Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-103-11070
Well Classification: GW Status: PR - 1/1/2026
Well Name/No:YELLOW CREEK FEDERAL #34-22-1
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC59394
Facility Status:PRStatus Date1/1/2026
FacilityID:291959LocationID:316654
County:RIO BLANCO #103Location:SENW 34 1N98W 6
Field:YELLOW CREEK - #97955Elevation:6456 ft.
Basin:PICEANCE BASIN  
Planned Location:1814FNL  1863 FWLLat/Long: 40.013990 / -108.380470Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.013990 / -108.380470Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 1/1/2026             Measured TD: 11744 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 1/1/2026
Wellbore Permit
Permit #:20073382 Expiration Date:8/15/2008
Proposed Depth/Form:12230 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit:YELLOW CREEK FE Unit Number:COC68597X
Formation And Spacing:Code: MVRD , Formation: MESAVERDE , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: RLNS , Formation: ROLLINS , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: SEGO , Formation: SEGO , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:4/6/2008
Spud Date:12/4/2007Spud Date Is:ACTUAL
Measured TD:11744 ft.Measured PB depth:11522 ft.
True Vertical TD:True Vertical PB depth:
Log Types:TRIPLE COMBO=DSN/SD/HRI/MICROL; RCBL; MUDLOG
Casing:String Type: CONDUCTOR, Hole Size: 28 in., Size: 20 in., Top: 0 ft., Depth: 60 ft., Weight: 94 , Citings Type: ACTUAL
Cement:Sacks: 131, Top: 0 ft., Bottom: 40 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 3351 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 815, Top: 1250 ft., Bottom: 3351 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 11717 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 915, Top: 7330 ft., Bottom: 11717 ft., Determination Method: CBL
Casing:String Type: S.C. 1.2, Hole Size: , Size: , Top: , Depth: 7330 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 750, Top: 4482 ft., Bottom: 7330 ft., Determination Method: CBL
Casing:String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 1250 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 670, Top: 0 ft., Bottom: 1250 ft., Determination Method: VISU
FormationInterval TopLog BottomCoredDSTs
WILLIAMS FORK - CAMEO6562 ft.10223 ft.NN
ROLLINS10223 ft.10337 ft.NN
COZZETTE10337 ft.10487 ft.NN
CORCORAN10487 ft.11138 ft.NN
SEGO11138 ft.NN

Formation SEGO                     Formation Classification:  GW                     Status:  PR - 1/1/2026                  Interval Top: 11464 ft.    Interval Bottom: 11526 ft.

 Completed Information for Formation SEGO
1st Production Date:6/14/2008Choke Size: 
Formation Name:SEGOCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:6/8/2008
Treatment Summary:1,000 GAL 12.5% HCL; 48,808# 30/60 SINTERLITE; 2,253 BBLS SLICKWATER
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation SEGO.
Perforation Data:
Interval Top:11464 ft.# Of Holes:18
Interval Bottom:11526 ft.Hole Size:0.36 in.

Formation CRCRN                   Formation Classification:  GW                   Status:  PR - 1/1/2026                  Interval Top: 10492 ft.    Interval Bottom: 10777 ft.

 Completed Information for Formation CORCORAN
1st Production Date:6/14/2008Choke Size: 
Formation Name:CORCORANCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:6/8/2008
Treatment Summary:1,315 GAL 12.5% HCL; 124,237# 30/60 SINTERLITE; 5,917 BBLS SLICKWATER
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CRCRN.
Perforation Data:
Interval Top:10492 ft.# Of Holes:33
Interval Bottom:10777 ft.Hole Size:0.36 in.

Formation COZZ                     Formation Classification:  GW                     Status:  PR - 1/1/2026                  Interval Top: 10352 ft.    Interval Bottom: 10461 ft.

 Completed Information for Formation COZZETTE
1st Production Date:6/14/2008Choke Size: 
Formation Name:COZZETTECommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:6/8/2008
Treatment Summary:680 GAL 12.5% HCL; 34,328# 30/60 SINTERLITE; 2,244 BBLS SLICKWATER
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation COZZ.
Perforation Data:
Interval Top:10352 ft.# Of Holes:13
Interval Bottom:10461 ft.Hole Size:0.36 in.

Formation RLNS                     Formation Classification:  GW                     Status:  PR - 1/1/2026                  Interval Top: 10242 ft.    Interval Bottom: 10288 ft.

 Completed Information for Formation ROLLINS
1st Production Date:6/14/2008Choke Size: 
Formation Name:ROLLINSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:6/9/2008
Treatment Summary:770 GAL 12.5% HCL; 74,260# 30/60 SINTERLITE; 3,584 BBLS SLICKWATER
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation RLNS.
Perforation Data:
Interval Top:10242 ft.# Of Holes:20
Interval Bottom:10288 ft.Hole Size:0.36 in.

Formation WFILS                   Formation Classification:  GW                   Status:  CM - 6/27/2008                 Interval Top: 9370 ft.    Interval Bottom: 11526 ft.

 Completed Information for Formation WILLIAMS FORK-ILES
1st Production Date:6/14/2008Choke Size:0.438 in.
Formation Name:WILLIAMS FORK-ILESCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:6/8/2008
Treatment Summary:
Tubing Size:2.375 in.Tubing Setting Depth:9257 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/27/2008Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 360
BBLS_OIL 0
BTU_GAS 1077
CALC_BBLS_H2O 360
CALC_BBLS_OIL 0
CALC_GOR 0
CALC_MCF_GAS 3600
CASING_PRESS 2450
MCF_GAS 3600
TUBING_PRESS 1550
Perforation Data:
Interval Top:9370 ft.# Of Holes:194
Interval Bottom:11526 ft.Hole Size:0.36 in.

Formation WMFK                     Formation Classification:  GW                     Status:  PR - 1/1/2026                  Interval Top: 9370 ft.    Interval Bottom: 10193 ft.

 Completed Information for Formation WILLIAMS FORK
1st Production Date:6/14/2008Choke Size: 
Formation Name:WILLIAMS FORKCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:6/10/2008
Treatment Summary:3,002 GAL 12.5% HCL; 371,082# 30/60 SINTERLITE; 14,025 BBLS SLICKWATER; 2,194 BBLS LINEAR GEL
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation WMFK.
Perforation Data:
Interval Top:9370 ft.# Of Holes:110
Interval Bottom:10193 ft.Hole Size:0.36 in.
Primary Well Designation:
Low Producing      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingYProduction Period
12/2024 - 11/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR DeterminationMCFE
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i Y

 Tribal Well  i No