|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: SI - 6/1/2022 Measured TD: 7175 ft. Vertical TD: 7035 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW SI - 6/1/2022 | Wellbore Permit | DIRECTIONAL | Permit #: | 20020184 | Expiration Date: | 3/24/2003 | Proposed Top PZ Location: | Sec:19 Twp: 2N 96W | Footage: 1980 FNL 1980 FWL | Bottom Hole Location: | Sec:19 Twp: 2N 96W | Footage: 1980 FNL 1980 FWL | Proposed Depth/Form: | 7220 ft. | Surface Mineral Owner Same: | Yes | Mineral Owner: | FEDERAL | Surface Owner: | FEDERAL | Unit: | ANT HILL UNIT | Unit Number: | | Formation And Spacing: | Code: WMRCM , Formation: WILLIAMS FK-ROLLINS-CAMEO , Order: , Unit Acreage: , Drill Unit: |
| | |
Wellbore Completed | Completion Date: | 7/29/2002 | Spud Date: | 6/17/2002 | Spud Date Is: | ACTUAL | Measured TD: | 7175 ft. | Measured PB depth: | 7116 ft. | True Vertical TD: | 7035 ft. | True Vertical PB depth: | 6976 ft. | Top PZ Location: | Sec: Twp: | Footage: FL FL | Bottom Hole Location: | Sec: Twp: | Footage: | Log Types: | DIL - CAL - SP - FDC - CNL | Casing: | String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 1138 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 590, Top: 0 ft., Bottom: 1138 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 7175 ft., Weight: 17 , Citings Type: ACTUAL | Cement: | Sacks: 715, Top: , Bottom: 7175 ft., Determination Method: CALC | Formation | Interval Top | Log Bottom | Cored | DSTs | WASATCH | 0 ft. | 1090 ft. | N | N | OHIO CREEK | 3090 ft. | 3897 ft. | N | N | WILLIAMS FORK | 3897 ft. | | N | N | CAMEO | 6831 ft. | | N | N | ROLLINS | 7060 ft. | | N | N |
Formation WMFK Formation Classification: GW Status: SI - 6/1/2022 Interval Top: 6118 ft. Interval Bottom: 7026 ft. Completed Information for Formation WILLIAMS FORK | 1st Production Date: | N/A | Choke Size: | 0.500 in. | Formation Name: | WILLIAMS FORK | Commingled: | No | Production Method: | FLOWING | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 7/29/2002 | Treatment Summary: | 6964-7026'; FRACED DN 5.5" CSG W/HALCO STIM FLUID, 3800# 100 MESH, 96,000# 20/40 WHITE SAND. 6846-6927'; FRACED DN 5.5" CSG W/HALCO STIM FLUID, 4000# 100 MESH, 28,500# 20/40 WHITE SAND. 6790-6804'; FRACED DN 5.5" CSG W/HALOC SILVER STIM FLUID,63,000 # |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 6047 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 8/3/2002 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 70 | CALC_BBLS_H2O | 70 | CALC_MCF_GAS | 1687 | CASING_PRESS | 1460 | MCF_GAS | 1687 | TUBING_PRESS | 830 |
| Perforation Data: | Interval Top: | 6118 ft. | # Of Holes: | 212 | Interval Bottom: | 7026 ft. | Hole Size: | 3 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive (SI ) | Y | Defined Inactive 05/31/2022 |
Low Producing | Y | Production Period 01/2024 - 12/2024 |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | MCFE |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | Y |
|
|