|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: SI - 6/1/2025 Measured TD: 9760 ft. Vertical TD: 9598 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW SI - 6/1/2025 | | Wellbore Permit | DIRECTIONAL | | Permit #: | 20054084 | Expiration Date: | 12/4/2006 | | Proposed Top PZ Location: | Sec:10 Twp: 4S 98W | Footage: 330 FSL 1650 FEL | | Bottom Hole Location: | Sec:10 Twp: 4S 98W | Footage: 330 FSL 1650 FEL | | Proposed Depth/Form: | 10393 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEDERAL | Surface Owner: | FEDERAL | | Unit: | FIGURE FOUR UNI | Unit Number: | COC 66492X | | Formation And Spacing: | Code: ILES , Formation: ILES , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: OHCRK , Formation: OHIO CREEK , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: WMFK , Formation: WILLIAMS FORK , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: WSTC , Formation: WASATCH , Order: , Unit Acreage: , Drill Unit: | | Casing: | String Type: 2ND, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 10393 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 1112, Top: 5400 ft., Bottom: 10339 ft. |
| | |
| Wellbore Completed | | Completion Date: | 12/3/2005 | | Spud Date: | 11/11/2005 | Spud Date Is: | ACTUAL | | Measured TD: | 9760 ft. | Measured PB depth: | 9721 ft. | | True Vertical TD: | 9598 ft. | True Vertical PB depth: | 9559 ft. | | Top PZ Location: | Sec:10 Twp: 4S 98W | Footage: 379 FSL 1576 FEL | | Bottom Hole Location: | Sec:10 Twp: 4S 98W | Footage: 379 FSL 1576 FEL | | Log Types: | CBL, MUD | | Casing: | String Type: CONDUCTOR, Hole Size: 32 in., Size: 20 in., Top: 0 ft., Depth: 135 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 340, Top: 0 ft., Bottom: 135 ft., Determination Method: CALC | | Casing: | String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 3008 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 1765, Top: 988 ft., Bottom: 3008 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 6.25 in., Size: 4.5 in., Top: 0 ft., Depth: 9744 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 405, Top: 5341 ft., Bottom: 9760 ft., Determination Method: CALC | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 988 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 755, Top: 0 ft., Bottom: 988 ft., Determination Method: CALC | | Casing: | String Type: S.C. 2.1, Hole Size: , Size: , Top: , Depth: 5341 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 780, Top: 2477 ft., Bottom: 5341 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | WASATCH | 3219 ft. | 5489 ft. | N | N | | WILLIAMS FORK | 5489 ft. | 8725 ft. | N | N | | ROLLINS | 8725 ft. | 8872 ft. | N | N | | COZZETTE | 8872 ft. | 8994 ft. | N | N | | CORCORAN | 8994 ft. | 9273 ft. | N | N | | SEGO | 9273 ft. | 9760 ft. | N | N |
Formation SEGO Formation Classification: GW Status: SI - 9/1/2006 Interval Top: 9336 ft. Interval Bottom: 9630 ft.| Completed Information for Formation SEGO | | 1st Production Date: | 12/22/2006 | Choke Size: | | | Formation Name: | SEGO | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 5/23/2006 | | Treatment Summary: | Stages 1-2 treated with a total of 4849 bbls of Slickwater; 180,523 lbs 20-40 Sand, and 48 bbls 15% HCL. | | Formation Treatment | | Treatment Date: | 5/22/2006 | | Treatment Summary: | STAGES 1-2 TREATED W/ 4,849 BBLS SLICKWATER; 180,523 # 20/40 SAND; AND 48 BBLS 15% HCL. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 6503 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 12/23/2006 | Test Method: | Flowing | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 644 | | BTU_GAS | 1170 | | CALC_BBLS_H2O | 644 | | CALC_MCF_GAS | 509 | | CASING_PRESS | 1466 | | MCF_GAS | 509 | | TUBING_PRESS | 372 |
| | Perforation Data: | | Interval Top: | 9336 ft. | # Of Holes: | 45 | | Interval Bottom: | 9630 ft. | Hole Size: | 0.34 in. |
|
Formation WMFK Formation Classification: GW Status: SI - 6/1/2025 Interval Top: 6154 ft. Interval Bottom: 8441 ft.| Completed Information for Formation WILLIAMS FORK | | 1st Production Date: | 12/22/2006 | Choke Size: | 24.000 in. | | Formation Name: | WILLIAMS FORK | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 5/26/2006 | | Treatment Summary: | Stages 3-10 treated with a total of: 32113 bbls Slickwater; 1,274,257 lbs Sand, and 48 bbls 15% HCL | | Formation Treatment | | Treatment Date: | 5/24/2006 | | Treatment Summary: | STAGES 3-10 TREATED W/ 32,113 BBLS SLICKWATER; 1,274,257 # 20/40 SAND; AND 48 BBLS 15% HCL. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 6503 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 12/23/2006 | Test Method: | Flowing | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 644 | | BBLS_OIL | 0 | | BTU_GAS | 1170 | | CALC_BBLS_H2O | 644 | | CALC_BBLS_OIL | 0 | | CALC_GOR | 0 | | CALC_MCF_GAS | 509 | | CASING_PRESS | 1466 | | MCF_GAS | 509 | | TUBING_PRESS | 372 |
| | Perforation Data: | | Interval Top: | 6154 ft. | # Of Holes: | 210 | | Interval Bottom: | 8441 ft. | Hole Size: | 0.34 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | Y | Production Period 12/2024 - 11/2025 |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 21 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.011 |
| Average MCFE per Day | 0.056 |
| Federal Financial Assurance | i | Y |
|
|