Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-103-10417
Well Classification: GW Status: SI - 1/1/2026
Well Name/No:PICEANCE CREEK UNIT #T18X-12 GI
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date1/1/2026
FacilityID:271043LocationID:335771
County:RIO BLANCO #103Location:SWSW 12 2S97W 6
Field:PICEANCE CREEK - #68800Elevation:7168 ft.
Basin:PICEANCE BASIN  
Planned Location:528FSL  23 FWLLat/Long: 39.885942 / -108.238184Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.885740 / -108.238180Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: SI - 1/1/2026             Measured TD: 12800 ft.    Vertical TD: 12670 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        SI - 1/1/2026
Wellbore Permit
Permit #:20032611 Expiration Date:1/29/2005
Proposed Depth/Form:14000 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit:PICEANCE CRK UN Unit Number:COC 47666X
Formation And Spacing:Code: MVRD , Formation: MESAVERDE , Order: , Unit Acreage: 160, Drill Unit:
Formation And Spacing:Code: WSTC , Formation: WASATCH , Order: , Unit Acreage: 160, Drill Unit:
Casing:String Type: CONDUCTOR, Hole Size: 17.5 in., Size: 14 in., Top: , Depth: 80 ft., Weight: , Citings Type: PLANNED
Cement:Sacks: 50, Top: 0 ft., Bottom: 80 ft.

Wellbore Completed
Completion Date:8/31/2004
Spud Date:3/20/2004Spud Date Is:ACTUAL
Measured TD:12800 ft.Measured PB depth:12660 ft.
True Vertical TD:12670 ft.True Vertical PB depth:12530 ft.
Log Types:GR, CN, SONIC, DIR-SUR, BOREHOLE GRAPHIC
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 3267 ft., Weight: 43.5 , Citings Type: ACTUAL
Cement:Sacks: 842, Top: 0 ft., Bottom: 3267 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 4.5 in., Top: , Depth: 12800 ft., Weight: 15.1 , Citings Type: ACTUAL
Cement:Sacks: 995, Top: 6180 ft., Bottom: 12800 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
OHIO CREEK7360 ft.7536 ft.NN
WILLIAMS FORK7928 ft.11545 ft.NN
ROLLINS11545 ft.11745 ft.NN
COZZETTE11745 ft.12030 ft.NN
CORCORAN12030 ft.12800 ft.NN

Formation CRCRN                   Formation Classification:  GW                   Status:  SI - 10/1/2024                 Interval Top: 12040 ft.    Interval Bottom: 12594 ft.

 Completed Information for Formation CORCORAN
1st Production Date:8/31/2004Choke Size:0.750 in.
Formation Name:CORCORANCommingled:Yes
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:8/31/2004
Treatment Summary:FRAC'D W/168,000# 40/70 SD. RE PERF'D & 12308-12. SET CIBP @ 12080'. PERF'D 12040-44 & FRAC'D W/34,000# 40/70 SD.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/30/2004Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 79
BBLS_OIL 0
CALC_BBLS_H2O 79
CALC_BBLS_OIL 0
CALC_MCF_GAS 56
CASING_PRESS 407
MCF_GAS 56
Perforation Data:
Interval Top:12040 ft.# Of Holes:80
Interval Bottom:12594 ft.Hole Size:2.125 in.

Formation COZZ                     Formation Classification:  GW                     Status:  SI - 10/1/2024                 Interval Top: 11850 ft.    Interval Bottom: 11854 ft.

 Completed Information for Formation COZZETTE
1st Production Date:8/31/2004Choke Size:0.750 in.
Formation Name:COZZETTECommingled:Yes
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:8/31/2004
Treatment Summary:FRAC'D W/43,000# 40/70 SD.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/30/2004Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 30
BBLS_OIL 0
CALC_BBLS_H2O 30
CALC_BBLS_OIL 0
CALC_MCF_GAS 21
CASING_PRESS 407
MCF_GAS 21
Perforation Data:
Interval Top:11850 ft.# Of Holes:16
Interval Bottom:11854 ft.Hole Size:2.125 in.

Formation CMEO                     Formation Classification:  GW                     Status:  CM - 6/8/2005                  Interval Top: 11340 ft.    Interval Bottom: 11459 ft.

 Completed Information for Formation CAMEO
1st Production Date:8/31/2004Choke Size: 
Formation Name:CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:8/31/2004
Treatment Summary:SEE SCANNED DOC 1401011
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CMEO.
Perforation Data:
Interval Top:11340 ft.# Of Holes:32
Interval Bottom:11459 ft.Hole Size:2.125 in.

Formation WFCM                     Formation Classification:  GW                     Status:  SI - 1/1/2026                  Interval Top: 8544 ft.    Interval Bottom: 11459 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:8/31/2004Choke Size:0.750 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:Yes
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:8/31/2004
Treatment Summary:FRAC'D PERFS W/ A TOTAL OF 562,800 # 30/50 SD, AND 924,600# 40/70 SAND.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/30/2004Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 663
BBLS_OIL 0
CALC_BBLS_H2O 663
CALC_BBLS_OIL 0
CALC_MCF_GAS 471
CASING_PRESS 407
MCF_GAS 471
Perforation Data:
Interval Top:8544 ft.# Of Holes:370
Interval Bottom:11459 ft.Hole Size:2.125 in.

Formation WMFK                     Formation Classification:  GW                     Status:  CM - 7/1/2012                  Interval Top: 8544 ft.    Interval Bottom: 9360 ft.

 Completed Information for Formation WILLIAMS FORK
1st Production Date:8/31/2004Choke Size: 
Formation Name:WILLIAMS FORKCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:8/31/2004
Treatment Summary:SEE WELL FILE
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 0
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CALC_MCF_GAS 100
CASING_PRESS 1534
MCF_GAS 100
Perforation Data:
Interval Top:8544 ft.# Of Holes:112
Interval Bottom:9360 ft.Hole Size:2.125 in.

Formation OHCRK                   Formation Classification:  GW                   Status:  SI - 10/1/2024                 Interval Top: 7445 ft.    Interval Bottom: 7514 ft.

 Completed Information for Formation OHIO CREEK
1st Production Date:8/31/2004Choke Size:0.750 in.
Formation Name:OHIO CREEKCommingled:Yes
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:8/31/2004
Treatment Summary:FRAC'D W/212,070# 40/70 AND 30/50 SAND. DRLD. OUT ALL PLUGS TO PBTD OF 12660'.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/30/2004Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 18
BBLS_OIL 0
CALC_BBLS_H2O 18
CALC_BBLS_OIL 0
CALC_MCF_GAS 13
CASING_PRESS 407
MCF_GAS 13
Perforation Data:
Interval Top:7445 ft.# Of Holes:56
Interval Bottom:7514 ft.Hole Size:2.125 in.
Primary Well Designation:
Low Producing      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingYProduction Period
12/2024 - 11/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR DeterminationMCFE
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i Y

 Tribal Well  i No