|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 4/20/2004 Measured TD: 4007 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 4/20/2004 | | Wellbore Permit | | | Permit #: | 20031267 | Expiration Date: | 7/15/2004 | | Proposed Depth/Form: | 2493 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEDERAL | Surface Owner: | FEDERAL | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: LOYD , Formation: LOYD SS , Order: SS-318 , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: MNCSA , Formation: MANCOS A , Order: SS-318 , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: SEGO , Formation: SEGO , Order: SS-318 , Unit Acreage: , Drill Unit: |
| | |
| Wellbore Completed | | Completion Date: | 4/9/2004 | | Spud Date: | 1/27/2004 | Spud Date Is: | ACTUAL | | Measured TD: | 4007 ft. | Measured PB depth: | 3952 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | CBL/GR/RSL | | Casing: | String Type: SURF, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 460 ft., Weight: 20 , Citings Type: ACTUAL | | Cement: | Sacks: 98, Top: 0 ft., Bottom: 460 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 6.25 in., Size: 4.5 in., Top: 0 ft., Depth: 4007 ft., Weight: 10.5 , Citings Type: ACTUAL | | Cement: | Sacks: 330, Top: 570 ft., Bottom: 4007 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | LOYD SS | 2182 ft. | | N | N | | MANCOS A | 2479 ft. | | N | N | | MANCOS B | 3584 ft. | | N | N |
Formation MNCSB Formation Classification: OW Status: PR - 4/20/2004 Interval Top: 3612 ft. Interval Bottom: 3860 ft.| Completed Information for Formation MANCOS B | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | MANCOS B | Commingled: | No | | Production Method: | PUMPING | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 4/9/2004 | | Treatment Summary: | STAGE 1: ACID BALLOUT, 3612-3860, 26-0.340" SHOTS, 1986 BBLS OF 30Q CO2 24# LINEAR GEL, 150080# 20-40 SAND. INSTALL HYDRAULIC PUMP. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 3905 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 4/20/2004 | Test Method: | PUMPING | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 20 | | BBLS_OIL | 770 | | CALC_BBLS_H2O | 20 | | CALC_BBLS_OIL | 70 | | CALC_GOR | 12 | | CALC_MCF_GAS | 83 | | CASING_PRESS | 76 | | MCF_GAS | 83 |
| | Perforation Data: | | Interval Top: | 3612 ft. | # Of Holes: | 26 | | Interval Bottom: | 3860 ft. | Hole Size: | 0.34 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 4537 |
| Total Gas Produced (MCF) | 11012 |
| GOR | 2427 |
| GOR Determination | BOE |
| Average BOE per Day | 17.678 |
| Average MCFE per Day | 102.540 |
| Federal Financial Assurance | i | Y |
|
|