Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-103-11026
Well Classification: GW Status: SI - 10/1/2025
Well Name/No:FEDERAL RGU #32-1-298
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC60736
Facility Status:SIStatus Date10/1/2025
FacilityID:290890LocationID:335640
County:RIO BLANCO #103Location:SESE 1 2S98W 6
Field:SULPHUR CREEK - #80090Elevation:6282 ft.
Basin:PICEANCE BASIN  
Planned Location:780FSL  786 FELLat/Long: 39.901005 / -108.336215Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.901005 / -108.336215Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: SI - 10/1/2025             Measured TD: 11940 ft.    Vertical TD: 11652 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        SI - 10/1/2025
Wellbore PermitDIRECTIONAL
Permit #:20072076 Expiration Date:6/3/2008
Proposed Top PZ Location:Sec:1 Twp: 2S 98W Footage: 2662 FSL  1920 FEL
Bottom Hole Location:Sec:1 Twp: 2S 98W Footage: 2662 FSL  1920 FEL
Proposed Depth/Form:12111 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit:RYAN GULCH UNIT Unit Number:COC68239X
Formation And Spacing:Code: ILES , Formation: ILES , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: SEGO , Formation: SEGO , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: WSTC , Formation: WASATCH , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:1/19/2008
Spud Date:12/9/2007Spud Date Is:ACTUAL
Measured TD:11940 ft.Measured PB depth:11900 ft.
True Vertical TD:11652 ft.True Vertical PB depth:11612 ft.
Top PZ Location:Sec:1 Twp: 2S 98WFootage: 2662 FSL  1920 FEL
Bottom Hole Location:Sec:1 Twp: 2S 98WFootage: 2662 FSL  1920 FEL
Log Types:CBL; HIGH RES.INDUCTION, SPECTRAL DENSITY, DUAL SPACED NEUTRON; MUD
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 19 in., Top: , Depth: 80 ft., Weight: 48 , Citings Type: ACTUAL
Cement:Sacks: 135, Top: 0 ft., Bottom: 60 ft., Determination Method:
Casing:String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 3369 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 1350, Top: 0 ft., Bottom: 3369 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 11945 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 1861, Top: 1650 ft., Bottom: 11945 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
MESAVERDE6996 ft.NN
COZZETTE10073 ft.NN
CAMEO10490 ft.NN
ROLLINS10932 ft.NN
SEGO11258 ft.NN

Formation SEGO                     Formation Classification:  GW                     Status:  SI - 10/1/2025                 Interval Top: 11659 ft.    Interval Bottom: 11834 ft.

 Completed Information for Formation SEGO
1st Production Date:3/22/2008Choke Size: 
Formation Name:SEGOCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:3/18/2008
Treatment Summary:750 GALS 10% HCI ACID; 71,000# 30/50 SAND; 2523 BBLS SLICKWATER
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation SEGO.
Perforation Data:
Interval Top:11659 ft.# Of Holes:18
Interval Bottom:11834 ft.Hole Size:0.35 in.

Formation WFCM                     Formation Classification:  GW                     Status:  SI - 10/1/2025                 Interval Top: 7904 ft.    Interval Bottom: 10853 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:3/22/2008Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:3/21/2008
Treatment Summary:8000 GALS 10% HCI ACID; 779,400# 30/50 SAND; 25,426 BBLS SLICKWATER
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation WFCM.
Perforation Data:
Interval Top:7904 ft.# Of Holes:177
Interval Bottom:10853 ft.Hole Size:0.35 in.

Formation WFILS                   Formation Classification:  GW                   Status:  CM - 4/16/2008                 Interval Top: 7904 ft.    Interval Bottom: 11834 ft.

 Completed Information for Formation WILLIAMS FORK-ILES
1st Production Date:3/22/2008Choke Size:0.375 in.
Formation Name:WILLIAMS FORK-ILESCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:3/18/2008
Treatment Summary:** FORMATION IS WILLIAMS FORK-ILES-CAMEO** 8750 GALS 10% HCI ACID; 850,400# 30/50 SAND; 27,949 BBLS SLICKWATER.
Tubing Size:3.875 in.Tubing Setting Depth:11740 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/16/2008Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1170
CALC_MCF_GAS 2600
CASING_PRESS 2400
MCF_GAS 2600
TUBING_PRESS 1500
Perforation Data:
Interval Top:7904 ft.# Of Holes:195
Interval Bottom:11834 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)37
Total Gas Produced (MCF)8697
GOR235054
GOR DeterminationMCFE
Average BOE per Day4.243
Average MCFE per Day24.616

 Federal Financial Assurance  i Y

 Tribal Well  i No