Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-103-10620
Well Classification: GW Status: PR - 1/1/2021
Well Name/No:FEDERAL #399-2-1
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC 060759
Facility Status:PRStatus Date1/1/2021
FacilityID:279219LocationID:316484
County:RIO BLANCO #103Location:SESE 2 3S99W 6
Field:SULPHUR CREEK - #80090Elevation:7343 ft.
Basin:PICEANCE BASIN  
Planned Location:660FSL  660 FELLat/Long: 39.812372 / -108.464660Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.812457 / -108.464571Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 1/1/2021             Measured TD: 9953 ft.    Vertical TD: 9953 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 1/1/2021
Wellbore Permit
Permit #:20052370 Expiration Date:8/7/2006
Proposed Depth/Form:9000 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number: 
Formation And Spacing:Code: MVRD , Formation: MESAVERDE , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: RLNS , Formation: ROLLINS , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: WSTC , Formation: WASATCH , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:7/1/2006
Spud Date:5/28/2006Spud Date Is:ACTUAL
Measured TD:9953 ft.Measured PB depth:
True Vertical TD:9953 ft.True Vertical PB depth:
Log Types:ULTRA SONIC IMAGER, ULTRA SONIC IMAGER/COLLARS/GAMMA RAY, PLEX-AI/GR, PLEX-CALIPER PRINT/GR, PLEX-POROSITY/DENSITY/GR
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 3033 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 795, Top: 0 ft., Bottom: 3033 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 3084 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 890, Top: 0 ft., Bottom: 9961 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH3022 ft.NN
OHIO CREEK5414 ft.NN
WILLIAMS FORK5616 ft.NN
CAMEO7923 ft.NN
ILES8459 ft.NN
LOYD SS9624 ft.NN

Formation SEGO                     Formation Classification:  GW                     Status:  PR - 1/1/2021                  Interval Top: 9084 ft.    Interval Bottom: 9310 ft.

 Completed Information for Formation SEGO
1st Production Date:3/28/2007Choke Size: 
Formation Name:SEGOCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:2/19/2007
Treatment Summary:FRAC'D WITH 18 BBLS NEFE HCL, 1708 BBLS SLICKWATER 50Q CO2 WITH 186,790# 20/40 PR6000 SAND FLUSHED WITH 140 BBLS SLICKWATER WITH 4% KCL
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation SEGO.
Perforation Data:
Interval Top:9084 ft.# Of Holes:33
Interval Bottom:9310 ft.Hole Size:0.4 in.

Formation CRCRN                   Formation Classification:  GW                   Status:  PR - 1/1/2021                  Interval Top: 8826 ft.    Interval Bottom: 8884 ft.

 Completed Information for Formation CORCORAN
1st Production Date:3/28/2007Choke Size: 
Formation Name:CORCORANCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:2/19/2007
Treatment Summary:FRAC'D WITH 55 BBLS SLICKWATER PAD, 100 BBLS SLICKWATER 50Q CO2, 135 BBLS SLICKWATER FLUSH
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CRCRN.
Perforation Data:
Interval Top:8826 ft.# Of Holes:18
Interval Bottom:8884 ft.Hole Size:0.4 in.

Formation CMEO                     Formation Classification:  GW                     Status:  PR - 1/1/2021                  Interval Top: 8212 ft.    Interval Bottom: 8394 ft.

 Completed Information for Formation CAMEO
1st Production Date:3/28/2007Choke Size: 
Formation Name:CAMEOCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:2/20/2007
Treatment Summary:FRAC'D WITH 18 BBLS NEFE HCL, 1233 BBLS SLICKWATER 50Q CO2 WITH 126,700# 20/40 PR6000 SAND FLUSHED WITH 101 BBLS SLICKWATER WITH 4% KCL
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CMEO.
Perforation Data:
Interval Top:8212 ft.# Of Holes:30
Interval Bottom:8394 ft.Hole Size:0.4 in.

Formation WFILS                   Formation Classification:  GW                   Status:  CM - 4/11/2007                 Interval Top: 8212 ft.    Interval Bottom: 9310 ft.

 Completed Information for Formation WILLIAMS FORK-ILES
1st Production Date:3/28/2007Choke Size:0.313 in.
Formation Name:WILLIAMS FORK-ILESCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:2/19/2007
Treatment Summary:
Tubing Size:2.375 in.Tubing Setting Depth:9050 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/11/2007Test Method:FLOW TO TANK
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 184
BTU_GAS 1135
CALC_BBLS_H2O 184
CALC_MCF_GAS 1100
CASING_PRESS 1750
GRAVITY_OIL 42
MCF_GAS 1100
TUBING_PRESS 1000
Perforation Data:
Interval Top:8212 ft.# Of Holes:81
Interval Bottom:9310 ft.Hole Size:0.4 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)17
Total Gas Produced (MCF)8297
GOR488058
GOR DeterminationMCFE
Average BOE per Day3.964
Average MCFE per Day23.023

 Federal Financial Assurance  i Y

 Tribal Well  i No