|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: CBM Status: AB - 9/30/2022 Measured TD: 8665 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: CBM AB - 9/30/2022 | | Wellbore Permit | | | Permit #: | 20080935 | Expiration Date: | 4/13/2009 | | Proposed Depth/Form: | 16085 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEDERAL | Surface Owner: | FEDERAL | | Unit: | PICEANCE DEEP | Unit Number: | COC 071443X | | Formation And Spacing: | Code: MVRD , Formation: MESAVERDE , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: WSTC , Formation: WASATCH , Order: , Unit Acreage: , Drill Unit: | | Casing: | String Type: 2ND, Hole Size: 8.5 in., Size: 5.5 in., Top: , Depth: 16085 ft., Weight: 23 , Citings Type: PLANNED | | Cement: | Sacks: 1230, Top: 8850 ft., Bottom: 16085 ft. |
| | |
| Wellbore Completed | | Completion Date: | 11/3/2008 | | Spud Date: | 7/22/2008 | Spud Date Is: | ACTUAL | | Measured TD: | 8665 ft. | Measured PB depth: | 8608 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | GAMMA RAY/CCL, TEMP, CBL/VDL, MULTI-SENSOR CALIPER, GEO-HYDRO STRIP, MUD, RST | | Casing: | String Type: CONDUCTOR, Hole Size: , Size: , Top: 0 ft., Depth: 135 ft., Weight: 54# , Citings Type: ACTUAL | | Cement: | Sacks: 96, Top: 0 ft., Bottom: 135 ft., Determination Method: CALC | | Casing: | String Type: SURF, Hole Size: 17.5 in., Size: 13.375 in., Top: 0 ft., Depth: 3865 ft., Weight: 36# , Citings Type: ACTUAL | | Cement: | Sacks: 2245, Top: 0 ft., Bottom: 3865 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 8652 ft., Weight: 40# , Citings Type: ACTUAL | | Cement: | Sacks: 930, Top: 4980 ft., Bottom: 8652 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | GREEN RIVER | 916 ft. | | N | N | | DOUGLAS CREEK | 3868 ft. | | N | N | | WASATCH A | 6877 ft. | | N | N | | WASATCH B | 7025 ft. | | N | N | | WASATCH D | 7315 ft. | | N | N | | WASATCH F | 7643 ft. | | N | N | | WASATCH G | 7816 ft. | | N | N |
Formation WSTC Formation Classification: GW Status: AB - 9/30/2022 Interval Top: 7445 ft. Interval Bottom: 8537 ft.| Completed Information for Formation WASATCH | | 1st Production Date: | 2/8/2010 | Choke Size: | 0.188 in. | | Formation Name: | WASATCH | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 12/10/2009 | | Treatment Summary: | ACIDIZED WITH 5998 GALS 15% HCI ACID. FRACD WITH 253903 GALS 20# XL GEL AND 443839# 20/40 OTTAWA SD. |
| | Tubing Size: | 2.875 in. | Tubing Setting Depth: | 8538 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 2/14/2010 | Test Method: | PUMPING | | Hours Tested: | 24 | Gas Type: | COAL GAS | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 273 | | BTU_GAS | 1112 | | CALC_BBLS_H2O | 273 | | CALC_MCF_GAS | 106 | | CASING_PRESS | 240 | | MCF_GAS | 106 | | TUBING_PRESS | 241 |
| | Perforation Data: | | Interval Top: | 7445 ft. | # Of Holes: | 125 | | Interval Bottom: | 8537 ft. | Hole Size: | 0.34 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 09/30/2022 |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2029 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | Y |
|
|