|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: SI - 5/1/2024 Measured TD: 12765 ft. Vertical TD: 12631 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW SI - 5/1/2024 | Wellbore Permit | DIRECTIONAL | Permit #: | 20081638 | Expiration Date: | 4/29/2009 | Prop Depth/Form: | 13500 ft. | Surface Mineral Owner Same: | Yes | Mineral Owner: | FEDERAL | Surface Owner: | FEDERAL | Unit: | PICEANCE CREEK | Unit Number: | COC47666X | Formation And Spacing: | Code: MVRD , Formation: MESAVERDE , Order: , Unit Acreage: , Drill Unit: | Formation And Spacing: | Code: OHCRK , Formation: OHIO CREEK , Order: , Unit Acreage: , Drill Unit: | Formation And Spacing: | Code: WSTC , Formation: WASATCH , Order: , Unit Acreage: , Drill Unit: |
| | |
Wellbore Completed | Completion Date: | 1/29/2009 | Spud Date: | 1/4/2009 | Spud Date Is: | ACTUAL | Measured TD: | 12765 ft. | Measured PB depth: | | True Vertical TD: | 12631 ft. | True Vertical PB depth: | | Top PZ Location: | Sec:10 Twp: 2S 97W | Footage: 680 FSL 2175 FEL | Depth | Bottom Hole Location: | Sec:10 Twp: 2S 97W | Footage: 680 FSL 2175 FEL | Depth | Log Types: | | Log Types: | RADIAL ANALYSIS BOND, RPM, GASVIEW, MUD (4), ULTRASONIC IMAGING TOOL CEMNT EVAL., PERFORM-DRILLING MECHANICS, DIRECTIONAL SURVEY | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 93 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 96, Top: 0 ft., Bottom: 93 ft., Determination Method: CALC | Casing: | String Type: SURF, Hole Size: 14.75 in., Size: 10.75 in., Top: 0 ft., Depth: 3735 ft., Weight: 45.5 , Citings Type: ACTUAL | Cement: | Sacks: 1090, Top: 1263 ft., Bottom: 3735 ft., Determination Method: CALC | Casing: | String Type: 1ST, Hole Size: 9.875 in., Size: 7.625 in., Top: 0 ft., Depth: 8498 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 1045, Top: 5700 ft., Bottom: 8498 ft., Determination Method: CALC | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 1263 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 645, Top: 0 ft., Bottom: 1263 ft., Determination Method: | Casing: | String Type: 2ND, Hole Size: 6.125 in., Size: 4.5 in., Top: 0 ft., Depth: 12751 ft., Weight: 15.1 , Citings Type: ACTUAL | Cement: | Sacks: 915, Top: 6010 ft., Bottom: 12751 ft., Determination Method: CBL | Casing: | String Type: 3RD, Hole Size: , Size: 4.5 in., Top: , Depth: , Weight: , Citings Type: ACTUAL | Cement: | Sacks: , Top: , Bottom: , Determination Method: CALC | Formation | Interval Top | Log Bottom | Cored | DSTs | WASATCH G | 5326 ft. | 7126 ft. | N | N | OHIO CREEK | 7126 ft. | 7364 ft. | N | N | WILLIAMS FORK - CAMEO | 7364 ft. | 11450 ft. | N | N | ROLLINS | 11450 ft. | 11685 ft. | N | N | COZZETTE | 11685 ft. | 11972 ft. | N | N | CORCORAN | 11972 ft. | 12765 ft. | N | N |
Formation CRCRN Formation Classification: GW Status: SI - 5/1/2024 Interval Top: 12248 ft. Interval Bottom: 12502 ft. Completed Information for Formation CORCORAN | 1st Production Date: | 4/26/2009 | Choke Size: | 0.375 in. | Formation Name: | CORCORAN | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 4/17/2009 | Treatment Summary: | FRACED W/46,427 100# MESH AND 209,473# 40/70 API PROPPANT. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 5/11/2009 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | WET | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BTU_GAS | 1057 | CALC_BBLS_H2O | 188 | CALC_BBLS_OIL | 0 | CALC_GOR | 0 | CALC_MCF_GAS | 423 | CASING_PRESS | 2596 |
| Perforation Data: | Interval Top: | 12248 ft. | # Of Holes: | 80 | Interval Bottom: | 12502 ft. | Hole Size: | 0.32 in. |
|
Formation COZZ Formation Classification: GW Status: SI - 5/1/2024 Interval Top: 11470 ft. Interval Bottom: 11986 ft. Completed Information for Formation COZZETTE | 1st Production Date: | 4/26/2009 | Choke Size: | 0.375 in. | Formation Name: | COZZETTE | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 4/18/2009 | Treatment Summary: | FRACED W/52,418# 100 MESH AND 227,282# 40/70 API PROPPANT. SET FRAC PLUG @ 11,830 FT. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 5/11/2009 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | WET | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BTU_GAS | 1057 | CALC_BBLS_H2O | 165 | CALC_BBLS_OIL | 0 | CALC_GOR | 0 | CALC_MCF_GAS | 372 | CASING_PRESS | 2596 |
| Perforation Data: | Interval Top: | 11470 ft. | # Of Holes: | 96 | Interval Bottom: | 11986 ft. | Hole Size: | 0.32 in. |
|
Formation RLNS Formation Classification: GW Status: SI - 5/1/2024 Interval Top: 11346 ft. Interval Bottom: 11350 ft. Completed Information for Formation ROLLINS | 1st Production Date: | 4/26/2009 | Choke Size: | 0.375 in. | Formation Name: | ROLLINS | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 4/20/2009 | Treatment Summary: | FRACED W/11,981# 100 MESH AND 54,619# 40/70 API PROPPANT. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 5/11/2009 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | WET | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BTU_GAS | 1057 | CALC_BBLS_H2O | 49 | CALC_BBLS_OIL | 0 | CALC_GOR | 0 | CALC_MCF_GAS | 109 | CASING_PRESS | 2596 |
| Perforation Data: | Interval Top: | 11346 ft. | # Of Holes: | 16 | Interval Bottom: | 11350 ft. | Hole Size: | 0.32 in. |
|
Formation WFCM Formation Classification: GW Status: SI - 5/1/2024 Interval Top: 8836 ft. Interval Bottom: 11046 ft. Completed Information for Formation WILLIAMS FORK - CAMEO | 1st Production Date: | 4/26/2009 | Choke Size: | 0.375 in. | Formation Name: | WILLIAMS FORK - CAMEO | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 4/20/2009 | Treatment Summary: | FRACED W/302,527# 100 MESH AND 1,317,773# 40/70 API PROPPANT. SET FRAC PLUG @ 9,050, 9,355, 9,730, 9,900, 10,620 & 10,940 FT. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 5/11/2009 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | WET | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BTU_GAS | 1057 | CALC_BBLS_H2O | 949 | CALC_BBLS_OIL | 0 | CALC_GOR | 0 | CALC_MCF_GAS | 2136 | CASING_PRESS | 2596 |
| Perforation Data: | Interval Top: | 8836 ft. | # Of Holes: | 480 | Interval Bottom: | 11046 ft. | Hole Size: | 0.32 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | Y | Production Period 06/2023 - 05/2024 |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 1527 |
GOR | |
GOR Determination | MCFE |
Average BOE per Day | 0.722 |
Average MCFE per Day | 4.175 |
Federal Financial Assurance | i | Y |
|
|