Formation Treatment |
Treatment Type: | ACID JOB |
Treatment Date: | 4/25/2023 | Treatment End Date: | 4/25/2023 |
Treatment Summary: | PUMPED 640 gallons (15.2 BBLS) of 15% HCL, 104 gallons (2.4 BBLS) Acroline and 290 BBLS Fresh water. |
Total fluid used in treatment (bbls): | 307 | Max pressure during treatment (psi): | 2500 |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | 17 | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | 290 | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: |
Formation Treatment |
Treatment Type: | ACID JOB |
Treatment Date: | 5/18/2022 | Treatment End Date: | 5/18/2022 |
Treatment Summary: | PUMPED 4000 GALLONS (95.2 BBLS) 15% HCL WITH MUTUAL SOLVENT AND 35 BBLS WATER. |
Total fluid used in treatment (bbls): | 130 | Max pressure during treatment (psi): | 2400 |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | 95 | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | 35 | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: |
Formation Treatment |
Treatment Type: | ACID JOB |
Treatment Date: | 2/8/2021 | Treatment End Date: | 2/8/2021 |
Treatment Summary: | PUMPED 2000 GALLONS (47.6 BBLS) 15% HCL WITH MUTUAL SOLVENT AND 48 BBLS WATER. |
Total fluid used in treatment (bbls): | 96 | Max pressure during treatment (psi): | 2340 |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | 48 | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | 48 | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: |
Formation Treatment |
Treatment Type: | ACID JOB |
Treatment Date: | 8/5/2020 | Treatment End Date: | 8/5/2020 |
Treatment Summary: | PUMPED 4000 GALLONS (95.2 BBLS) 15% HCL W/SOLVENT, 50 BBLS WATER |
Total fluid used in treatment (bbls): | 145 | Max pressure during treatment (psi): | 2200 |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | 95 | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | 50 | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: |
Formation Treatment |
Treatment Type: | ACID JOB |
Treatment Date: | 11/7/2019 | Treatment End Date: | 11/7/2019 |
Treatment Summary: | PUMPED 2000 GALLONS (47.6 BBLS) 15% HCL, 38.0 BBLS FRESH WATER |
Total fluid used in treatment (bbls): | 85 | Max pressure during treatment (psi): | 2250 |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | 47 | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | 38 | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: |
Formation Treatment |
Treatment Type: | ACID JOB |
Treatment Date: | 5/14/2014 | Treatment End Date: | 5/14/2014 |
Treatment Summary: | ACID STIMULATION |
Total fluid used in treatment (bbls): | 170 | Max pressure during treatment (psi): | 1900 |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | 95 | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | 75 | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: |
Formation Treatment |
Treatment Date: | 8/17/2010 |
Treatment Summary: | acid stimulation 8/17/10 pumped 4000 gal 20% HCL through end of coil tubing 6506' at starting pressure of 1000psi. |
Formation Treatment |
Treatment Date: | 8/18/2006 |
Treatment Summary: | |