| Formation Treatment |
| Treatment Type: | ACID JOB |
| Treatment Date: | 10/14/2024 | Treatment End Date: | 10/14/2024 |
| Treatment Summary: | PUMPED 4000 GALLONS (95.2 BBLS) 15% HCL W/SOLVENT AND 40 BBLS FRESH WATER
CONVERTED 07-31-2008 |
| Total fluid used in treatment (bbls): | 135 | Max pressure during treatment (psi): | 1900 |
| Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
| Type Of gas: | | Number Of staged intervals: | |
| Total acid used in treatment (bbls): | 95 | Min frac gradient (psi/ft): | |
| Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | |
| Fresh water used in treatment (bbls): | 40 | Disposition method For flowback: | |
| Total proppant used (lbs): | | Green completions techniques utilized: | -- |
| Reason green techniques Not utilized: |
| Formation Treatment |
| Treatment Type: | ACID JOB |
| Treatment Date: | 10/30/2013 | Treatment End Date: | 10/30/2013 |
| Treatment Summary: | PUMPED 4000 GALLONS 15% HCL ACID THRU END OF TUBING AT 6656' |
| Total fluid used in treatment (bbls): | 95 | Max pressure during treatment (psi): | 1100 |
| Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
| Type Of gas: | | Number Of staged intervals: | |
| Total acid used in treatment (bbls): | 95 | Min frac gradient (psi/ft): | |
| Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
| Fresh water used in treatment (bbls): | | Disposition method For flowback: | |
| Total proppant used (lbs): | | Green completions techniques utilized: | -- |
| Reason green techniques Not utilized: |
| Formation Treatment |
| Treatment Date: | 4/11/2011 |
| Treatment Summary: | ACID STIMULATION 4/11/2011 PUMPED 3000 GALLONS OF 20% HCL THROUGH ENDO F COILED TUBING @ 6650' |
| Formation Treatment |
| Treatment Date: | 7/15/2009 |
| Treatment Summary: | ACIDIZE FORMATION W/ 4,000 GALS HEATED 20% HCL, END OF COILED TUBING @ 6696'. |