Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-103-10189
Well Classification: GW Status: SI - 5/1/2022
Well Name/No:ANT HILL UNIT #16-22
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KT RESOURCES LLC - 10775
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date5/1/2022
FacilityID:260977LocationID:316298
County:RIO BLANCO #103Location:SENW 16 2N96W 6
Field:WHITE RIVER - #92800Elevation:6146 ft.
Planned Location:2051FNL  1815 FWLLat/Long: 40.143499 / -108.173045Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.143629 / -108.172904Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: SI - 5/1/2022             Measured TD: 8130 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        SI - 5/1/2022
Wellbore Permit
Permit #:011561 Expiration Date:8/14/2002
Proposed Depth/Form:7875 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit:ANT HILL UNIT Unit Number:COC-65320X
Formation And Spacing:Code: WFCM , Formation: WILLIAMS FORK - CAMEO , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:6/27/2002
Spud Date:5/7/2002Spud Date Is:ACTUAL
Measured TD:8130 ft.Measured PB depth:8060 ft.
True Vertical TD:True Vertical PB depth:
Log Types:DIL - CAL - SP - GR - FDC - CNL
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 1108 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 426, Top: 0 ft., Bottom: 1108 ft., Determination Method: CBL
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 8130 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 870, Top: 0 ft., Bottom: 8130 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH0 ft.3810 ft.NN
OHIO CREEK3810 ft.4710 ft.NN
WILLIAMS FORK4710 ft.NN
CAMEO7705 ft.NN
ROLLINS8061 ft.NN

Formation WMFK                     Formation Classification:  GW                     Status:  SI - 5/1/2022                  Interval Top: 7058 ft.    Interval Bottom: 7977 ft.

 Completed Information for Formation WILLIAMS FORK
1st Production Date:N/AChoke Size:0.313 in.
Formation Name:WILLIAMS FORKCommingled:No
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:6/27/2002
Treatment Summary:7838-7977' FRACED DN 5.5" CSG W/BJ VISTAR 18 LT FLUID, 11,185# 100 MESH, 149,628# WHITE SAND,4216# FLEXSAND MSE 14/30 MESH. 7366-7464' FRACED DN 5.5" CSG W/BJ VISTAR 18 LT FLUID, 99,628# 20/40 WHITE SAND, 4216# FLEXSAND MSE 14/30 MESH. 7273-7329' FRACED
Tubing Size:2.375 in.Tubing Setting Depth:7823 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/21/2002Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 50
BBLS_OIL 0
BTU_GAS 400
CALC_BBLS_OIL 0
CALC_MCF_GAS 2236
CASING_PRESS 880
MCF_GAS 2236
TUBING_PRESS 250
Perforation Data:
Interval Top:7058 ft.# Of Holes:192
Interval Bottom:7977 ft.Hole Size:3 in.
Primary Well Designation:
Defined Inactive      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined Inactive (SI )YDefined Inactive
04/30/2022
Low ProducingYProduction Period
01/2024 - 12/2024

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2024 - December 2024i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR DeterminationMCFE
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i Y

 Tribal Well  i No