Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-103-10608
Well Classification: GW Status: PR - 3/1/2008
Well Name/No:FEDERAL RGU #31-32-198
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC 60734
Facility Status:PRStatus Date3/1/2008
FacilityID:278633LocationID:316478
County:RIO BLANCO #103Location:NWNE 32 1S98W 6
Field:SULPHUR CREEK - #80090Elevation:6494 ft.
Basin:PICEANCE BASIN  
Planned Location:1155FNL  1980 FELLat/Long: 39.924231 / -108.412730Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.924290 / -108.412751Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 3/1/2008             Measured TD: 10815 ft.    Vertical TD: 10809 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 3/1/2008
Wellbore Permit
Permit #:20062286 Expiration Date:7/11/2007
Proposed Depth/Form:10800 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit:RYAN GULCH UNIT Unit Number:COC 68239X
Formation And Spacing:Code: SEGO , Formation: SEGO , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-17 , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:8/28/2006
Spud Date:6/5/2006Spud Date Is:ACTUAL
Measured TD:10815 ft.Measured PB depth:10740 ft.
True Vertical TD:10809 ft.True Vertical PB depth:
Log Types:CBL; HIGH RES.INDUCTION/SPECTRAL DENSITY/DUAL SPACED NEUTRON
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 3414 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 2490, Top: 0 ft., Bottom: 3414 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 10750 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 2145, Top: 5035 ft., Bottom: 10750 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G4600 ft.NN
MESAVERDE6434 ft.NN
CAMEO9265 ft.NN
ROLLINS9726 ft.NN
COZZETTE9830 ft.NN
CORCORAN10056 ft.NN
SEGO10432 ft.NN

Formation SEGO                     Formation Classification:  GW                     Status:  PR - 3/1/2008                  Interval Top: 10427 ft.    Interval Bottom: 10724 ft.

 Completed Information for Formation SEGO
1st Production Date:9/16/2006Choke Size: 
Formation Name:SEGOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:9/7/2006
Treatment Summary:1500 GALS 10% HCL ACID; 157,100# 20/40 SAND; 3954 BBLS SLICKWATER
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation SEGO.
Perforation Data:
Interval Top:10427 ft.# Of Holes:66
Interval Bottom:10724 ft.Hole Size:0.42 in.

Formation CRCRN                   Formation Classification:  GW                   Status:  PR - 3/1/2008                  Interval Top: 10200 ft.    Interval Bottom: 10377 ft.

 Completed Information for Formation CORCORAN
1st Production Date:9/16/2006Choke Size: 
Formation Name:CORCORANCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:9/7/2006
Treatment Summary:750 GALS 10% HCL ACID; 77,000# 20/40 SAND; 2076 BBLS SLICKWATER
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CRCRN.
Perforation Data:
Interval Top:10200 ft.# Of Holes:31
Interval Bottom:10377 ft.Hole Size:0.42 in.

Formation COZZ                     Formation Classification:  GW                     Status:  PR - 3/1/2008                  Interval Top: 9830 ft.    Interval Bottom: 10377 ft.

 Completed Information for Formation COZZETTE
1st Production Date:9/16/2006Choke Size: 
Formation Name:COZZETTECommingled:
Production Method:
Open Hole Completion:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation COZZ.
No Perforation Data was found for formation COZZ.

Formation CMEO                     Formation Classification:  GW                     Status:  CM - 9/24/2006                 Interval Top: 9276 ft.    Interval Bottom: 9677 ft.

 Completed Information for Formation CAMEO
1st Production Date:9/16/2006Choke Size: 
Formation Name:CAMEOCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:9/7/2006
Treatment Summary:1500 GALS 7 1/2% HCL; 132500# 20/40 SAND; 3692 BBLS SLICKWATER
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CMEO.
Perforation Data:
Interval Top:9276 ft.# Of Holes:35
Interval Bottom:9677 ft.Hole Size:0.42 in.

Formation CRCMS                   Formation Classification:  GW                   Status:  CM - 9/24/2006                 Interval Top: 9276 ft.    Interval Bottom: 10724 ft.

 Completed Information for Formation CAMEO SAND-CORCORAN
1st Production Date:9/16/2006Choke Size:0.313 in.
Formation Name:CAMEO SAND-CORCORANCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:9/7/2006
Treatment Summary:3750 GALS 1/2% HCL; 366600# 20/40 SAND; 9722 BBLS SLICKWATER {FORMATION LISTED ON FORM AS "SEGO/CORCORAN/CAMEO"}
Tubing Size:2.375 in.Tubing Setting Depth:10542 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/24/2006Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
CALC_MCF_GAS 2020
CASING_PRESS 2100
TUBING_PRESS 1500
Perforation Data:
Interval Top:9276 ft.# Of Holes:90
Interval Bottom:10724 ft.Hole Size:0.42 in.

Formation ILES                     Formation Classification:  GW                     Status:  CM - 6/17/2007                 Interval Top: 7680 ft.    Interval Bottom: 10724 ft.

 Completed Information for Formation ILES
1st Production Date:9/16/2006Choke Size:0.313 in.
Formation Name:ILESCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:9/7/2006
Treatment Summary:10,640 GALS 10% HCL ACID; 1,022,400# 20/40 SAND; 194,050 BBLS SLICKWATER
Tubing Size:2.375 in.Tubing Setting Depth:10543 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/17/2007Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
CASING_PRESS 691
MCF_GAS 737
TUBING_PRESS 369
Perforation Data:
Interval Top:7680 ft.# Of Holes:308
Interval Bottom:10724 ft.Hole Size:0.42 in.

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 3/1/2008                  Interval Top: 7680 ft.    Interval Bottom: 9676 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:9/16/2006Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:9/7/2006
Treatment Summary:8390 GALS 10% HCL ACID; 788,300# 20/40 SAND; 18,802 BBLS SLICKWATER
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation WFCM.
Perforation Data:
Interval Top:7680 ft.# Of Holes:211
Interval Bottom:9676 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)33
Total Gas Produced (MCF)26071
GOR790030
GOR DeterminationMCFE
Average BOE per Day12.390
Average MCFE per Day71.886

 Federal Financial Assurance  i Y

 Tribal Well  i No