Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-103-10699
Well Classification: OW Status: PR - 4/1/2019
Well Name/No:A.C. MCLAUGHLIN #90X
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:SCOUT ENERGY MANAGEMENT LLC - 10779
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:D032675
Facility Status:PRStatus Date4/1/2019
FacilityID:283388LocationID:316512
County:RIO BLANCO #103Location:SWSW 11 2N103W 6
Field:RANGELY - #72370Elevation:5536 ft.
Planned Location:76FSL  896 FWLLat/Long: 40.150510 / -108.929780Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.150527 / -108.929799Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 4/1/2019             Measured TD: 6741 ft.    Vertical TD: 6715 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 4/1/2019
Wellbore Permit
Permit #:20070698 Expiration Date:3/18/2008
Prop Depth/Form:6836 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit:RANGLELY WEBER Unit Number:COC47675X
Formation And Spacing:Code: WEBR , Formation: WEBER , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:4/18/2007
Spud Date:3/19/2007Spud Date Is:ACTUAL
Measured TD:6741 ft.Measured PB depth:6741 ft.
True Vertical TD:6715 ft.True Vertical PB depth:
Top PZ Location:Sec:14 Twp: 2N 103WFootage: 212 FNL  1298 FWLDepth
Bottom Hole Location:Sec:14 Twp: 2N 103WFootage: 212 FNL  1298 FWLDepth
Log Types:CBL; CPHOTOD/CDN; AI-SFL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 2061 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 880, Top: 0 ft., Bottom: 2092 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 6551 ft., Weight: 23 , Citings Type: ACTUAL
Cement:Sacks: 630, Top: 2300 ft., Bottom: 6570 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
DAKOTA3925 ft.NN
MORRISON4018 ft.NN
CURTIS4738 ft.NN
ENTRADA4842 ft.NN
CARMEL4991 ft.NN
NAVAJO5035 ft.NN
CHINLE5677 ft.NN
SHINARUMP5808 ft.NN
MOENKOPI5924 ft.NN
WEBER6565 ft.NN

Formation WEBR                     Formation Classification:  OW                     Status:  PR - 4/1/2019                  Interval Top: 6565 ft.

 Completed Information for Formation WEBER
1st Production Date:N/AChoke Size: 
Formation Name:WEBERCommingled:No
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Date:5/10/2007
Treatment Summary:OPEN HOLE:6570-6741. FRACTURE STIMULATE, PUMP 5124 GALS SCALE INHIBITOR @8 BPM 834 PSI, PUMP 26,880 SPACER@ 58.4 BPM 1186 PSI, PUMP TOTAL 23,500 GALS YF130ST W/ 16/30 RC SANS IN 5 STAGES @ 58.4 BPM AVERAGE 1262 PSI
Tubing Size:2.875 in.Tubing Setting Depth:6436 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:5/23/2007Test Method:TEST VESSEL
Hours Tested:24Gas Type:
Gas Disposal:RE-INJECTED
Test TypeMeasure
BBLS_H2O 1609
BBLS_OIL 56
CALC_BBLS_H2O 1608
CALC_BBLS_OIL 56
CALC_GOR 7804
CALC_MCF_GAS 437
GRAVITY_OIL 34
MCF_GAS 437
Perforation Data:
Interval Top:# Of Holes:
Interval Bottom:Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
June 2023 - May 2024i
Total Oil Produced (Barrels)9387
Total Gas Produced (MCF)0
GOR
GOR DeterminationBOE
Average BOE per Day25.685
Average MCFE per Day148.969

 Federal Financial Assurance  i Y

 Tribal Well  i No