|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 1/1/2019 Measured TD: 13105 ft. Vertical TD: 12828 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 1/1/2019 | | Wellbore Permit | DIRECTIONAL | | Permit #: | 20073860 | Expiration Date: | 8/21/2008 | | Proposed Top PZ Location: | Sec: Twp: | Footage: 2073 FNL 1643 FEL | | Bottom Hole Location: | Sec:11 Twp: 2S 97W | Footage: 2073 FNL 1643 FEL | | Proposed Depth/Form: | 13500 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEDERAL | Surface Owner: | FEDERAL | | Unit: | PICEANCE CREEK | Unit Number: | COC-47666X | | Formation And Spacing: | Code: MVRD , Formation: MESAVERDE , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: OHCRK , Formation: OHIO CREEK , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: WSTC , Formation: WASATCH , Order: , Unit Acreage: , Drill Unit: |
| | |
| Wellbore Completed | | Completion Date: | 1/21/2009 | | Spud Date: | 4/5/2008 | Spud Date Is: | ACTUAL | | Measured TD: | 13105 ft. | Measured PB depth: | | | True Vertical TD: | 12828 ft. | True Vertical PB depth: | | | Top PZ Location: | Sec:11 Twp: 2S 97W | Footage: 2469 FNL 1567 FEL | | Bottom Hole Location: | Sec:11 Twp: 2S 97W | Footage: 2469 FNL 1567 FEL | | Log Types: | | | Log Types: | RA BOND LOG, RPM, GASVIEW, COMPACT WELL - SHUTTLE HOLE VOLUME, ARRAY INDUCT, ELECTRIC, COMP. SONIC COMPACT TRIPLE COMBO, COMP. PHOTO DENSITY, PERFORM DRILLING MECHANICS, IMAGING BEHIND CASING ULTRASONIC TOOL, DS, ML, PC TIME RUN | | Log Types: | | | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 120 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 96, Top: 0 ft., Bottom: 120 ft., Determination Method: CALC | | Casing: | String Type: SURF, Hole Size: 14.75 in., Size: 10.75 in., Top: 0 ft., Depth: 2088 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 1395, Top: 0 ft., Bottom: 2088 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 9.875 in., Size: 7.625 in., Top: 0 ft., Depth: 8993 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 670, Top: 6130 ft., Bottom: 8993 ft., Determination Method: CALC | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 4167 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 885, Top: 2088 ft., Bottom: 4167 ft., Determination Method: CALC | | Casing: | String Type: 2ND, Hole Size: 6.125 in., Size: 4.5 in., Top: 0 ft., Depth: 13084 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 955, Top: 6590 ft., Bottom: 13084 ft., Determination Method: CALC | | Casing: | String Type: S.C. 2.1, Hole Size: , Size: , Top: , Depth: 6130 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 490, Top: 3643 ft., Bottom: 6130 ft., Determination Method: CALC | | Casing: | String Type: 3RD, Hole Size: , Size: 7.625 in., Top: , Depth: , Weight: , Citings Type: ACTUAL | | Cement: | Sacks: , Top: , Bottom: , Determination Method: CALC | | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6590 ft., Depth: 13084 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 955, Top: 6590 ft., Bottom: 13084 ft., Determination Method: | | Formation | Interval Top | Log Bottom | Cored | DSTs | | WILLIAMS FORK | | | N | N | | WASATCH | | | N | N | | WASATCH G | 5740 ft. | 7590 ft. | N | N | | OHIO CREEK | 7590 ft. | 11500 ft. | N | N | | WILLIAMS FORK - CAMEO | 11500 ft. | 11780 ft. | N | N | | ROLLINS | 11780 ft. | 11970 ft. | N | N | | COZZETTE | 11970 ft. | 12290 ft. | N | N | | CORCORAN | 12290 ft. | 13105 ft. | N | N |
Formation CRCRN Formation Classification: GW Status: PR - 1/1/2019 Interval Top: 12354 ft. Interval Bottom: 12830 ft.| Completed Information for Formation CORCORAN | | 1st Production Date: | 6/9/2009 | Choke Size: | 0.188 in. | | Formation Name: | CORCORAN | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 5/22/2009 | | Treatment Summary: | FRAC'D W/ 572,100# 100 MESH & 2,646,000 40/70 API PROPPANT |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 6/10/2009 | Test Method: | FLOWING | | Hours Tested: | | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BTU_GAS | 1037 | | CALC_BBLS_H2O | 392 | | CALC_BBLS_OIL | 0 | | CALC_MCF_GAS | 2842 | | CASING_PRESS | 2473 |
| | Perforation Data: | | Interval Top: | 12354 ft. | # Of Holes: | 112 | | Interval Bottom: | 12830 ft. | Hole Size: | 0.32 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 59 |
| Total Gas Produced (MCF) | 28932 |
| GOR | 490372 |
| GOR Determination | MCFE |
| Average BOE per Day | 13.867 |
| Average MCFE per Day | 80.431 |
| Federal Financial Assurance | i | Y |
|
|