|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: SI - 3/1/2023 Measured TD: 7065 ft. Vertical TD: 6962 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW SI - 3/1/2023 | Wellbore Permit | | Permit #: | 20030471 | Expiration Date: | 3/25/2004 | Proposed Depth/Form: | 7050 ft. | Surface Mineral Owner Same: | Yes | Mineral Owner: | FEDERAL | Surface Owner: | FEDERAL | Unit: | ANT HILL | Unit Number: | COC 65320X | Formation And Spacing: | Code: WMRCM , Formation: WILLIAMS FK-ROLLINS-CAMEO , Order: , Unit Acreage: , Drill Unit: |
| | |
Wellbore Completed | Completion Date: | 7/20/2003 | Spud Date: | 6/12/2003 | Spud Date Is: | ACTUAL | Measured TD: | 7065 ft. | Measured PB depth: | | True Vertical TD: | 6962 ft. | True Vertical PB depth: | | Top PZ Location: | Sec: Twp: | Footage: FL FL | Bottom Hole Location: | Sec: Twp: | Footage: | Log Types: | CNL, TRIPLE LITHO DEN, ARRAY IND W/ LINER PLATFORM EXPRESS CBL | Casing: | String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 1136 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 350, Top: 0 ft., Bottom: 1136 ft., Determination Method: CBL | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 7048 ft., Weight: 17 , Citings Type: ACTUAL | Cement: | Sacks: 665, Top: , Bottom: 7065 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | WASATCH | 0 ft. | 2996 ft. | N | N | OHIO CREEK | 2996 ft. | 3815 ft. | N | N | WILLIAMS FORK | 3815 ft. | | N | N | CAMEO | 6683 ft. | | N | N | ROLLINS | 6960 ft. | | N | N |
Formation WMFK Formation Classification: GW Status: SI - 3/1/2023 Interval Top: 5927 ft. Interval Bottom: 6879 ft. Completed Information for Formation WILLIAMS FORK | 1st Production Date: | N/A | Choke Size: | 0.375 in. | Formation Name: | WILLIAMS FORK | Commingled: | No | Production Method: | FLOWING | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 7/20/2003 | Treatment Summary: | 1: FRAC DN CSG W/ DS YF 3251PH 20Q CO2 W/ 48,300# 20/40 SAND. SCREENED OUT W/ 25,500# SAND IN FORMATION. 2: FRAC DN CSG W/ DS YF 325IPH 20Q CO2 W/ 77,500# 20/40 SAND. 3: FRAC DN CSG W/ DS YF 325IPH 20Q CO2 W/ 118,000# 20/40 SAND. 4: FRAC DN CSG W/ DS YF 325IPH 20Q CO2 W/ 136,000# 20/40 SAND. 5: FRAC DN CSG W/ DS YF 325IPH 20Q CO2 W/ 65,900# 20/40 SAND. |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 6795 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 7/20/2003 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 80 | BBLS_OIL | 0 | CASING_PRESS | 580 | MCF_GAS | 819 | TUBING_PRESS | 100 |
| Perforation Data: | Interval Top: | 5927 ft. | # Of Holes: | 237 | Interval Bottom: | 6879 ft. | Hole Size: | 3 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive (SI ) | Y | Defined Inactive 02/28/2023 |
Low Producing | Y | Production Period 01/2024 - 12/2024 |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | MCFE |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | Y |
|
|