|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: SI - 2/1/2024 Measured TD: 7200 ft. Vertical TD: 7144 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW SI - 2/1/2024 | Wellbore Permit | | Permit #: | 012052 | Expiration Date: | 11/25/2002 | Proposed Depth/Form: | 7200 ft. | Surface Mineral Owner Same: | Yes | Mineral Owner: | FEDERAL | Surface Owner: | FEDERAL | Unit: | ANT HILL | Unit Number: | COC-65320X | Formation And Spacing: | Code: WFCM , Formation: WILLIAMS FORK - CAMEO , Order: , Unit Acreage: , Drill Unit: |
| | |
Wellbore Completed | Completion Date: | 9/1/2002 | Spud Date: | 6/24/2002 | Spud Date Is: | ACTUAL | Measured TD: | 7200 ft. | Measured PB depth: | | True Vertical TD: | 7144 ft. | True Vertical PB depth: | | Top PZ Location: | Sec: Twp: | Footage: FL FL | Bottom Hole Location: | Sec: Twp: | Footage: | Log Types: | DIL-CAL-SP-GR-FDC-CNL | Casing: | String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 1082 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 225, Top: 0 ft., Bottom: 1082 ft., Determination Method: CBL | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 7200 ft., Weight: 17 , Citings Type: ACTUAL | Cement: | Sacks: 437, Top: , Bottom: 7200 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | WASATCH | 0 ft. | 3188 ft. | N | N | OHIO CREEK | 3188 ft. | 3980 ft. | N | N | WILLIAMS FORK | 3980 ft. | | N | N | CAMEO | 6821 ft. | | N | N | ROLLINS | 7072 ft. | | N | N |
Formation WMFK Formation Classification: GW Status: SI - 2/1/2024 Interval Top: 6287 ft. Interval Bottom: 6992 ft. Completed Information for Formation WILLIAMS FORK | 1st Production Date: | N/A | Choke Size: | 0.500 in. | Formation Name: | WILLIAMS FORK | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 9/1/2002 | Treatment Summary: | 6824-6992': FRACED DN 5.5" CSG W/ BJ VISTAR 18 LT FLUID, 11,490# 100 MESH, 156,890# 20/40 WHITE SAND, 4100# FLEXSAND MSE 14/30 MESH. 6582-6728': FRACED DN 5.5" CSG W/ BJ VISTAR 18 LT FLUID, 60,500# 20/40 WHITE SAND, 2148# FLEXSAND MSE 14/30 MESH. 6478-6524': FRACED DN 5.5" CSG W/ BJ VISTAR 18 LT FLUID, 60,653# 20/40 WHITE SAND, 2093# FLEXSAND MSE 14/30 MESH. 6287-6338': FRACED DN 5.5" CSG W/ BJ VISTAR 18 LT FLUID, 4460# 100 MESH, 61,045# 20/40 WHITE SAND, 2215# FLEXSAND MSE 14/30 MESH. |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 6811 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 10/3/2002 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | WET | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 0 | BBLS_OIL | 0 | BTU_GAS | 150 | CASING_PRESS | 1580 | MCF_GAS | 2360 | TUBING_PRESS | 250 |
| Perforation Data: | Interval Top: | 6287 ft. | # Of Holes: | 144 | Interval Bottom: | 6992 ft. | Hole Size: | 3 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | Y | Production Period 01/2024 - 12/2024 |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 1041 |
GOR | |
GOR Determination | MCFE |
Average BOE per Day | 0.134 |
Average MCFE per Day | 0.782 |
Federal Financial Assurance | i | Y |
|
|