Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-103-10380
Well Classification: GW Status: PR - 2/1/2017
Well Name/No:RYAN GULCH FEDERAL #F24X-32G
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC 57961
Facility Status:PRStatus Date2/1/2017
FacilityID:269540LocationID:316369
County:RIO BLANCO #103Location:SESW 32 1S97W 6
Field:LOVE RANCH - #51850Elevation:6127 ft.
Basin:PICEANCE BASIN  
Planned Location:1221FSL  1587 FWLLat/Long: 39.916281 / -108.309067Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.916310 / -108.309150Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 2/1/2017             Measured TD: 12670 ft.    Vertical TD: 12640 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 2/1/2017
Wellbore Permit
Permit #:20031665 Expiration Date:9/24/2004
Proposed Depth/Form:13650 ft.
Surface Mineral Owner Same:Not available
Mineral Owner:Not availableSurface Owner:FEDERAL
Unit: Unit Number: 
Formation And Spacing:Code: MVRD , Formation: MESAVERDE , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: WSTC , Formation: WASATCH , Order: , Unit Acreage: , Drill Unit:
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 20 in., Top: , Depth: 80 ft., Weight: , Citings Type: PLANNED
Cement:Sacks: 125, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: 2ND, Hole Size: 8.5 in., Size: 5.5 in., Top: , Depth: 13650 ft., Weight: 23 , Citings Type: PLANNED
Cement:Sacks: 1100, Top: 9000 ft., Bottom: 13650 ft.

Wellbore Completed
Completion Date:11/15/2005
Spud Date:7/11/2004Spud Date Is:ACTUAL
Measured TD:12670 ft.Measured PB depth:12606 ft.
True Vertical TD:12640 ft.True Vertical PB depth:12576 ft.
Log Types:CMT, SONIC, EX AT, G/R, EX D/N
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 2263 ft., Weight: 47 , Citings Type: ACTUAL
Cement:Sacks: 697, Top: 0 ft., Bottom: 2263 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 12970 ft., Weight: 15 , Citings Type: ACTUAL
Cement:Sacks: 722, Top: 4000 ft., Bottom: 12670 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
OHIO CREEK6895 ft.7380 ft.NN
WABAUNSEE7350 ft.10628 ft.NN
CAMEO10628 ft.10881 ft.NN
ROLLINS10881 ft.11055 ft.NN
COZZETTE11055 ft.11330 ft.NN
CORCORAN11330 ft.12202 ft.NN
SEGO12202 ft.12670 ft.NN

Formation SEGO                     Formation Classification:  GW                     Status:  PR - 2/1/2017                  Interval Top: 12206 ft.    Interval Bottom: 12434 ft.

 Completed Information for Formation SEGO
1st Production Date:N/AChoke Size:0.344 in.
Formation Name:SEGOCommingled:Yes
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:11/15/2005
Treatment Summary:PERF'D 12430-434; 12216-218 AND 12206-210. FRAC'D W/ A TOTAL OF 183,600# OF PROPPANT 40/70 RCS. SET FRAC PLUG @ 11856'.
Tubing Size:2.375 in.Tubing Setting Depth:11288 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:12/26/2004Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 1
BBLS_OIL 24
CALC_BBLS_H2O 1
CALC_BBLS_OIL 24
CALC_GOR 6875
CALC_MCF_GAS 165
CASING_PRESS 1554
MCF_GAS 165
TUBING_PRESS 1200
Perforation Data:
Interval Top:12206 ft.# Of Holes:36
Interval Bottom:12434 ft.Hole Size:2.5 in.

Formation CRCRN                   Formation Classification:  GW                   Status:  PR - 2/1/2017                  Interval Top: 11380 ft.    Interval Bottom: 11834 ft.

 Completed Information for Formation CORCORAN
1st Production Date:N/AChoke Size:0.344 in.
Formation Name:CORCORANCommingled:Yes
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:11/15/2005
Treatment Summary:PERF'D 11830-834; 11752-756; 11605-609; 11450-454. FRAC'D W/326,950# PROPPANT 40/70 RCS. SET FRAC PLUG @ 11410'. PERF'D 11380-384. FRAC'D W/52,000# PROPPANT 40/70 RCS
Tubing Size:2.375 in.Tubing Setting Depth:11288 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:12/26/2004Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 2
BBLS_OIL 4
CALC_BBLS_H2O 2
CALC_BBLS_OIL 4
CALC_GOR 77000
CALC_MCF_GAS 308
CASING_PRESS 1554
MCF_GAS 308
TUBING_PRESS 1200
Perforation Data:
Interval Top:11380 ft.# Of Holes:80
Interval Bottom:11834 ft.Hole Size:2.125 in.

Formation COZZ                     Formation Classification:  GW                     Status:  PR - 2/1/2017                  Interval Top: 11239 ft.    Interval Bottom: 11329 ft.

 Completed Information for Formation COZZETTE
1st Production Date:N/AChoke Size:0.344 in.
Formation Name:COZZETTECommingled:No
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:11/15/2005
Treatment Summary:PERF'D 11325-329; 11239-243. FRAC'D W/ A TOTAL OF 71,000# OF PROPPANT 40/70 RCS. SET FRAC PLUG @ '.
Tubing Size:2.375 in.Tubing Setting Depth:11288 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:12/26/2004Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 1
BBLS_OIL 1
CALC_BBLS_H2O 1
CALC_BBLS_OIL 1
CALC_GOR 97000
CALC_MCF_GAS 97
CASING_PRESS 1554
MCF_GAS 97
TUBING_PRESS 1200
Perforation Data:
Interval Top:11239 ft.# Of Holes:36
Interval Bottom:11329 ft.Hole Size:2.5 in.

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 2/1/2017                  Interval Top: 7674 ft.    Interval Bottom: 10754 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:N/AChoke Size:0.344 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:Yes
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:11/15/2005
Treatment Summary:PERF'D 10750-754. FRAC'D W/ 53000# PROP. SET FRAC PLUG @ 10645'. PERF'D 10618-622. FRAC'D W/ 58400# PROPPANT. PERF'D 10472-476; 10340-344 & 10220-224. FRAC'D W/ 247500# PROPPANT. SET FRAC PLUG @ 10198'. PERF'D 10170-174; 10082-86 & 9914-18. FRAC'D W/ 171115# PROPPANT. SET CFP @ 9864'. PERF'D 9833-37; 9722-26; 9574-78 AND 9210-14. FRAC'D W/ 229000# PROPPNAT. SET PLUG-FAILED. DO ALL PLUGS. CO TO 12605'. TURNED WELL TO SALES. SET CFP @ 9180'. PERF'D 9150-54 & FRAC'D W/ 73140# PROPPANT. PERF'D 9060-64 & FRAC'D W/ 60260# PROPPANT. PERF'D 9002-06. SET CFP @ 7866'. PERF'D 7850-54; 7796-7800 & 7674-78. FRAC'D W/ 224160# PROPPANT.
Tubing Size:2.375 in.Tubing Setting Depth:11288 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:12/26/2004Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 8
BBLS_OIL 14
CALC_BBLS_H2O 8
CALC_BBLS_OIL 14
CALC_GOR 89143
CALC_MCF_GAS 1248
CASING_PRESS 1554
MCF_GAS 1248
TUBING_PRESS 1200
Perforation Data:
Interval Top:7674 ft.# Of Holes:288
Interval Bottom:10754 ft.Hole Size:2.125 in.

Formation WMFK                     Formation Classification:  GW                     Status:  CM - 6/11/2014                 Interval Top: 7674 ft.    Interval Bottom: 10754 ft.

 Completed Information for Formation WILLIAMS FORK
1st Production Date:12/26/2004Choke Size:0.344 in.
Formation Name:WILLIAMS FORKCommingled:Yes
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:11/15/2005
Treatment Summary:PERF'D 10750-754. FRAC'D W/ 53000# PROP. SET FRAC PLUG @ 10645' .PERF'D 10618-622. FRAC'D W/ 58400# PROPPANT. PERF'D 10472-476; 10340-344 & 10220-224. FRAC'D W/ 247500# PROPPANT. SET FRAC PLUG @ 10198'. PERF'D 10170-174; 10082-86 & 9914-18. FRAC'D W/ 171115# PROPPANT. SET CFP @ 9864'. PERF'D 9833-37; 9722-26; 9574-78 AND 9210-14. FRAC'D W/ 229000# PROPPANT. SET PLUG-FAILED. DO ALL PLUGS. CO TO 12605' TURNED WELL TO SALES. SET CFP @ 9180'. PERF'D 9150-54 & FRAC'D W/ 73140# PROPPANT. PERF'D 9060-64 & FRAC'D W/ 60260# PROPPANT. PERF'D 9002-06. SET CFP @ 7866'. PERF'D 7850-54; 7796-7800 & 7674-78. FRAC'D W/ 224160# PROPPANT.
Tubing Size:2.375 in.Tubing Setting Depth:11288 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:12/26/2004Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 8
BBLS_OIL 14
CALC_BBLS_H2O 8
CALC_BBLS_OIL 14
CALC_GOR 89143
CALC_MCF_GAS 1248
CASING_PRESS 1554
MCF_GAS 1248
TUBING_PRESS 1200
Perforation Data:
Interval Top:7674 ft.# Of Holes:288
Interval Bottom:10754 ft.Hole Size:2.125 in.

Formation OHCRK                   Formation Classification:  GW                   Status:  PR - 2/1/2017                  Interval Top: 6914 ft.    Interval Bottom: 7274 ft.

 Completed Information for Formation OHIO CREEK
1st Production Date:N/AChoke Size:0.344 in.
Formation Name:OHIO CREEKCommingled:Yes
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:11/15/2005
Treatment Summary:PERF'D 7270-74. FRAC'D W/183080# PROPPANT. SET CFP @ 7110'. PERF'D 7078-82; 6980-84 & 6914-18. FRAC'D W/449200# PROPPANT. DRL'D OUT CFP'S.
Tubing Size:2.375 in.Tubing Setting Depth:11288 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:12/26/2004Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 1
BBLS_OIL 2
CALC_BBLS_H2O 1
CALC_BBLS_OIL 2
CALC_GOR 85500
CALC_MCF_GAS 171
CASING_PRESS 1554
MCF_GAS 171
TUBING_PRESS 1200
Perforation Data:
Interval Top:6914 ft.# Of Holes:64
Interval Bottom:7274 ft.Hole Size:2.125 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)148
Total Gas Produced (MCF)19346
GOR130716
GOR DeterminationMCFE
Average BOE per Day9.599
Average MCFE per Day55.650

 Federal Financial Assurance  i Y

 Tribal Well  i No