| Formation Treatment |
| Treatment Type: | ACID JOB |
| Treatment Date: | 10/14/2024 | Treatment End Date: | 10/14/2024 |
| Treatment Summary: | PUMPED 2000 GALLONS (47.6 BBLS) 15% HCL WITH 35 BBLS FRESH WATER |
| Total fluid used in treatment (bbls): | 82 | Max pressure during treatment (psi): | 2150 |
| Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
| Type Of gas: | | Number Of staged intervals: | |
| Total acid used in treatment (bbls): | 47 | Min frac gradient (psi/ft): | |
| Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | |
| Fresh water used in treatment (bbls): | 35 | Disposition method For flowback: | |
| Total proppant used (lbs): | | Green completions techniques utilized: | -- |
| Reason green techniques Not utilized: |
| Formation Treatment |
| Treatment Type: | ACID JOB |
| Treatment Date: | 11/19/2021 | Treatment End Date: | 11/19/2021 |
| Treatment Summary: | PUMPED 4000 GALLONS (95.2 BBLS) 15% HCL WITH SOLVENT AND 58 BBLS FRESH WATER |
| Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | 2400 |
| Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
| Type Of gas: | | Number Of staged intervals: | |
| Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | |
| Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
| Fresh water used in treatment (bbls): | 58 | Disposition method For flowback: | |
| Total proppant used (lbs): | | Green completions techniques utilized: | -- |
| Reason green techniques Not utilized: |
| Formation Treatment |
| Treatment Date: | 9/11/2009 |
| Treatment Summary: | ACID STIMULATION 09/11/2009 PUMPED 3990 GALLONS OF 20% HCI, THROUGH END OF TUBING AT 6465'. AVERAGE 1 BPM @ 2150 PSI. OPEN HOLE 6455-6582 |