Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-103-10757
Well Classification: GW Status: PR - 4/9/2007
Well Name/No:FEDERAL RGU #22-20-198
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC62050
Facility Status:PRStatus Date4/9/2007
FacilityID:284729LocationID:316542
County:RIO BLANCO #103Location:SENW 20 1S98W 6
Field:SULPHUR CREEK - #80090Elevation:6506 ft.
Basin:PICEANCE BASIN  
Planned Location:1920FNL  1979 FWLLat/Long: 39.951293 / -108.417391Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.951392 / -108.417531Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 4/9/2007             Measured TD: 11404 ft.    Vertical TD: 11400 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 4/9/2007
Wellbore Permit
Permit #:20071890 Expiration Date:5/13/2008
Proposed Depth/Form:11330 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit:RYAN GULCH Unit Number:COC68239X
Formation And Spacing:Code: ILES , Formation: ILES , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: SEGO , Formation: SEGO , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: WFCM , Formation: WILLIAMS FORK - CAMEO , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: WSTC , Formation: WASATCH , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:3/22/2008
Spud Date:2/14/2008Spud Date Is:ACTUAL
Measured TD:11404 ft.Measured PB depth:11331 ft.
True Vertical TD:11400 ft.True Vertical PB depth:11327 ft.
Log Types:CBL; HIGH RESOLUTION INDUCTION, SPECTRAL DENSITY, DUAL SPACED NEUTRON; MUD
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: , Depth: 80 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 135, Top: 0 ft., Bottom: 80 ft., Determination Method:
Casing:String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 3682 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 2230, Top: 0 ft., Bottom: 3682 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 11361 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 1687, Top: 4760 ft., Bottom: 11361 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
MESAVERDE6905 ft.NN
CAMEO9739 ft.NN
ROLLINS10180 ft.NN
COZZETTE10285 ft.NN
CORCORAN10504 ft.NN
SEGO10884 ft.NN

Formation SEGO                     Formation Classification:  GW                     Status:  PR - 4/9/2007                  Interval Top: 10908 ft.    Interval Bottom: 11218 ft.

 Completed Information for Formation SEGO
1st Production Date:4/18/2008Choke Size: 
Formation Name:SEGOCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:4/10/2008
Treatment Summary:1202 GALS 10% HCL ACID; 176,100# 30/50 SAND; 5888 BBLS SLICKWATER
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation SEGO.
Perforation Data:
Interval Top:10908 ft.# Of Holes:26
Interval Bottom:11218 ft.Hole Size:0.36 in.

Formation CRCRN                   Formation Classification:  GW                   Status:  PR - 4/9/2007                  Interval Top: 10523 ft.    Interval Bottom: 10723 ft.

 Completed Information for Formation CORCORAN
1st Production Date:4/18/2008Choke Size: 
Formation Name:CORCORANCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:4/14/2008
Treatment Summary:480 GALS 10% HCL ACID, 51,00# 30/50 SAND, 1734 BBLS SLICKWATER
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CRCRN.
Perforation Data:
Interval Top:10523 ft.# Of Holes:10
Interval Bottom:10723 ft.Hole Size:0.36 in.

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 4/9/2007                  Interval Top: 8653 ft.    Interval Bottom: 10086 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:4/18/2008Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:4/14/2008
Treatment Summary:4845 GALS 10% HCL ACID; 550,200# 30/50 SAND; 19,855 BBLS SLICKWATER
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation WFCM.
Perforation Data:
Interval Top:8653 ft.# Of Holes:112
Interval Bottom:10086 ft.Hole Size:0.36 in.

Formation WFILS                   Formation Classification:  GW                   Status:  CM - 4/25/2008                 Interval Top: 8653 ft.    Interval Bottom: 11218 ft.

 Completed Information for Formation WILLIAMS FORK-ILES
1st Production Date:4/18/2008Choke Size:0.313 in.
Formation Name:WILLIAMS FORK-ILESCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:4/10/2008
Treatment Summary:6527 GALS 10% HCL ACID; 777,300# 30/50 SAND; 27,477 BBLS SLICKWATER
Tubing Size:2.375 in.Tubing Setting Depth:11132 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/25/2008Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BTU_GAS 1170
CALC_BBLS_H2O 0
CALC_MCF_GAS 2600
CASING_PRESS 2850
MCF_GAS 2600
TUBING_PRESS 1950
Perforation Data:
Interval Top:8653 ft.# Of Holes:148
Interval Bottom:11218 ft.Hole Size:0.36 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
November 2024 - October 2025i
Total Oil Produced (Barrels)215
Total Gas Produced (MCF)19631
GOR91306
GOR DeterminationMCFE
Average BOE per Day9.859
Average MCFE per Day57.215

 Federal Financial Assurance  i Y

 Tribal Well  i No