Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-103-10961
Well Classification: OW Status: PR - 3/1/2024
Well Name/No:A.C.MCLAUGHLIN #44A
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:SCOUT ENERGY MANAGEMENT LLC - 10779
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:D 032675
Facility Status:PRStatus Date3/1/2024
FacilityID:288281LocationID:311854
County:RIO BLANCO #103Location:SESW 11 2N103W 6
Field:RANGELY - #72370Elevation:5587 ft.
Planned Location:773FSL  1834 FWLLat/Long: 40.152420 / -108.926420Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.152429 / -108.926356Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 3/1/2024             Measured TD: 6771 ft.    Vertical TD: 6759 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 3/1/2024
Wellbore PermitDIRECTIONAL
Permit #:20065336 Expiration Date:12/7/2007
Prop Depth/Form:6755 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit:RANGELY WEBR SD Unit Number:COC 47675X
Formation And Spacing:Code: WEBR , Formation: WEBER , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:7/25/2007
Spud Date:4/3/2007Spud Date Is:ACTUAL
Measured TD:6771 ft.Measured PB depth:6771 ft.
True Vertical TD:6759 ft.True Vertical PB depth:
Top PZ Location:Sec:11 Twp: 2N 103WFootage: 549 FSL  1745 FWLDepth
Bottom Hole Location:Sec:11 Twp: 2N 103WFootage: 549 FSL  1745 FWLDepth
Log Types:CBL; CPD/DN; AI/SFL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 2060 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 780, Top: 0 ft., Bottom: 2060 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 6650 ft., Weight: 23 , Citings Type: ACTUAL
Cement:Sacks: 660, Top: 0 ft., Bottom: 6650 ft., Determination Method: CALC
FormationInterval TopLog BottomCoredDSTs
DAKOTA3661 ft.NN
MORRISON3986 ft.NN
CURTIS4076 ft.NN
ENTRADA4822 ft.NN
CARMEL4920 ft.NN
NAVAJO5060 ft.NN
CHINLE5746 ft.NN
SHINARUMP5890 ft.NN
MOENKOPI5997 ft.NN
WEBER6638 ft.NN

Formation WEBR                     Formation Classification:  OW                     Status:  PR - 3/1/2024                  Interval Top: 6638 ft.

 Completed Information for Formation WEBER
1st Production Date:N/AChoke Size: 
Formation Name:WEBERCommingled:No
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Date:8/17/2007
Treatment Summary:PUMP SCALE INHIBITOR SQUEEZE 113 BBLS @ 13 BPM @ 785 PSI BRADENHEAD FRACTURE STIMULATION IN 7 STAGES PUMP TOTAL 10 825 GALLONS YF130ST FLUID WITH 103,000# 16/30 TEM AVERAGE 60 BPM @ 1249 PSI
Tubing Size:2.875 in.Tubing Setting Depth:6478 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/3/2007Test Method:VESSEL
Hours Tested:24Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 2415
BBLS_OIL 3
CALC_BBLS_H2O 2415
CALC_BBLS_OIL 3
CALC_GOR 333
CALC_MCF_GAS 1
GRAVITY_OIL 34
MCF_GAS 1
Perforation Data:
Interval Top:# Of Holes:
Interval Bottom:Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
August 2023 - July 2024i
Total Oil Produced (Barrels)25801
Total Gas Produced (MCF)0
GOR
GOR DeterminationBOE
Average BOE per Day70.207
Average MCFE per Day407.207

 Federal Financial Assurance  i Y

 Tribal Well  i No