|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 4/25/2011 Measured TD: 11150 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 4/25/2011 | | Wellbore Permit | | | Permit #: | 20062284 | Expiration Date: | 7/11/2007 | | Proposed Depth/Form: | 11100 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEDERAL | Surface Owner: | FEDERAL | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: SEGO , Formation: SEGO , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: WMFK , Formation: WILLIAMS FORK , Order: , Unit Acreage: , Drill Unit: |
| | |
| Wellbore Completed | | Completion Date: | 6/2/2006 | | Spud Date: | 5/8/2006 | Spud Date Is: | ACTUAL | | Measured TD: | 11150 ft. | Measured PB depth: | 11090 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | CBL; HRI/SDL/DSN; BHC-SONIC; MUDLOG | | Casing: | String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 3219 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 1650, Top: 0 ft., Bottom: 3219 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 11129 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 1715, Top: 4200 ft., Bottom: 11129 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | WASATCH G | 4533 ft. | | N | N | | FORT UNION | 4799 ft. | | N | N | | MESAVERDE | 6531 ft. | | N | N | | CAMEO | 9536 ft. | | N | N | | ROLLINS | 9997 ft. | | N | N | | COZZETTE | 10150 ft. | | N | N | | CORCORAN | 10357 ft. | | N | N | | SEGO | 10708 ft. | | N | N |
Formation SEGO Formation Classification: GW Status: PR - 4/25/2011 Interval Top: 10816 ft. Interval Bottom: 10978 ft.| Completed Information for Formation SEGO | | 1st Production Date: | 7/1/2006 | Choke Size: | | | Formation Name: | SEGO | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 6/12/2006 | | Treatment Summary: | 750 GALS 10% HCL ACID; 71000# 20/40 SAND; 2581 BBLS SLICKWATER. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation SEGO. |
| | Perforation Data: | | Interval Top: | 10816 ft. | # Of Holes: | 20 | | Interval Bottom: | 10978 ft. | Hole Size: | 0.42 in. |
|
Formation CRCRN Formation Classification: GW Status: PR - 8/22/2011 Interval Top: 10495 ft. Interval Bottom: 10717 ft.| Completed Information for Formation CORCORAN | | 1st Production Date: | 7/1/2006 | Choke Size: | | | Formation Name: | CORCORAN | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 6/12/2006 | | Treatment Summary: | 750 GALS 10% HCL ACID; 458050# 20/40 SAND; 2496 BBLS SLICKWATER. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CRCRN. |
| | Perforation Data: | | Interval Top: | 10495 ft. | # Of Holes: | 18 | | Interval Bottom: | 10717 ft. | Hole Size: | 0.42 in. |
|
Formation COZZ Formation Classification: GW Status: PR - 8/22/2011 Interval Top: 10215 ft. Interval Bottom: 10327 ft.| Completed Information for Formation COZZETTE | | 1st Production Date: | 7/1/2006 | Choke Size: | | | Formation Name: | COZZETTE | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 6/13/2006 | | Treatment Summary: | 500 GALS 10% HCL ACID; 48050# 20/40 SAND; 2496 BBLS SLICKWATER. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation COZZ. |
| | Perforation Data: | | Interval Top: | 10215 ft. | # Of Holes: | 17 | | Interval Bottom: | 10327 ft. | Hole Size: | 0.42 in. |
|
Formation CZ-CR Formation Classification: GW Status: CM - 4/26/2010 Interval Top: 10215 ft. Interval Bottom: 10717 ft.| Completed Information for Formation COZZETTE-CORCORAN | | 1st Production Date: | 7/1/2006 | Choke Size: | | | Formation Name: | COZZETTE-CORCORAN | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 6/12/2006 | | Treatment Summary: | 1250 GALS 10% HCL ACID; 96,100# 20/40 SAND; 4992 BBLS SLICKWATER |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CZ-CR. |
| | Perforation Data: | | Interval Top: | 10215 ft. | # Of Holes: | 35 | | Interval Bottom: | 10717 ft. | Hole Size: | 0.42 in. |
|
Formation WFCM Formation Classification: GW Status: PR - 4/25/2011 Interval Top: 7355 ft. Interval Bottom: 9963 ft.| Completed Information for Formation WILLIAMS FORK - CAMEO | | 1st Production Date: | 7/1/2006 | Choke Size: | | | Formation Name: | WILLIAMS FORK - CAMEO | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 6/12/2006 | | Treatment Summary: | 8720 GALS 10% HCL ACID; 739100# 20/40 SAND; 20061 BBLS SLICKWATER. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation WFCM. |
| | Perforation Data: | | Interval Top: | 7355 ft. | # Of Holes: | 210 | | Interval Bottom: | 9963 ft. | Hole Size: | 0.42 in. |
|
Formation WFILS Formation Classification: GW Status: CM - 4/25/2011 Interval Top: 7355 ft. Interval Bottom: 10978 ft.| Completed Information for Formation WILLIAMS FORK-ILES | | 1st Production Date: | 7/1/2006 | Choke Size: | | | Formation Name: | WILLIAMS FORK-ILES | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 6/12/2006 | | Treatment Summary: | 10720 GALS 10% HCL ACID; 906200# 20/40 SAND; 27634 BBLS SLICKWATER (SUMMARY). |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 10927 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 1/10/2007 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 0 | | BBLS_OIL | 0 | | BTU_GAS | 1095 | | CASING_PRESS | 794 | | MCF_GAS | 379 | | TUBING_PRESS | 537 |
| | Perforation Data: | | Interval Top: | 7355 ft. | # Of Holes: | 265 | | Interval Bottom: | 10978 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 40 |
| Total Gas Produced (MCF) | 23057 |
| GOR | 576425 |
| GOR Determination | MCFE |
| Average BOE per Day | 11.005 |
| Average MCFE per Day | 63.838 |
| Federal Financial Assurance | i | Y |
|
|