Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-103-10367
Well Classification: GW Status: PR - 10/1/2011
Well Name/No:FEDERAL #398-7-2
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC 60743
Facility Status:PRStatus Date10/1/2011
FacilityID:269653LocationID:316362
County:RIO BLANCO #103Location:NENW 7 3S98W 6
Field:SULPHUR CREEK - #80090Elevation:6697 ft.
Basin:PICEANCE BASIN  
Planned Location:966FNL  2223 FWLLat/Long: 39.807982 / -108.435359Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.807980 / -108.435387Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 10/1/2011             Measured TD: 10114 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 10/1/2011
Wellbore Permit
Permit #:20064284 Expiration Date:8/24/2007
Proposed Depth/Form:10100 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number: 
Formation And Spacing:Code: CMEO , Formation: CAMEO , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: CMEOC , Formation: CAMEO COAL , Order: , Unit Acreage: , Drill Unit: NE NW
Formation And Spacing:Code: ILES , Formation: ILES , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: MVRD , Formation: MESAVERDE , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: SEGO , Formation: SEGO , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: WSTC , Formation: WASATCH , Order: , Unit Acreage: , Drill Unit:
Casing:String Type: 2ND, Hole Size: 7.875 in., Size: 5.5 in., Top: , Depth: 8500 ft., Weight: 17 , Citings Type: PLANNED
Cement:Sacks: 795, Top: 3250 ft., Bottom: 8500 ft.
Casing:String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 4250 ft., Weight: , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:5/9/2006
Spud Date:3/19/2006Spud Date Is:ACTUAL
Measured TD:10114 ft.Measured PB depth:10000 ft.
True Vertical TD:True Vertical PB depth:
Log Types:CBL/GR/CCL, CALIPER/CV/GR, PE- CD/GR, PE-AI/GR
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 2976 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 635, Top: 0 ft., Bottom: 2976 ft., Determination Method: CBL
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 2700 ft., Depth: 10100 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 1550, Top: 2700 ft., Bottom: 10100 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH2643 ft.NN
OHIO CREEK5433 ft.NN
WILLIAMS FORK5583 ft.NN
CAMEO7913 ft.NN
ILES8407 ft.NN
LOYD SS9622 ft.NN

Formation SEGO                     Formation Classification:  GW                     Status:  SI - 7/1/2025                  Interval Top: 9028 ft.    Interval Bottom: 9642 ft.

 Completed Information for Formation SEGO
1st Production Date:N/AChoke Size: 
Formation Name:SEGOCommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:6/27/2006
Treatment Summary:28K GALS SW W/50%N2, 58K GALS SW PAD, 221K GALS SW CARRYING 251LBS 30/50 WHITE SAND, FLUSHED W/18KGALS SW
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation SEGO.
Perforation Data:
Interval Top:9028 ft.# Of Holes:66
Interval Bottom:9642 ft.Hole Size:0.25 in.

Formation CRCRN                   Formation Classification:  GW                   Status:  SI - 7/1/2025                  Interval Top: 8720 ft.    Interval Bottom: 8886 ft.

 Completed Information for Formation CORCORAN
1st Production Date:N/AChoke Size: 
Formation Name:CORCORANCommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:6/28/2006
Treatment Summary:8K GALS SW W/ 50%N2, 15K GALS SW PAD, 51K GALS SW CARRYING 62K LBS 30/50 BROWN SAND, FLUSHED W/ 5670 GALS SW
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CRCRN.
Perforation Data:
Interval Top:8720 ft.# Of Holes:27
Interval Bottom:8886 ft.Hole Size:0.25 in.

Formation CMCRSG                 Formation Classification:  GW                 Status:  CM - 3/20/2020                 Interval Top: 7904 ft.    Interval Bottom: 9642 ft.

 Completed Information for Formation CAMEO-CORCORAN-SEGO
1st Production Date:N/AChoke Size: 
Formation Name:CAMEO-CORCORAN-SEGOCommingled:No
Production Method:
Open Hole Completion:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CMCRSG.
Perforation Data:
Interval Top:7904 ft.# Of Holes:150
Interval Bottom:9642 ft.Hole Size:0.25 in.

Formation CMEO                     Formation Classification:  GW                     Status:  PR - 10/1/2011                 Interval Top: 7904 ft.    Interval Bottom: 8362 ft.

 Completed Information for Formation CAMEO
1st Production Date:N/AChoke Size: 
Formation Name:CAMEOCommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:6/28/2006
Treatment Summary:16K GALS SW W/50%N2, 33K GALS SW PAD, 115K GALS SW CARRYING 158K LBS 30/50 BROWN SAND, FLUSHED W/ 10K GALS SW
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CMEO.
Perforation Data:
Interval Top:7904 ft.# Of Holes:57
Interval Bottom:8362 ft.Hole Size:0.25 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)8
Total Gas Produced (MCF)4657
GOR582125
GOR DeterminationMCFE
Average BOE per Day2.227
Average MCFE per Day12.922

 Federal Financial Assurance  i Y

 Tribal Well  i No