Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-103-10633
Well Classification: GW Status: PR - 1/1/2020
Well Name/No:FEDERAL RGU #31-30-198
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC 60730
Facility Status:PRStatus Date1/1/2020
FacilityID:280058LocationID:316487
County:RIO BLANCO #103Location:NWNE 30 1S98W 6
Field:SULPHUR CREEK - #80090Elevation:6510 ft.
Basin:PICEANCE BASIN  
Planned Location:825FNL  1980 FELLat/Long: 39.939770 / -108.431571Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.939851 / -108.431660Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 1/1/2020             Measured TD: 10841 ft.    Vertical TD: 10824 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 1/1/2020
Wellbore Permit
Permit #:20052882 Expiration Date:9/15/2006
Proposed Depth/Form:10730 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit:RYAN GULCH UNIT Unit Number:COC 68239X
Formation And Spacing:Code: SEGO , Formation: SEGO , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:6/9/2006
Spud Date:4/21/2006Spud Date Is:ACTUAL
Measured TD:10841 ft.Measured PB depth:10758 ft.
True Vertical TD:10824 ft.True Vertical PB depth:
Top PZ Location:Sec:30 Twp: 1S 98WFootage: 1004 FNL  2241 FEL
Bottom Hole Location:Sec:30 Twp: 1S 98WFootage: 1004 FNL  2241 FEL
Log Types:CBL; HIGH RESOLUTION INDUCTION/SPECTRAL DENSITY/DUAL SPACED NEUTRON; MUDLOG
Casing:String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 3528 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 2040, Top: 0 ft., Bottom: 3528 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 10831 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 1670, Top: 5030 ft., Bottom: 10831 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G4647 ft.NN
FORT UNION4926 ft.NN
MESAVERDE6429 ft.NN
CAMEO9149 ft.NN
ROLLINS9608 ft.NN
COZZETTE9710 ft.NN
CORCORAN9921 ft.NN
SEGO10300 ft.NN

Formation SEGO                     Formation Classification:  GW                     Status:  SI - 9/1/2025                  Interval Top: 10343 ft.    Interval Bottom: 10671 ft.

 Completed Information for Formation SEGO
1st Production Date:6/24/2006Choke Size: 
Formation Name:SEGOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:6/19/2006
Treatment Summary:1250 GALS 10% HCL ACID; 174,800# 20/40 SAND; 4479 BBLS SLICKWATER.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation SEGO.
Perforation Data:
Interval Top:10343 ft.# Of Holes:38
Interval Bottom:10671 ft.Hole Size:0.42 in.

Formation CZ-CR                   Formation Classification:  GW                   Status:  CM - 6/9/2011                  Interval Top: 9746 ft.    Interval Bottom: 10307 ft.

 Completed Information for Formation COZZETTE-CORCORAN
1st Production Date:6/24/2006Choke Size: 
Formation Name:COZZETTE-CORCORANCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:6/19/2006
Treatment Summary:1500 GALS 10% HCL ACID; 154,600# 20/40 SAND; 4456 BBLS SLICKWATER
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CZ-CR.
Perforation Data:
Interval Top:9746 ft.# Of Holes:51
Interval Bottom:10307 ft.Hole Size:0.42 in.

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 1/1/2020                  Interval Top: 7546 ft.    Interval Bottom: 9572 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:9/3/2006Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:8/24/2006
Treatment Summary:5250 GALS 7.5% HCL ACID; 551,995# 20/40 SAND; 13,455 BBLS SLICKWATER
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation WFCM.
Perforation Data:
Interval Top:7546 ft.# Of Holes:130
Interval Bottom:9572 ft.Hole Size:0.42 in.

Formation WFILS                   Formation Classification:  GW                   Status:  CM - 9/13/2006                 Interval Top: 7546 ft.    Interval Bottom: 10671 ft.

 Completed Information for Formation WILLIAMS FORK-ILES
1st Production Date:6/24/2006Choke Size:0.375 in.
Formation Name:WILLIAMS FORK-ILESCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:6/19/2006
Treatment Summary:2750 GALS 10% HCL ACID, 5250 GALS 7.5% HCL ACID; 881,395# 20/40 SAND; 22,390 BBLS SLICKWATER (SUMARY)
Tubing Size:2.375 in.Tubing Setting Depth:9712 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/13/2006Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
CASING_PRESS 1741
MCF_GAS 1238
TUBING_PRESS 1626
Perforation Data:
Interval Top:7546 ft.# Of Holes:219
Interval Bottom:10671 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
November 2024 - October 2025i
Total Oil Produced (Barrels)124
Total Gas Produced (MCF)10241
GOR82588
GOR DeterminationMCFE
Average BOE per Day5.179
Average MCFE per Day30.064

 Federal Financial Assurance  i Y

 Tribal Well  i No