|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: SI - 3/1/2024 Measured TD: 6950 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW SI - 3/1/2024 | | Wellbore Permit | | | Permit #: | 20020075 | Expiration Date: | 1/15/2003 | | Proposed Depth/Form: | 6950 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEDERAL | Surface Owner: | FEDERAL | | Unit: | ANT HILL UNIT | Unit Number: | COC-65320X | | Formation And Spacing: | Code: WMRCM , Formation: WILLIAMS FK-ROLLINS-CAMEO , Order: , Unit Acreage: , Drill Unit: |
| | |
| Wellbore Completed | | Completion Date: | 6/26/2002 | | Spud Date: | 5/13/2002 | Spud Date Is: | ACTUAL | | Measured TD: | 6950 ft. | Measured PB depth: | | | True Vertical TD: | | True Vertical PB depth: | | | Top PZ Location: | Sec: Twp: | Footage: FL FL | | Bottom Hole Location: | Sec: Twp: | Footage: FL FL | | Log Types: | DIL - CAL - SP - FDC - CNL | | Casing: | String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 1077 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 200, Top: 0 ft., Bottom: 1077 ft., Determination Method: CBL | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 6950 ft., Weight: 15.5 , Citings Type: ACTUAL | | Cement: | Sacks: 410, Top: 475 ft., Bottom: 6950 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | WASATCH | 0 ft. | 3015 ft. | N | N | | OHIO CREEK | 3015 ft. | 3782 ft. | N | N | | WILLIAMS FORK | 3782 ft. | | N | N | | CAMEO | 6548 ft. | | N | N | | ROLLINS | 6790 ft. | | N | N |
Formation WMFK Formation Classification: GW Status: SI - 3/1/2024 Interval Top: 5916 ft. Interval Bottom: 6711 ft.| Completed Information for Formation WILLIAMS FORK | | 1st Production Date: | N/A | Choke Size: | 0.313 in. | | Formation Name: | WILLIAMS FORK | Commingled: | No | | Production Method: | FLOWING | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 6/26/2002 | | Treatment Summary: | 6632'-6711' FRACED DOWN 5.5" CSG W/BJ VISTAR FLUID, 9800# 100 MESH, 136,000# WHITE SAND, 4000# FLEXSAND MSE 14/30 MESH. 6456'-6470' FRACED DOWN 5.5" CSG W/BJ VISTAR FLUID, 38,000# 20/40 WHITE SAND, 2000# FLEXSAND MSE 14/30. 6116'-6186' FRACED DOWN 5.5 " |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 6621 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 7/10/2002 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 50 | | BBLS_OIL | 0 | | BTU_GAS | 1500 | | CALC_BBLS_H2O | 50 | | CALC_MCF_GAS | 1322 | | CASING_PRESS | 1600 | | MCF_GAS | 1322 | | TUBING_PRESS | 250 |
| | Perforation Data: | | Interval Top: | 5916 ft. | # Of Holes: | 136 | | Interval Bottom: | 6711 ft. | Hole Size: | 3 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | Y | Noticed Date 12/29/2025 |
| Defined Inactive (SI ) | Y | Defined Inactive 02/29/2024 |
| Low Producing | Y | Production Period 10/2024 - 09/2025 |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | Y |
|
|