|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: SI - 12/1/2025 Measured TD: 9740 ft. Vertical TD: 9508 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW SI - 12/1/2025 | | Wellbore Permit | DIRECTIONAL | | Permit #: | 20060735 | Expiration Date: | 4/10/2007 | | Proposed Top PZ Location: | Sec: Twp: | Footage: 1980 FNL 330 FEL | | Bottom Hole Location: | Sec:16 Twp: 4S 98W | Footage: 1980 FNL 330 FEL | | Proposed Depth/Form: | 10039 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEDERAL | Surface Owner: | FEDERAL | | Unit: | FIGURE FOUR UNI | Unit Number: | C 66492A | | Formation And Spacing: | Code: ILES , Formation: ILES , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: OHCRK , Formation: OHIO CREEK , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: WMFK , Formation: WILLIAMS FORK , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: WSTC , Formation: WASATCH , Order: , Unit Acreage: , Drill Unit: |
| | |
| Wellbore Completed | | Completion Date: | 7/9/2006 | | Spud Date: | 6/14/2006 | Spud Date Is: | ACTUAL | | Measured TD: | 9740 ft. | Measured PB depth: | 9534 ft. | | True Vertical TD: | 9508 ft. | True Vertical PB depth: | | | Top PZ Location: | Sec:16 Twp: 4S 98W | Footage: 1805 FNL 222 FEL | | Bottom Hole Location: | Sec:16 Twp: 4S 98W | Footage: 1805 FNL 222 FEL | | Log Types: | CBL, MUD | | Casing: | String Type: CONDUCTOR, Hole Size: 32 in., Size: 20 in., Top: 0 ft., Depth: 137 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: , Top: 0 ft., Bottom: 137 ft., Determination Method: CALC | | Casing: | String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 2570 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 824, Top: 1216 ft., Bottom: 2590 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 9700 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 765, Top: 5174 ft., Bottom: 9740 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 1216 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 710, Top: 0 ft., Bottom: 1216 ft., Determination Method: CALC | | Casing: | String Type: S.C. 1.2, Hole Size: , Size: , Top: , Depth: 5174 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 585, Top: 1732 ft., Bottom: 5174 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | WILLIAMS FORK | 5259 ft. | 8585 ft. | N | N | | ROLLINS | 8585 ft. | 8716 ft. | N | N | | COZZETTE | 8716 ft. | 8890 ft. | N | N | | CORCORAN | 8890 ft. | 9175 ft. | N | N | | SEGO | 9175 ft. | | N | N |
Formation SEGO Formation Classification: GW Status: SI - 12/1/2025 Interval Top: 9192 ft. Interval Bottom: 9493 ft.| Completed Information for Formation SEGO | | 1st Production Date: | 12/6/2006 | Choke Size: | | | Formation Name: | SEGO | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 11/1/2006 | | Treatment Summary: | STAGES 01 TREATED WITH A TOTAL OF 4429 BBLS OF SLICKWATER WITH 181015 LBS 20-40 SAND. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7815 ft. | | Tubing Packer Depth: | 6399 ft. | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BTU_GAS | 1170 |
| | Perforation Data: | | Interval Top: | 9192 ft. | # Of Holes: | 21 | | Interval Bottom: | 9493 ft. | Hole Size: | 0.42 in. |
|
Formation WMFK Formation Classification: GW Status: SI - 12/1/2025 Interval Top: 5684 ft. Interval Bottom: 8495 ft.| Completed Information for Formation WILLIAMS FORK | | 1st Production Date: | 12/6/2006 | Choke Size: | 0.344 in. | | Formation Name: | WILLIAMS FORK | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 11/1/2006 | | Treatment Summary: | STAGES 02-09 TREATED WITH A TOTAL OF 43930 BBLS OF SLICKWATER WITH 1853417 LBS 20-40 SAND. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7815 ft. | | Tubing Packer Depth: | 6399 ft. | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 12/12/2006 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BTU_GAS | 1170 | | CALC_BBLS_H2O | 0 | | CALC_BBLS_OIL | 0 | | CALC_GOR | 0 | | CALC_MCF_GAS | 479 | | CASING_PRESS | 1547 | | MCF_GAS | 479 | | TUBING_PRESS | 707 |
| | Perforation Data: | | Interval Top: | 5684 ft. | # Of Holes: | 207 | | Interval Bottom: | 8495 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | Y | Production Period 12/2024 - 11/2025 |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 978 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.458 |
| Average MCFE per Day | 2.682 |
| Federal Financial Assurance | i | Y |
|
|