,153 BBLS OF SLICKWATER |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation WMFK. |
| | Perforation Data: | | Interval Top: | 9106 ft. | # Of Holes: | 115 | | Interval Bottom: | 10293 ft. | Hole Size: | 0.34 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | Y | Production Period 12/2024 - 11/2025 |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 2859 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 1.364 |
| Average MCFE per Day | 7.926 |
| Federal Financial Assurance | i | Y |
|
|