Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-103-10213
Well Classification: GW Status: SI - 3/1/2023
Well Name/No:ANT HILL UNIT #29-11
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KT RESOURCES LLC - 10775
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:C 0127221
Facility Status:SIStatus Date3/1/2023
FacilityID:261840LocationID:316309
County:RIO BLANCO #103Location:NWNW 29 2N96W 6
Field:WHITE RIVER - #92800Elevation:6024 ft.
Planned Location:660FNL  660 FWLLat/Long: 40.118539 / -108.195945Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.118456 / -108.195937Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: SI - 3/1/2023             Measured TD: 7065 ft.    Vertical TD: 6962 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        SI - 3/1/2023
Wellbore Permit
Permit #:20030471 Expiration Date:3/25/2004
Proposed Depth/Form:7050 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit:ANT HILL Unit Number:COC 65320X
Formation And Spacing:Code: WMRCM , Formation: WILLIAMS FK-ROLLINS-CAMEO , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:7/20/2003
Spud Date:6/12/2003Spud Date Is:ACTUAL
Measured TD:7065 ft.Measured PB depth:
True Vertical TD:6962 ft.True Vertical PB depth:
Top PZ Location:Sec: Twp: Footage:  FL   FL
Bottom Hole Location:Sec: Twp: Footage:     
Log Types:CNL, TRIPLE LITHO DEN, ARRAY IND W/ LINER PLATFORM EXPRESS CBL
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 1136 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 350, Top: 0 ft., Bottom: 1136 ft., Determination Method: CBL
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 7048 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 665, Top: , Bottom: 7065 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH0 ft.2996 ft.NN
OHIO CREEK2996 ft.3815 ft.NN
WILLIAMS FORK3815 ft.NN
CAMEO6683 ft.NN
ROLLINS6960 ft.NN

Formation WMFK                     Formation Classification:  GW                     Status:  SI - 3/1/2023                  Interval Top: 5927 ft.    Interval Bottom: 6879 ft.

 Completed Information for Formation WILLIAMS FORK
1st Production Date:N/AChoke Size:0.375 in.
Formation Name:WILLIAMS FORKCommingled:No
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:7/20/2003
Treatment Summary:1: FRAC DN CSG W/ DS YF 3251PH 20Q CO2 W/ 48,300# 20/40 SAND. SCREENED OUT W/ 25,500# SAND IN FORMATION. 2: FRAC DN CSG W/ DS YF 325IPH 20Q CO2 W/ 77,500# 20/40 SAND. 3: FRAC DN CSG W/ DS YF 325IPH 20Q CO2 W/ 118,000# 20/40 SAND. 4: FRAC DN CSG W/ DS YF 325IPH 20Q CO2 W/ 136,000# 20/40 SAND. 5: FRAC DN CSG W/ DS YF 325IPH 20Q CO2 W/ 65,900# 20/40 SAND.
Tubing Size:2.375 in.Tubing Setting Depth:6795 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/20/2003Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 80
BBLS_OIL 0
CASING_PRESS 580
MCF_GAS 819
TUBING_PRESS 100
Perforation Data:
Interval Top:5927 ft.# Of Holes:237
Interval Bottom:6879 ft.Hole Size:3 in.
Primary Well Designation:
Defined Inactive      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined Inactive (SI )YDefined Inactive
02/28/2023
Low ProducingYProduction Period
01/2024 - 12/2024

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2024 - December 2024i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR DeterminationMCFE
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i Y

 Tribal Well  i No