|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: CBM Status: SI - 5/1/2025 Measured TD: 15265 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: CBM SI - 5/1/2025 | | Wellbore Permit | | | Permit #: | 20064514 | Expiration Date: | 10/4/2007 | | Proposed Depth/Form: | 15000 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEDERAL | Surface Owner: | FEDERAL | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: MVRD , Formation: MESAVERDE , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: WSTC , Formation: WASATCH , Order: , Unit Acreage: , Drill Unit: |
| | |
| Wellbore Completed | | Completion Date: | 12/21/2007 | | Spud Date: | 7/14/2007 | Spud Date Is: | ACTUAL | | Measured TD: | 15265 ft. | Measured PB depth: | 15214 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | GR/CCL | | Casing: | String Type: CONDUCTOR, Hole Size: 29 in., Size: 20 in., Top: 0 ft., Depth: 80 ft., Weight: 94 , Citings Type: ACTUAL | | Cement: | Sacks: 180, Top: 0 ft., Bottom: 80 ft., Determination Method: CALC | | Casing: | String Type: SURF, Hole Size: 17.5 in., Size: 10.75 in., Top: 0 ft., Depth: 3596 ft., Weight: 40.5 , Citings Type: ACTUAL | | Cement: | Sacks: 3550, Top: 5 ft., Bottom: 3596 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 9.875 in., Size: 7 in., Top: 0 ft., Depth: 9486 ft., Weight: 26 , Citings Type: ACTUAL | | Cement: | Sacks: 1153, Top: 1300 ft., Bottom: 9486 ft., Determination Method: CALC | | Casing: | String Type: 2ND, Hole Size: 6.125 in., Size: 4.5 in., Top: 0 ft., Depth: 15228 ft., Weight: 15.1 , Citings Type: ACTUAL | | Cement: | Sacks: 824, Top: 11790 ft., Bottom: 15265 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | WASATCH G | 6873 ft. | 9311 ft. | N | N | | OHIO CREEK | 9311 ft. | 9510 ft. | N | N | | WILLIAMS FORK | 9510 ft. | 13194 ft. | N | N | | CAMEO COAL | 13194 ft. | 13955 ft. | N | N | | ROLLINS | 13955 ft. | 14125 ft. | N | N | | COZZETTE | 14125 ft. | 14506 ft. | N | N | | CORCORAN | 14506 ft. | | N | N |
Formation CRCRN Formation Classification: GW Status: SI - 5/1/2025 Interval Top: 14515 ft. Interval Bottom: 15116 ft.| Completed Information for Formation CORCORAN | | 1st Production Date: | 8/27/2008 | Choke Size: | | | Formation Name: | CORCORAN | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 8/12/2008 | | Treatment Summary: | ACIDIZED W/72 BBL 15% HCL ACID. FRACD W/657321 GALS LINEAR GEL AND 295141# 30/60 SINTERLITE SD AND FLUSHED W/205 BBL LINEAR GEL. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CRCRN. |
| | Perforation Data: | | Interval Top: | 14515 ft. | # Of Holes: | 58 | | Interval Bottom: | 15116 ft. | Hole Size: | 0.32 in. |
|
Formation COZZ Formation Classification: GW Status: SI - 5/1/2025 Interval Top: 14202 ft. Interval Bottom: 14233 ft.| Completed Information for Formation COZZETTE | | 1st Production Date: | 8/27/2008 | Choke Size: | | | Formation Name: | COZZETTE | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 8/13/2008 | | Treatment Summary: | ACIDIZE W/36 BBL 15% HCL ACID. FRACD W/78876 GAL LINEAR GEL & 15702# 30/60 SINTERLITE SD AND FLUCHED W/229 BBLS LINER GEL. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation COZZ. |
| | Perforation Data: | | Interval Top: | 14202 ft. | # Of Holes: | 30 | | Interval Bottom: | 14233 ft. | Hole Size: | 0.32 in. |
|
Formation WFILS Formation Classification: GW Status: CM - 8/27/2008 Interval Top: 12952 ft. Interval Bottom: 15116 ft.| Completed Information for Formation WILLIAMS FORK-ILES | | 1st Production Date: | 8/27/2008 | Choke Size: | 0.344 in. | | Formation Name: | WILLIAMS FORK-ILES | Commingled: | No | | Production Method: | | | Open Hole Completion: | Yes |
| | Formation Treatment | | Treatment Date: | 8/10/2008 | | Treatment Summary: | FRAC'D W/ 1680 BBLS 15% HCI ACID; 1,109,178 GAL 20# LINEAR GEL; 560,324# 30/60 SINTERLITE & FLUSH W/ 1,196 BBLS LINEAR GEL. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 8/27/2008 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | COAL GAS | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 903 | | BTU_GAS | 967 | | CALC_BBLS_H2O | 903 | | CALC_BBLS_OIL | 0 | | CALC_MCF_GAS | 1225 | | CASING_PRESS | 2200 | | MCF_GAS | 1225 |
| | Perforation Data: | | Interval Top: | 12952 ft. | # Of Holes: | 208 | | Interval Bottom: | 15116 ft. | Hole Size: | 0.32 in. |
|
Formation WFCM Formation Classification: GW Status: SI - 8/1/2021 Interval Top: 12580 ft. Interval Bottom: 13298 ft.| Completed Information for Formation WILLIAMS FORK - CAMEO | | 1st Production Date: | 8/27/2008 | Choke Size: | | | Formation Name: | WILLIAMS FORK - CAMEO | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 8/15/2008 | | Treatment Summary: | ACIDIZED W/144 BBL 15% HCL ACID. FRACD W/800898 GALS LINEAR GEL AND 249481# 30/60 SINTERLITE SD AND FLUCHED W/761 BBL LINEAR GEL. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation WFCM. |
| | Perforation Data: | | Interval Top: | 12580 ft. | # Of Holes: | 120 | | Interval Bottom: | 13298 ft. | Hole Size: | 0.32 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | Y | Production Period 12/2024 - 11/2025 |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 100 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.047 |
| Average MCFE per Day | 0.278 |
| Federal Financial Assurance | i | Y |
|
|