|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: SI - 10/1/2025 Measured TD: 12807 ft. Vertical TD: 12730 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW SI - 10/1/2025 | | Wellbore Permit | DIRECTIONAL | | Permit #: | 20060327 | Expiration Date: | 3/14/2007 | | Proposed Top PZ Location: | Sec: Twp: | Footage: 1758 FSL 733 FEL | | Bottom Hole Location: | Sec:3 Twp: 2S 97W | Footage: 1758 FSL 733 FEL | | Proposed Depth/Form: | 13300 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEDERAL | Surface Owner: | FEDERAL | | Unit: | PICEANCE CREEK | Unit Number: | COC 47666X | | Formation And Spacing: | Code: MVRD , Formation: MESAVERDE , Order: , Unit Acreage: 20, Drill Unit: | | Formation And Spacing: | Code: OHCRK , Formation: OHIO CREEK , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: WSTC , Formation: WASATCH , Order: , Unit Acreage: 20, Drill Unit: |
| | |
| Wellbore Completed | | Completion Date: | 11/5/2006 | | Spud Date: | 10/3/2006 | Spud Date Is: | ACTUAL | | Measured TD: | 12807 ft. | Measured PB depth: | | | True Vertical TD: | 12730 ft. | True Vertical PB depth: | | | Top PZ Location: | Sec: Twp: | Footage: 1758 FSL 733 FEL | | Bottom Hole Location: | Sec: Twp: | Footage: FL FL | | Log Types: | CBL/GR/CCL (2 INTERVALS); MUDLOG (2 SCALES) | | Casing: | String Type: CONDUCTOR, Hole Size: , Size: , Top: 0 ft., Depth: 177 ft., Weight: 84 , Citings Type: ACTUAL | | Cement: | Sacks: 150, Top: 0 ft., Bottom: 177 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 14.75 in., Size: 10.75 in., Top: 0 ft., Depth: 3769 ft., Weight: 45.50 , Citings Type: ACTUAL | | Cement: | Sacks: 1233, Top: 1706 ft., Bottom: 3769 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 9.875 in., Size: , Top: 0 ft., Depth: 8550 ft., Weight: 26 , Citings Type: ACTUAL | | Cement: | Sacks: 1335, Top: 5400 ft., Bottom: 8550 ft., Determination Method: CALC | | Casing: | String Type: S.C. 1.2, Hole Size: , Size: , Top: , Depth: 5400 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 805, Top: 2450 ft., Bottom: 5400 ft., Determination Method: CBL | | Casing: | String Type: 2ND, Hole Size: 6.125 in., Size: 4.5 in., Top: 0 ft., Depth: 12803 ft., Weight: 15.10 , Citings Type: ACTUAL | | Cement: | Sacks: 665, Top: 7850 ft., Bottom: 12803 ft., Determination Method: CBL | | Casing: | String Type: STAGE TOOL, Hole Size: , Size: 10.75 in., Top: , Depth: 1706 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 1233, Top: 0 ft., Bottom: 1706 ft., Determination Method: VISU | | Formation | Interval Top | Log Bottom | Cored | DSTs | | WASATCH G | 5448 ft. | 7285 ft. | N | N | | OHIO CREEK | 7285 ft. | 7638 ft. | N | N | | WILLIAMS FORK - CAMEO | 7638 ft. | 11470 ft. | N | N | | ROLLINS | 11470 ft. | 11676 ft. | N | N | | COZZETTE | 11676 ft. | 11956 ft. | N | N | | CORCORAN | 11956 ft. | 12760 ft. | N | N |
Formation CRCRN Formation Classification: GW Status: SI - 10/1/2025 Interval Top: 11957 ft. Interval Bottom: 12537 ft.| Completed Information for Formation CORCORAN | | 1st Production Date: | 5/20/2007 | Choke Size: | 0.250 in. | | Formation Name: | CORCORAN | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 5/16/2007 | | Treatment Summary: | FRAC PERFS W/281,600# 40/70 API PROPPANT. FRAC PLUG SET ! 11,979'. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 5/31/2007 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| CALC_BBLS_H2O | 104 | | CALC_MCF_GAS | 615 | | CASING_PRESS | 2553 |
| | Perforation Data: | | Interval Top: | 11957 ft. | # Of Holes: | 72 | | Interval Bottom: | 12537 ft. | Hole Size: | 0.32 in. |
|
Formation COZZ Formation Classification: GW Status: SI - 10/1/2025 Interval Top: 11752 ft. Interval Bottom: 11820 ft.| Completed Information for Formation COZZETTE | | 1st Production Date: | 5/20/2007 | Choke Size: | 0.250 in. | | Formation Name: | COZZETTE | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 5/16/2007 | | Treatment Summary: | FRAC PERFS W/117,500# 40/70 API PROPPANT. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 5/31/2007 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| CALC_BBLS_H2O | 36 | | CALC_MCF_GAS | 214 | | CASING_PRESS | 2553 |
| | Perforation Data: | | Interval Top: | 11752 ft. | # Of Holes: | 24 | | Interval Bottom: | 11820 ft. | Hole Size: | 0.32 in. |
|
Formation RLNS Formation Classification: GW Status: SI - 11/1/2023 Interval Top: 11664 ft. Interval Bottom: 11667 ft.| Completed Information for Formation ROLLINS | | 1st Production Date: | 5/20/2007 | Choke Size: | 0.250 in. | | Formation Name: | ROLLINS | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 5/16/2007 | | Treatment Summary: | FRAC PERFS W/61,800# 40/70 API PROPPANT. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 5/31/2007 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| CALC_BBLS_H2O | 27 | | CALC_MCF_GAS | 158 | | CASING_PRESS | 2553 |
| | Perforation Data: | | Interval Top: | 11664 ft. | # Of Holes: | 12 | | Interval Bottom: | 11667 ft. | Hole Size: | 0.32 in. |
|
Formation WFCM Formation Classification: GW Status: SI - 10/1/2025 Interval Top: 8232 ft. Interval Bottom: 11420 ft.| Completed Information for Formation WILLIAMS FORK - CAMEO | | 1st Production Date: | 5/20/2007 | Choke Size: | 0.250 in. | | Formation Name: | WILLIAMS FORK - CAMEO | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 5/16/2007 | | Treatment Summary: | FRAC PERFS W/ 1,343,900# 40/70 API PROPPANT. SET FRAC PLUGS @ 11,315'. 11,100', 9,970' & 9,130'. DO ALL FRAC PLUGS. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 5/31/2007 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| CALC_BBLS_H2O | 495 | | CALC_MCF_GAS | 2933 | | CASING_PRESS | 2553 |
| | Perforation Data: | | Interval Top: | 8232 ft. | # Of Holes: | 384 | | Interval Bottom: | 11420 ft. | Hole Size: | 0.32 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | Y | Production Period 11/2024 - 10/2025 |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 254 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.122 |
| Average MCFE per Day | 0.706 |
| Federal Financial Assurance | i | Y |
|
|