Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-103-10336
Well Classification: OW Status: PR - 4/1/2020
Well Name/No:FEE #156X
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:SCOUT ENERGY MANAGEMENT LLC - 10779
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date4/1/2020
FacilityID:268465LocationID:316348
County:RIO BLANCO #103Location:SESE 18 2N102W 6
Field:RANGELY - #72370Elevation:5364 ft.
Planned Location:1158FSL  1175 FELLat/Long: 40.138975 / -108.880896Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.138990 / -108.880900Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 4/1/2020             Measured TD: 6518 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 4/1/2020
Wellbore Permit
Permit #:20031022 Expiration Date:6/25/2004
Prop Depth/Form:6470 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit:RANGELY WEBR SA Unit Number:72370
Formation And Spacing:Code: WEBR , Formation: WEBER , Order: 20 , Unit Acreage: 19143, Drill Unit:
Casing:String Type: 3RD, Hole Size: , Size: 7 in., Top: , Depth: 6200 ft., Weight: 23 , Citings Type: PLANNED
Cement:Sacks: 950, Top: , Bottom: 6200 ft.

Wellbore Completed
Completion Date:3/6/2004
Spud Date:1/6/2004Spud Date Is:ACTUAL
Measured TD:6518 ft.Measured PB depth:6518 ft.
True Vertical TD:True Vertical PB depth:
Top PZ Location:Sec: Twp: Footage: 1158 FSL  1175 FELDepth
Bottom Hole Location:Sec: Twp: Footage:  FL   FLDepth
Log Types:
Casing:String Type: SURF, Hole Size: 18 in., Size: 16 in., Top: 0 ft., Depth: 45 ft., Weight: 32 , Citings Type: ACTUAL
Cement:Sacks: 870, Top: , Bottom: , Determination Method:
Casing:String Type: 1ST, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 1031 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 505, Top: 0 ft., Bottom: , Determination Method:
Casing:String Type: 2ND, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 6222 ft., Weight: 23 , Citings Type: ACTUAL
Cement:Sacks: 750, Top: , Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
FRONTIER3272 ft.NN
DAKOTA3628 ft.NN
MORRISON3709 ft.NN
CURTIS4426 ft.NN
ENTRADA4532 ft.NN
CARMEL4673 ft.NN
CHINLE4673 ft.NN
NAVAJO4727 ft.NN
SHINARUMP5467 ft.NN
MOENKOPI5559 ft.NN
WEBER6230 ft.NN

Formation WEBR                     Formation Classification:  OW                     Status:  PR - 4/1/2020                  Interval Top: 6210 ft.    Interval Bottom: 6518 ft.

 Completed Information for Formation WEBER
1st Production Date:N/AChoke Size: 
Formation Name:WEBERCommingled:No
Production Method:SUBMERSIBLE PUMP
Open Hole Completion:Yes
Formation Treatment
Treatment Date:3/6/2004
Treatment Summary:6210 - 6518'
Tubing Size:2.875 in.Tubing Setting Depth:6210 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:3/6/2004Test Method:24 HR TEST
Hours Tested:24Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 3558
BBLS_OIL 263
GRAVITY_OIL 34
MCF_GAS 233
Perforation Data:
Interval Top:6210 ft.# Of Holes:
Interval Bottom:6518 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
June 2023 - May 2024i
Total Oil Produced (Barrels)2783
Total Gas Produced (MCF)0
GOR
GOR DeterminationBOE
Average BOE per Day7.599
Average MCFE per Day44.077

 Federal Financial Assurance  i 

 Tribal Well  i No