Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-103-10549
Well Classification: OW Status: PR - 2/1/2023
Well Name/No:BEEZLEY #3X22
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:SCOUT ENERGY MANAGEMENT LLC - 10779
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date2/1/2023
FacilityID:276265LocationID:316448
County:RIO BLANCO #103Location:SWNE 22 2N103W 6
Field:RANGELY - #72370Elevation:5556 ft.
Planned Location:1544FNL  1445 FELLat/Long: 40.131555 / -108.938148Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.131660 / -108.938180Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 2/1/2023             Measured TD: 6733 ft.    Vertical TD: 6714 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 2/1/2023
Wellbore Permit
Permit #:20060242 Expiration Date:3/1/2007
Prop Depth/Form:6872 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit:RANGELY WEBR SD Unit Number:COC 47675X
Formation And Spacing:Code: WEBR , Formation: WEBER , Order: , Unit Acreage: 20, Drill Unit:

Wellbore Completed
Completion Date:7/2/2006
Spud Date:6/9/2006Spud Date Is:ACTUAL
Measured TD:6733 ft.Measured PB depth:6718 ft.
True Vertical TD:6714 ft.True Vertical PB depth:
Top PZ Location:Sec:22 Twp: 2N 103WFootage: 1337 FNL  1156 FELDepth
Bottom Hole Location:Sec:22 Twp: 2N 103WFootage: 1337 FNL  1156 FELDepth
Log Types:CEMENT BOND LOG
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 2052 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 790, Top: 0 ft., Bottom: 5203 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 6325 ft., Weight: 23 , Citings Type: ACTUAL
Cement:Sacks: 615, Top: 0 ft., Bottom: 6325 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
MORRISON3717 ft.NN
DAKOTA3887 ft.NN
CURTIS4560 ft.NN
ENTRADA4659 ft.NN
CARMEL4803 ft.NN
NAVAJO4852 ft.NN
CHINLE5494 ft.NN
SHINARUMP5610 ft.NN
MOENKOPI5678 ft.NN
WEBER6334 ft.NN

Formation WEBR                     Formation Classification:  OW                     Status:  PR - 2/1/2023                  Interval Top: 6334 ft.

 Completed Information for Formation WEBER
1st Production Date:8/30/2006Choke Size: 
Formation Name:WEBERCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:7/21/2006
Treatment Summary:FRACTURE STIMULATE IN 8 STAGES: #1 PUMP 120 BBL SCALE INHIBITOR AT 10 BPM. 914 PSI.#2 PUMP 640 BBL INHIBITOR FLUSH @60 BPM#3PUMP 167 BBL PAD AT 61 BPM AT ATP 1565. #4 PUMP 53.3 BBL 2.0 PPA 60 BPM@ 1678 #5 PUMP 85 BBL 4.0 PPA@61BPM ATP1673#6 PUMP 125 (CONT
Tubing Size:2.875 in.Tubing Setting Depth:6167 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:6452 ft.Open Hole Bottom:6733 ft.
Initial Test Data:
Test Date:8/31/2006Test Method:
Hours Tested:24Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 3239
BBLS_OIL 86
CALC_BBLS_H2O 3239
CALC_BBLS_OIL 86
CALC_GOR 849
CALC_MCF_GAS 73
GRAVITY_OIL 34
MCF_GAS 73
Perforation Data:
Interval Top:# Of Holes:
Interval Bottom:Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
June 2023 - May 2024i
Total Oil Produced (Barrels)10136
Total Gas Produced (MCF)0
GOR
GOR DeterminationBOE
Average BOE per Day27.675
Average MCFE per Day160.515

 Federal Financial Assurance  i Y

 Tribal Well  i No