|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 9/10/2007 Measured TD: 12161 ft. Vertical TD: 12122 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 9/10/2007 | | Wellbore Permit | DIRECTIONAL | | Permit #: | 20063350 | Expiration Date: | 8/29/2007 | | Proposed Top PZ Location: | Sec: Twp: | Footage: 1264 FNL 2155 FEL | | Bottom Hole Location: | Sec:13 Twp: 2S 97W | Footage: 1264 FNL 2115 FEL | | Proposed Depth/Form: | 13500 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEDERAL | Surface Owner: | FEDERAL | | Unit: | PICEANCE CRK UN | Unit Number: | COC 47666X | | Formation And Spacing: | Code: MVRD , Formation: MESAVERDE , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: OHCRK , Formation: OHIO CREEK , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: WSTC , Formation: WASATCH , Order: , Unit Acreage: , Drill Unit: |
| | |
| Wellbore Completed | | Completion Date: | 4/7/2007 | | Spud Date: | 2/22/2007 | Spud Date Is: | ACTUAL | | Measured TD: | 12161 ft. | Measured PB depth: | | | True Vertical TD: | 12122 ft. | True Vertical PB depth: | | | Top PZ Location: | Sec:13 Twp: 2S 97W | Footage: 1254 FNL 2137 FEL | | Bottom Hole Location: | Sec:13 Twp: 2S 97W | Footage: 1254 FNL 2137 FEL | | Log Types: | MUD LOGS, DIRECTIONAL SURVEYS, CBL-3 | | Casing: | String Type: CONDUCTOR, Hole Size: 20 in., Size: 16 in., Top: 0 ft., Depth: , Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 256, Top: 0 ft., Bottom: 176 ft., Determination Method: CALC | | Casing: | String Type: SURF, Hole Size: 14.75 in., Size: 10.75 in., Top: 0 ft., Depth: , Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 1090, Top: 1712 ft., Bottom: 4050 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 9.875 in., Size: 7 in., Top: 0 ft., Depth: , Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 793, Top: 5100 ft., Bottom: 8187 ft., Determination Method: CBL | | Casing: | String Type: 2ND, Hole Size: 6.125 in., Size: 4.5 in., Top: 0 ft., Depth: , Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 955, Top: 8187 ft., Bottom: 12161 ft., Determination Method: CALC | | Formation | Interval Top | Log Bottom | Cored | DSTs | | WASATCH G | 5448 ft. | 7304 ft. | N | N | | OHIO CREEK | 7304 ft. | 7492 ft. | N | N | | WILLIAMS FORK - CAMEO | 7492 ft. | 11542 ft. | N | N | | ROLLINS | 11542 ft. | 11740 ft. | N | N | | COZZETTE | 11740 ft. | 12051 ft. | N | N | | CORCORAN | 12051 ft. | 12161 ft. | N | N |
Formation COZZ Formation Classification: GW Status: PR - 9/10/2007 Interval Top: 11901 ft. Interval Bottom: 11904 ft.| Completed Information for Formation COZZETTE | | 1st Production Date: | 9/3/2007 | Choke Size: | 0.391 in. | | Formation Name: | COZZETTE | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 8/30/2007 | | Treatment Summary: | FRAC'D W/20,644# 40/70 PROPPANT. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 9/10/2007 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| CALC_BBLS_H2O | 58 | | CALC_BBLS_OIL | 0 | | CALC_GOR | 0 | | CALC_MCF_GAS | 207 | | CASING_PRESS | 2195 |
| | Perforation Data: | | Interval Top: | 11901 ft. | # Of Holes: | 10 | | Interval Bottom: | 11904 ft. | Hole Size: | 0.32 in. |
|
Formation WFCM Formation Classification: GW Status: PR - 9/10/2007 Interval Top: 9140 ft. Interval Bottom: 11403 ft.| Completed Information for Formation WILLIAMS FORK - CAMEO | | 1st Production Date: | 9/3/2007 | Choke Size: | 0.391 in. | | Formation Name: | WILLIAMS FORK - CAMEO | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 8/30/2007 | | Treatment Summary: | FRAC'D W/786,360# PROPPANT. SET FRAC PLUGS @ 11,057' & 9, 670'. DO ALL FRAC PLUGS. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 9/10/2007 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| CALC_BBLS_H2O | 749 | | CALC_BBLS_OIL | 0 | | CALC_GOR | 0 | | CALC_MCF_GAS | 2698 | | CASING_PRESS | 2195 |
| | Perforation Data: | | Interval Top: | 9140 ft. | # Of Holes: | 247 | | Interval Bottom: | 11403 ft. | Hole Size: | 0.32 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 113 |
| Total Gas Produced (MCF) | 39697 |
| GOR | 351300 |
| GOR Determination | MCFE |
| Average BOE per Day | 18.995 |
| Average MCFE per Day | 110.192 |
| Federal Financial Assurance | i | Y |
|
|