|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 4/1/2025 Measured TD: 14440 ft. Vertical TD: 14435 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 4/1/2025 | | Wellbore Permit | | | Permit #: | 20053531 | Expiration Date: | 10/23/2006 | | Proposed Depth/Form: | 14440 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEDERAL | Surface Owner: | FEDERAL | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: MVRD , Formation: MESAVERDE , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: OHCRK , Formation: OHIO CREEK , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: WSTC , Formation: WASATCH , Order: , Unit Acreage: , Drill Unit: | | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 20 in., Top: , Depth: 80 ft., Weight: , Citings Type: PLANNED | | Cement: | Sacks: 125, Top: 0 ft., Bottom: 80 ft. | | Casing: | String Type: SURF, Hole Size: 17.5 in., Size: 13.375 in., Top: , Depth: 2770 ft., Weight: 68 , Citings Type: PLANNED | | Cement: | Sacks: 1300, Top: 0 ft., Bottom: 2770 ft. | | Casing: | String Type: 1ST, Hole Size: 12.25 in., Size: 9.625 in., Top: , Depth: 8233 ft., Weight: 53.5 , Citings Type: PLANNED | | Cement: | Sacks: 700, Top: 2137 ft., Bottom: 8233 ft. | | Casing: | String Type: 2ND, Hole Size: 8.5 in., Size: 5.5 in., Top: , Depth: 14440 ft., Weight: 23 , Citings Type: PLANNED | | Cement: | Sacks: 1325, Top: 6800 ft., Bottom: 14440 ft. |
| | |
| Wellbore Completed | | Completion Date: | 11/23/2003 | | Spud Date: | 7/1/2003 | Spud Date Is: | ACTUAL | | Measured TD: | 14440 ft. | Measured PB depth: | 13400 ft. | | True Vertical TD: | 14435 ft. | True Vertical PB depth: | 13394 ft. | | Log Types: | CC-GR-CNL | | Casing: | String Type: SURF, Hole Size: 17.5 in., Size: 13.375 in., Top: 0 ft., Depth: 2770 ft., Weight: 68 , Citings Type: ACTUAL | | Cement: | Sacks: 1300, Top: 0 ft., Bottom: 2770 ft., Determination Method: CBL | | Casing: | String Type: 1ST, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 8233 ft., Weight: 53.5 , Citings Type: ACTUAL | | Cement: | Sacks: 400, Top: , Bottom: , Determination Method: | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 5290 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 300, Top: 2137 ft., Bottom: 8233 ft., Determination Method: CALC | | Casing: | String Type: 2ND, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 14440 ft., Weight: 23 , Citings Type: ACTUAL | | Cement: | Sacks: 1325, Top: 6800 ft., Bottom: 14440 ft., Determination Method: CALC | | Formation | Interval Top | Log Bottom | Cored | DSTs | | ROLLINS | 12175 ft. | 12454 ft. | N | N | | COZZETTE | 12626 ft. | 12864 ft. | N | N | | CORCORAN | 12982 ft. | 13240 ft. | N | N |
Formation CSLGT Formation Classification: GW Status: PR - 4/1/2025 Interval Top: 14110 ft. Interval Bottom: 14326 ft.| Completed Information for Formation CASTLEGATE | | 1st Production Date: | 4/1/2004 | Choke Size: | 0.828 in. | | Formation Name: | CASTLEGATE | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 10/31/2003 | | Treatment Summary: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 4/17/2006 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 5 | | BBLS_OIL | 0 | | CALC_BBLS_H2O | 7 | | CALC_BBLS_OIL | 0 | | CALC_GOR | 0 | | CALC_MCF_GAS | 7 | | CASING_PRESS | 1735 | | MCF_GAS | 42 |
| | Perforation Data: | | Interval Top: | 14110 ft. | # Of Holes: | 66 | | Interval Bottom: | 14326 ft. | Hole Size: | 0.32 in. |
|
Formation SEGO Formation Classification: GW Status: PR - 4/1/2025 Interval Top: 13768 ft. Interval Bottom: 13777 ft.| Completed Information for Formation SEGO | | 1st Production Date: | 4/1/2004 | Choke Size: | 0.828 in. | | Formation Name: | SEGO | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 11/3/2003 | | Treatment Summary: | NOTE - UNABLE TO MILL PAST OBSTRUCTION IN WELL AT 13,736. PERFORATIONS IN SEGO ARE OPEN FOR PRODUCTION |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 4/17/2006 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 8 | | BBLS_OIL | 0 | | CALC_BBLS_H2O | 11 | | CALC_BBLS_OIL | 0 | | CALC_GOR | 0 | | CALC_MCF_GAS | 10 | | CASING_PRESS | 1735 | | MCF_GAS | 65 | | TUBING_PRESS | 140 |
| | Perforation Data: | | Interval Top: | 13768 ft. | # Of Holes: | 36 | | Interval Bottom: | 13777 ft. | Hole Size: | 0.32 in. |
|
Formation CRCRN Formation Classification: GW Status: PR - 4/1/2025 Interval Top: 12716 ft. Interval Bottom: 13240 ft.| Completed Information for Formation CORCORAN | | 1st Production Date: | 4/1/2004 | Choke Size: | 0.828 in. | | Formation Name: | CORCORAN | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 12/3/2003 | | Treatment Summary: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 4/17/2006 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 12 | | BBLS_OIL | 0 | | CALC_BBLS_H2O | 17 | | CALC_BBLS_OIL | 0 | | CALC_GOR | 0 | | CALC_MCF_GAS | 16 | | CASING_PRESS | 1735 | | MCF_GAS | 100 |
| | Perforation Data: | | Interval Top: | 12716 ft. | # Of Holes: | 80 | | Interval Bottom: | 13240 ft. | Hole Size: | 0.32 in. |
|
Formation COZZ Formation Classification: GW Status: PR - 4/1/2025 Interval Top: 12450 ft. Interval Bottom: 12630 ft.| Completed Information for Formation COZZETTE | | 1st Production Date: | 4/1/2004 | Choke Size: | 0.828 in. | | Formation Name: | COZZETTE | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 12/5/2003 | | Treatment Summary: | DO CIBP @ 12620' |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 4/17/2006 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 3 | | BBLS_OIL | 0 | | CALC_BBLS_H2O | 5 | | CALC_BBLS_OIL | 0 | | CALC_GOR | 0 | | CALC_MCF_GAS | 4 | | CASING_PRESS | 1735 | | MCF_GAS | 28 |
| | Perforation Data: | | Interval Top: | 12450 ft. | # Of Holes: | 32 | | Interval Bottom: | 12630 ft. | Hole Size: | 0.32 in. |
|
Formation RLNS Formation Classification: GW Status: PR - 4/1/2025 Interval Top: 12185 ft. Interval Bottom: 12193 ft.| Completed Information for Formation ROLLINS | | 1st Production Date: | 4/1/2004 | Choke Size: | 0.828 in. | | Formation Name: | ROLLINS | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 12/12/2003 | | Treatment Summary: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 4/17/2006 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 3 | | BBLS_OIL | 0 | | CALC_BBLS_H2O | 4 | | CALC_BBLS_OIL | 0 | | CALC_GOR | 0 | | CALC_MCF_GAS | 4 | | CASING_PRESS | 1735 | | MCF_GAS | 24 |
| | Perforation Data: | | Interval Top: | 12185 ft. | # Of Holes: | 32 | | Interval Bottom: | 12193 ft. | Hole Size: | 0.32 in. |
|
Formation WFCM Formation Classification: GW Status: PR - 4/1/2025 Interval Top: 8126 ft. Interval Bottom: 12057 ft.| Completed Information for Formation WILLIAMS FORK - CAMEO | | 1st Production Date: | 11/24/2005 | Choke Size: | 0.828 in. | | Formation Name: | WILLIAMS FORK - CAMEO | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 11/24/2005 | | Treatment Summary: | DO CIBP @ 10230' |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 11010 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 4/17/2006 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 60 | | BBLS_OIL | 0 | | CALC_BBLS_H2O | 83 | | CALC_BBLS_OIL | 0 | | CALC_GOR | 0 | | CALC_MCF_GAS | 78 | | CASING_PRESS | 1735 | | MCF_GAS | 493 |
| | Perforation Data: | | Interval Top: | 8126 ft. | # Of Holes: | 414 | | Interval Bottom: | 12057 ft. | Hole Size: | 0.32 in. |
|
Formation WMFK Formation Classification: GW Status: CM - 11/24/2005 Interval Top: 8126 ft. Interval Bottom: 10164 ft.| Completed Information for Formation WILLIAMS FORK | | 1st Production Date: | 11/23/2003 | Choke Size: | 0.828 in. | | Formation Name: | WILLIAMS FORK | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 11/23/2003 | | Treatment Summary: | CIBP SET AT 10260' TO ISOLATE ORIGINAL PERFS FROM 10344-14326'. THIS PLUG WILL NOT BE DRILLED OT UNTIL 12/15/2005. SET PLUGS AT 9336' AND 8380'. FRAC WITH 722,942 LBS 30/70 BRADY SAND AND 383,712 GALLONS GEL FLUID. 11/24/2005 24 HOUR COMMINGLED TEST |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 9605 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 11/24/2005 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| CALC_BBLS_H2O | 119 | | CALC_BBLS_OIL | 0 | | CALC_GOR | 0 | | CALC_MCF_GAS | 51 | | CASING_PRESS | 1735 | | TUBING_PRESS | 113 |
| | Perforation Data: | | Interval Top: | 8126 ft. | # Of Holes: | 222 | | Interval Bottom: | 10164 ft. | Hole Size: | 0.36 in. |
|
Formation OHCRK Formation Classification: GW Status: PR - 4/1/2025 Interval Top: 7856 ft. Interval Bottom: 8008 ft.| Completed Information for Formation OHIO CREEK | | 1st Production Date: | 11/24/2005 | Choke Size: | 0.828 in. | | Formation Name: | OHIO CREEK | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 11/14/2005 | | Treatment Summary: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 4/17/2006 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| CALC_BBLS_H2O | 4 | | CALC_BBLS_OIL | 0 | | CALC_GOR | 0 | | CALC_MCF_GAS | 4 | | CASING_PRESS | 1735 | | TUBING_PRESS | 113 |
| | Perforation Data: | | Interval Top: | 7856 ft. | # Of Holes: | 32 | | Interval Bottom: | 8008 ft. | Hole Size: | 0.32 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 3977 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 1.872 |
| Average MCFE per Day | 10.836 |
| Federal Financial Assurance | i | Y |
|
|